Company Approvals EASA Part 21J (Design) - Approval no: EASA.21J.102 EASA Part 21G (Production) - Approval no: UK.21G.2562 EASA Part 145 (Repair) -

Slides:



Advertisements
Similar presentations
ATR Combi & Freighter  Exit.
Advertisements

Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
COMPANY MAINTENANCE MANUAL
FACILITIES & EQUIPMENT
RECORD KEEPING Cooperative Development of Operational
Tara Plastics Business Process Planning Workshop Tara Plastics Business Process Planning Workshop Presented by: The Georgia Tech Center for Manufacturing.
Company Confidential Registration Management Committee 1 AS9110 Alignment to Federal Aviation Regulations (FARs) and Original Equipment Manufacturers(OEMs)
Installation Requirements Paperwork Trail Difficulties
MAJOR REPAIRS AND ALTERATIONS
Aircraft Maintenance Management Module
The Mexican partner supporting your business with value added solutions since 2002 Volare Engineering S de RL de CV.
1 30/31 January 2013EASA/Estonian CAA Rulemaking Workshop Future simplifications for General Aviation Juan Anton Continuing Airworthiness Manager Rulemaking.
Copyright 2003 Joseph Greene All Rights Reserved 1 MFGT 124 Solid Design in Manufacturing The Design Process Professor Joe Greene CSU, CHICO Reference:
Future Defence Aviation Safety Regulation Module 1 Introduction to EMAR May 2015.
David Warne Independent Manufacturing Consultant.
Office of Aviation Safety Bob Swaim Airworthiness ABX Air Ground Fire.
Chapter 3, Product Design INTRODUCTION to Operations Management 5e, Schroeder Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
Downloaded from Special Thanks to: Yellowstone Valley Experimental Aircraft Association, EAA Chapter 57 Bob Kimpton - President.
From Design to Construction: How to Maintain Control of Your Lighting Design Avraham M. Mor, LEED AP, IESNA, A. IALD Partner, Lightswitch Architectural.
CAANZ Design Delegates Seminar EASA Design Organisation Features presented by Richard Leaper Chief Design Engineer Altitude Aerospace Interiors Ltd 29.
13. Airworthiness of Aircraft-1 Certificate of Type Approval Certificate of Type Approval A Certificate of Type Approval approves the basic design and.
The Maintenance and Engineering Organization
08 June 2006Portland; Oregon; USAPeter Corbeeel Reducing the risk of smoke and fire in transport airplanes: related EASA rulemaking actions Peter Corbeel.
An introduction to DNS Arrow Partnering for value and growth.
1 Avionics Workshop Ottawa, Ontario Nov.2003 Installation Approval of Non-required Avionics Equipment ISSUE TCCA Regional aircraft certification engineers.
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
JAA Cabin Safety Steering Group (CSSG) JAA Future Cabin Safety Plan / Coordination with EASA 4th Aircraft Fire and Cabin Safety Research Conference – Marnix.
HWG-10 Presentation to the FAA Aging Aircraft Workshop Presentation By: Jon Haag Chairman of HWG-10.
Commercial Parts Considerations CAANZ Delegate Conference, Oct 2009 Neil Burton Senior Design Engineer Altitude Aerospace Interiors.
Welcome to Address : Sr. No. 227/1, Sahakar Nagar, Dighi Road, Bhosari, Pune Phone Number:
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
Welcome.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Presented to: By: Date: Federal Aviation Administration Airworthiness Preventive Maintenance R1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 20 th Bomb Squadron “Buccaneers” Emergency Equipment Lt LeAnn Polensky.
Derby Schools Competition 2015 The STEM Engine “Moving Derby Forward”
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Presented to: By: Date: Federal Aviation Administration Downloaded from How to Survive A Ramp Check Aircraft Operator Maintenance Responsibilities.
Chapter 4 Aviation Industry Certification Requirements
AVIATION experts INDUSTRY Some of our clients. Regardless of whether your company is an airplane manufacturer, supplier or an airline looking to enter.
ETM 5131 – Capstone II Re-Development of New Component Implementation Process – Results By Scott Moeller.
1 An Introduction to Lake Central Air Service Our Past, The Present and What We Can Do For You LCAS.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Night Vision Imaging System (NVIS) Maintenance
Halon Contamination SIB R1 Deletain Rémi Powerplant Installation & Fuel Systems Certification Directorate Novembre 2011.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Special Conditions for Passenger Airplanes,
THE ONLY SOURCE OF KNOWLEDGE IS EXPERIENCE Albert Einstein
1 TCS – Internal Use ILP Training Material New Product Development (NPD) Process.
PLM WG News CATIA Forum 2013 March 28th Stephane Bally on behalf of the PLM WG 1.
The main function of a business is to produce goods and services which are desired by their customers.
Problem Solving Process Questions Research Development Plan Test Data Collection Refine Solution Deployment Plan.
Changes to Grandfathered Equipment Recent Developments from discussions with EASA and the FAA Mark Barker 2 nd March 2016.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
OICA „Certification of automated Vehicles“
Hailo US Tower Equipment Manufacturer
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
SOM 464 Manufacturing Resource Planning
Expedited Airworthiness Services, LLC
Chapter 4 Aviation Industry Certification Requirements
Installation of Non-Required Equipment
FUEL TANK SAFETY LEVEL 1.
Introduction DEFINATION :-
GA Safety Performance Final FY17 GA Summit 2017.
Takai robotics & Automation
International Aerospace Ltd
Presentation transcript:

Company Approvals EASA Part 21J (Design) - Approval no: EASA.21J.102 EASA Part 21G (Production) - Approval no: UK.21G.2562 EASA Part 145 (Repair) - Approval no: UK AS/EN9100C - Certificate no: 1751/AS

Certification // Regulation ACI’s team has a combined experience of over 100 years in aircraft interiors, using this proven experience in all aspects of the regulation relating to cabin interiors and passenger seats. Our Certification team and Office of Airworthiness provide all the required justification to introduce, repair & maintain approved products on your aircraft. Minor Change / Repair LOPA Specific Installation drawings Part 145 Repair Schemes Introduction of Part 21 EPA items Manual Revisions Engineering Orders / Service Bulletins

Certification EASA Approved 21J Design Data F.A.I.R to AS9102 EASA FORM 1 Release Minor Modifications & Repairs

Consultancy Product Problem Solving Certification Strategy and Route Mapping EASA approval of manufacturing facilities Business & Quality System Oversight Design Subcontract Capacity Conceptual Design Material Advice Testing Guidance (Flammability & Physical) SB’s / EO’s / Changes to Type Design

Product Design Aircraft SurveyingReverse Engineering Engineering DesignRapid Prototyping

Testing // Analysis Finite Element AnalysisMaterial Testing Fire Testing Colour Matching

Product Examples Seat Rail Capping Kick & Bump Strips Carpet Joiners Cable Raceways Galley Products Seat Parts, Fairings & Trim Items Escutcheons & Arm Caps LOPA Specific Kits End Caps Escape Path Lighting Panic Ropes & Class Dividers Seat Back Tables Overhead PSM’s Bespoke Cabin Interior Parts

Design, Manufacture & Supply Aircraft Specific Kits ACI convert LOPA to 3D Customer provide LOPA 1. ACI engineer components ACI Stock & Deliver 6. ACI Approved Design Data ACI survey aircraft