SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.

Slides:



Advertisements
Similar presentations
Trns•port SiteManager Materials Management and LIMS Presentation
Advertisements

Internet Contracting Estimating and Accounting System ICEAS Multi-Client Software Presented By: I C E A S.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 POS Single Store Implementation October 2009.
OneOffice is the basis of recording and documenting all pay quantities. Pay quantities may be entered directly into OneOffice or transferred from other.
IMPLEMENTATION KICK-OFF.  Perry’s Introduction  Project Director  Stacy Garton  Executive Team  Sandy  Jason  Bill  David.
OTIA III State Bridge Delivery Program CEI Tool Ron Reisdorf, PE Senior Construction Engineer Oregon Department of Transportation April 9, 2008.
Road and Bridge Contractor use of FieldManager in Michigan 2004 AASHTO TUG Mobile, Alabama Cliff Farr - Michigan DOT October 15, 2004.
For MIP Fund Accounting Software
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
The most comprehensive Oracle applications & technology content under one roof Procure to Pay Automation Bevan Wright Fusion5 NZ Oracle User Group.
Civil Rights & Labor SiteManager Tina Collins - CRL Janet Treadway - SM.
Insert software product logo (or name) on slide master 2005 Trnsport User Group Meeting November 6, 2005 Roger Bierbaum CRLMS Civil Rights and Labor Management.
Track, View, Manage and Report on all aspects of the Recruitment Process… with ease!
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
6/2/20151 MARS MARS Management Administrative Reporting System Commonwealth of Kentucky.
Overview of the Federal Aid Process for Transportation Projects.
Approval System (Workflow) Tender Information System Bid Selection Tool Pre-Qualification Portal Vendor Mgmt System Tendering Software Risk Mgmt System.
Claim Tracking System. Why was the Claim Tracking System Built? Mandated by the 2002 Legislature Automated Monthly Summary Reports Track and Ensure Construction.
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
Release & Deployment ITIL Version 3
AASHTO Subcommittee on Construction
SiteManager Implementation Oklahoma Department of Transportation Charles Thurmon.
Automated Contract Administration Project PIP Level II Presentation by Lisa A. Bowden August 24, 1999.
ACRIS e-Recording for Portal Companies Next Steps September 11, /11/2013.
 OSA MeetingMay 17,  Project Vision  Scope, Governance, Benefits  Timetables & Next Steps  Realizing the Vision - Procurement  Questions 2.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Canada’s NDS Experience Office of Controlled Substances An Overview May 8, 2007.
#watitis2014 watitisconf.uwaterloo.ca Tracey Sinclair and Joanne Voisin December 3, 2014.
Workflow and SharePoint Presented by Ben Geers. Overview What is workflow? Windows Workflow Foundation How does workflow apply to SharePoint? WSS v3 vs.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
From Research Prototype to Production
MURK Presented By Awni Alsous, MURK Engineer 2010.
Nuts and Bolts of Government Accounting
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Allen Hughes State Materials Office
IT Governance Purpose: Information technology is a catalyst for productivity, creativity and community that enhances learning opportunities in an environment.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Idaho National Engineering and Environmental Laboratory Lessons From the PAST Will Save TOMORROW Desiree Reagan November 7, 2003.
ALMobile – single comprehensive platform 1© 2015 Austin Lane Technologies, Inc. ALMobile Time Tracking Equipment Extras Quantity Work Orders Production.
Field Service Management
The Best of 2013 Top Features in V12.3 Presenter – Karoline Lapko Account Manager 1.
STATE OPERATED HEALTH CARE FACILITIES Guidelines for Service Contracts.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
MRAM November 8, 2012 Financial Systems Update Jeanne Marie Isola, UW-IT Information Management.
Proposal Pricing Training February 2004 Lance I. Stadler Pricing Manager, Corporate Headquarters Stanley Headquarters 300 North Washington Street, Suite.
USDA webTA Configuration Process United States Department of Agriculture Office of the Chief Financial Officer National Finance Center.
Project Review Team Meeting Customer User Acceptance Test Update August 10, 2011 Santa Plummer, User Acceptance Test Section Head Government Employees.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Oracle Services Procurement
1. EDS Project Accounting Long project lists? Completed projects can be removed from list Have your RE contact the Construction Office 2.
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
AASHTO Trns port TM SiteManager TM and Estimating 1998 TEA October 27, 1998 Portland, Maine.
+ WHY KNOWIFY MAKES SENSE FOR GAF FACTORY-CERTIFIED CONTRACTORS
SiteManager and Maintenance Management
CAMMS: Construction and Materials Management System
SiteManager/FieldManager Interface
Software and Systems Integration
Wide Area Workflow (WAWF) Overview
NM Department of Public Safety
Regulation and Licensing Department RLD Permitting and Inspection Software Modernization Change (Planning) Request Agency CIO/IT Lead - Michelle Langehennig,
General Services Department (GSD) Asset Management (AM) Project Project Certification Committee Implementation Phase Request October 24, 2019 Duffy.
Presentation transcript:

SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department

The Department identified that the Division of Highways needed an integrated automated system that would allow for comprehensive and electronic construction, materials, and laboratory information management. The system needed to provide for data entry, tracking, and reporting, and analysis of contract data from contract award through closes-out.

The system needed to be capable of being used by all levels of construction and materials personnel, and allow for the electronic transfer of both field and office data. It was required that the system be available as “commercial off the shelf”, optimize the replacement of existing legacy systems (e.g. WinCAPs, Claims Tracking, ASCOT), and not need software customization to use. Site Manager met these requirements.

Phase 1 (Construction) Project Kick-Off was in September The project team was empowered to make decisions on how to use the product on behalf of the Department including what changes were needed to existing practices. The team was charged with ensuring that the construction component was ready for use in time for the 2013 “construction season”.

Construction Management Features Direct interface and contract data loading from the Department’s preconstruction system (PES/LAS). Recording of various project data such as subcontract approvals; change order creation, tracking and approvals; and disputes and claim tracking; key dates; and scheduled events.

Construction Management Features cont. Reporting to capture field data such as personnel, equipment, pay item quantities, and force account. Replacing the Construction Diary with the Daily Work Report (DWR). Generation of progress estimates and final payment.

SITE MANAGER USER GUIDE (The SMUG) “How to use the product as you do you work” SMUG documents supplement the Contract Administration Manual

Discussion