Project Completion Report. Project Summary Client: WorleyParsons / FMG Contract No.:510P-00000- PU-PC-0059 PROJECT DELIVERABLESTARGETACTUAL SafetyNil.

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Batching & Blending Plant
TurnKey Project Management Services Capabilities Briefing.
Product Receiving, Storing, and Issuing
Supervision and Administration
Subpart R Steel Erection
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
Project Completion Report. Project Summary Client: MTU Detroit Diesel Australia Contract No.: PROJECT DELIVERABLESTARGETACTUAL SafetyNil LTINIL.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Project Close Out CTC-470.
MC and Commissioning Preparation
Process Engineer’s Role in Project Management Dr Abdullah Malik.
KPIs in Practice - ‘A Model for Success
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
The Federal Railroad Administration (FRA) is an agency that belongs to the United States Department of Transportation. The agency was created by the Department.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 A Member of the Team Focus Group Integrated Management Systems Industry View 2 Michael Thompson BSc (Eng), FFICE, MCIWEM Roe Thompson Limited.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Project Completion Report
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
The Federal Railroad Administration (FRA) is an agency that belongs to the United States Department of Transportation. The agency was created by the Department.
Contract Training Class I
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Designer/Contractor JV- Apron Services Projects- A Winning Case
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA.
9186D Project Completion Report. Project Summary Client: FAST / BHP Contract No.: 1646-P PROJECT DELIVERABLESTARGETACTUAL SafetyNil Incidents ScopeAs.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
1 Product Presentation January Normal BinROXELL Bin Old feed Normal bin: ‘centerflow’ feed flows first in center  bridging ‘mass flow’ feed.
LCLS-II Cryoplant Overview
THE CONSTRUCTION TECHNOLOGY CONSULTANTS Lowther-Rolton Established 1987 Safety Quality Leadership Innovation Commitment The Methodology and Benefits of.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
Group AGM 12 th December Achievements FY 2012/13… Growth in Revenue to c£3.27M (£1.6M 2011/12) Profit achieved c£432k (£76k 2011/12) New clients.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Legal Requirements to Import Machinery and Equipment into Mexico
Ryan Thurston | Duncan McLennan
AGENDA INDUSTRIAL DAY – Rome
Product Presentation January 2010.
826YD 21/2”-10”.
News and brief overview of Beamline plans for the next few months
Program Control Services – Overview
Traceability of Gas Pipeline Materials Research & Materials Manager
System Review – The Forgotten Implementation Step
Introduction DEFINATION :-
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
Installation Binder / IRR – an example
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Polarized 3He target installation
Fiber Reinforced Polymer Systems
Presentation transcript:

Project Completion Report

Project Summary Client: WorleyParsons / FMG Contract No.:510P PU-PC-0059 PROJECT DELIVERABLESTARGETACTUAL SafetyNil LTINIL ScopeFabricate and supply two dust collection and disposal systems including associated tippler cell plate work As per target SchedulePC 28/10/2011PC 24/02/2012 Budget$9,869,999$11,191,043 Margin$2,241,014 (22.7%)$4,138,308 (36.9%) Quality (NCR)01 Customer Satisfaction Score80% or above>80%

Project Overview The FMG 155Mtpa Port Expansion Project aimed to increase the current port capacity at Anderson Point, Port Hedland from 45 Mtpa to 155 Mtpa. The project included two train unloader stations TU602 and TU603, each capable of tipping two rail cars concurrently as part of the unloading operation. The driving desire was to fast track the design and construction of TU602 and TU603 to gain initiatives typically associated with being early to market.

Project Overview Parties Involved Primary Stakeholder:FMG EPCM:WorleyParsons Supply Contractor:Aerison Aerison’s Scope Design, fabricate & ready for transport…… Two off dust collection and disposal systems Two off forced air ventilation systems Two off tippler cell and end ring dust enclosure systems Two off trunnion level pressurisation systems Two off compressed air supply systems

Project Overview

Design

Lycopodium A repeat of TU601 (completed 2008) Design Changes Agglomerator removed from dust slurrying system Design upgrade of slurry hopper Bin fogging system removed Larger capacity ventilation and pressurisation fans Two off compressed air supply systems New layout of ventilation & pressurisation ducting

Fabrication – In House Baghouse Lower wall seals Lower ring seals Upper ring seals Fan access platform Top SectionMid Section

Fabrication – In House Lower Wall Seal HoppersLower ring seal Upper Ring Seal

Fabrication – In House Fan Access Platforms

Fabrication – Sub Contractor Shedder panelsArch Engineering Push air wallsArch Engineering Slurry hoppersArch Engineering Batch hopper & chutesArch Engineering Hood wallPhillips Engineering Trunnion wallPhillips Engineering Dirty & clean air ductSabre Ventilation & pressurisation ductUnique Metals FansTurbo Air PumpsMining & Hydraulic CompressorsSullAir Australia ConveyorsSanwest Rotary & slide valvesAnsac Structural steelFremantle Steel Surface treatmentFerogalv Cape Novacoat DRA

Fabrication – Sub Contractor Push Air Wall - Arch Shedder Panels - Arch Push Air Wall Duct - Arch

Fabrication – Sub Contractor Slurry Hopper - Arch Batch Hoppers - ArchChutes - Arch

Fabrication – Sub Contractor Dirty Air Duct - Sabre Trunnion Wall - PhillipsHood Wall - Phillips Clean Air Stack - Sabre

Fabrication – Sub Contractor Main ID Fans - TAT Ventilation/Pressurisation Duct - Unique Ventilation Fans - TAT

Fabrication – Sub Contractor Conveyors - SanWest Pump – MHSCompressor - SullAir Rotary/Slide Valves - Ansac

Project Pictures – Commissioning Pre-Assembled Plate Work Trunnion LevelTippler Cell

Project Pictures – Commissioning Installed Wall & Lower Ring Seals Ground Level OverviewInstall of Tippler Cell

Project Pictures – Commissioning Upper Level Construction

Project Pictures – Commissioning TU602 System

Project Summary Safety and Environment Target – Nil IncidentActual – 1 (Lost load) Note: Baghouse top section fell from trailer en route to site. Transport under the control of WorleyParsons Internal issue with use of incorrect bolts Comments Safety and environment record for project excellent No reported incidents from sub contractors

Project Summary Scope of Works Target - Original Contract Scope of WorksTotal Number of SCN’s 17 Total Approved 13 Comments 4 month extension of time Over $1.2 million in variations Installation assistance Commissioning (no load) Commissioning (load)

Project Summary Schedule

Project Summary Schedule

Project Summary Schedule

Project Summary Schedule Original Contract Delivery 28/10/2011Actual Practical Completion – 24/02/2012 Comments Design delays at beginning of project Delay in client issuing AFC drawings Extension of time and costs negotiated and approved Revised schedule of deliverables

Project Summary Budget and Margin

Project Summary Budget and Margin Original Contract Sum $9,869,999Expected Final $11,191,043 Original Contract Margin $2,241,014 (22.7%)Expected Final $ 4,138,308 (36.9%) Includes Site based income: $250,000Margin: $62,000 (25%)) Comments Over budget items were:- QA / Doc Control(-$32,237) Transport / Cranes(-$2,489) Engineering subcontract(-$1,330) Load cells (-$3,357) Under budget items were:- Fabrication Compressors Construction management Engineering Drafting

Project Summary Quality Target – Nil Quality Issues or NCR’sActual – 1 NCR NCR issued by client for release breach (Due to client not managing transport – signed by Aerison under protest) Comments Internal fabrication checks Sub contractor quality review documentation Tracking

Issues Unfinished Duct Invoice management – maintain upper hand Progress reports / checks Early identification of problems and implementation of controls Sabre

Issues Damaged Baghouse Top Section Transport readiness Photographs Quality documentation Lost Load

Issues Bolt take offs Trial fit outs Painting – Sabre Tagging Conveyor not reversible Batch hopper flexible Rotary valve underspeeds Plastic fittings on damaged baghouse Forgotten items (Tracking sheet)

Project Summary Human Resources Comments Expeditor QA Engineering Document Control Safety Management

Project Summary Communications Comments Internal Sub contractor Client Site

Project Summary Client Satisfaction

Project Summary Lesson Learnt Expediting Transport Quality Contract management – Sabre Tracking sheet At source inspections

Project Summary Project Completion Unfinished Business Comments Thank You Letter Bank Guarantees Future Business or Related Projects - Training Aerison Procedures