Subcontract Prices And Estimating. Got Me to Thinking “Thinking is the hardest work there is. That is why so few people engage in it.” “Thinking is the.

Slides:



Advertisements
Similar presentations
DBE: Disadvantaged Business Enterprise Program DBEs are generally small firms owned and controlled minority or women.
Advertisements

Office of Civil Rights Business Development Program Overview Metro State Aid Training 3/2/11.
Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Cost of Capital Chapter 13.
Office of Purchasing and Contracts Procurement Outreach Training Level II – Module A Orders between $10,000 and $50,000.
Construction Engineering 221 Cost Estimating and Bidding II.
2014 Changes in DBE Certification Standards and DBE Final Rule Overview State of Hawai’i Department of Transportation Office of Civil Rights Disadvantaged.
Advanced DBE Tutorial June 10, DBE Program FAQ Why does BRMA have a DBE program? Federal law requires that airports that receive federal funding,
Office of Purchasing and Contracts Procurement Outreach Training Level II – Module A Orders between $10,000 and $50,000.
Subcontracting Construction Engineering 380. Subcontracts Owner doesn’t “recognize” subcontractors They are representatives of the contractor Prime usually.
Subrecipient Monitoring OFFICE OF RESEARCH ADMINISTRATION 2010.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
WHERE IS THE MONEY ? U. S. DOT Short Term Lending Program PURPOSE: Provides Lines of Credit to finance the Accounts Receivable from transportation related.
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Vendor Registration. Vendor Login EEOCC Staff /Enter Request.
Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.
Chapter 2 Policy Standards for a Good Tax McGraw-Hill/Irwin
McGraw-Hill Ryerson Copyright © 2011 McGraw-Hill Ryerson Limited. Adapted by Peter Au, George Brown College.
Best Practices in Subcontracting: Lessons Learned from $1 Billion of Contract Performance as both a Prime Contractor and Subcontractor Presented by: Carlos.
111 Con E 221 Review graded exams on Monday Review presentation guideline for term papers Finalize presentation schedule on Monday.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CONTRACTOR MANPOWER REPORTING
2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Subcontract Requests. P rocess After the notice to begin work is issued, Construction Procurement uploads the contract into SiteManager. At that point.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc. Ozette Brown, BidX Product.
State Auditor’s Office Change Order Pricing Practices Performance Audit of Eight Local Governments Puyallup City Council February 7, 2012 Chris Cortines,
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
After the Storm Home Repairs and Replacement. What Happens After a Storm Victims of a storm suffer some type of loss and different levels.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
U. S. Small Business Administration Fernando J. Guerra Contracting Officer & Acting Supervisor Business Development.
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
.. Tax Collection Unit 5 Macroeconomics “An ARTFUL taxman so plucks the goose as to obtain the most feathers for the least hissing.” Jean-Baptiste Colbert,
Chapter 11 Subcontractor Work. Introduction Subcontractors perform 80% or more of the on-site work in residential construction. Often, the homebuilder.
Presented by: Jim Ferguson Systems Administrator Construction Division.
Discussion of “Inflation Experiences and Contract Choice – Evidence from Residential Mortgages” by Matthew J. Botsch and Ulrike Malmendier NBER SI 2015.
Copyright © 2011 McGraw-Hill Ryerson Limited 8-1 PowerPoint Author: Robert G. Ducharme, MAcc, CA University of Waterloo, School of Accounting and Finance.
Contract Training Class I
DES provides a variety of support services to state government and Washington residents. Did You Know? Expertise in information technology and printing.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Doing Business With the Public Sector Tina Giles-Potter Administrator, Small Business Program Orange County Transportation Authority.
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.
You passed the Bond or secured some funds What do we do now? 2014.
CommonHealth for SWaMmers Ear Eugene Anderson Director of Policy, Consulting & Review (804)
Office of Purchasing and Contracts Procurement Outreach Training Level II – Module A Orders between $10,000 and $50,000.
Technical Information Services Procurement Presentation to Industry October 30, 2003.
Chapter 2 Tax Policy Issues: Standards for a Good Tax.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
RTD’S SUBCONTRACTOR PERFORMANCE SELF-INSURED PROGRAM Presenter: Marla Lien, General Counsel Regional Transportation District Denver, Colorado.
PROCUREMENT Conservation District WDA “is not a procurement authority” We are not telling you how to purchase or procure materials or services,
ATA Purchasing Jeff Foster. Aerospace Testing Alliance  Joint venture between Jacobs Engineering, Computer Sciences Corporation, and General Physics.
Bidding Strategies. Outline of Presentation Markup Expected Profit Cost of Construction Maximizing Expected Profit Case 1: Single Known Competitor Case.
Do’s & Don’ts Procurement Services June 5, 2017.
Bidding Strategies.
Construction Oversight
FDOT Support Services Programs
FDOT Support Services Programs
Principles of Taxation
[ March 9, 2017] [ Bill Bowles, Audit Supervisor]
CIVL 493 CONSTRUCTION MANAGEMENT
Chapter 2 Tax Policy Issues: Standards for a Good Tax
The Relationship between Corporate Income Tax Reporting and Financial Reporting: A Pan-European Perspective in the Context of Adoption of IFRS Frédéric.
Increasing DBE Opportunities in Professional Services
Tax Policy Issues: Standards for a Good Tax
Presentation transcript:

Subcontract Prices And Estimating

Got Me to Thinking “Thinking is the hardest work there is. That is why so few people engage in it.” “Thinking is the hardest work there is. That is why so few people engage in it.” Henry Ford Henry Ford

Alabama Background Roughly $600 million in contracts let. Roughly $600 million in contracts let. Averaging 1800 subcontracts per year. Averaging 1800 subcontracts per year. Oddly constant over past few years. Oddly constant over past few years. Office Engineer approves subcontracts Office Engineer approves subcontracts 70/30 split 70/30 split GL, AL, Worker Comp GL, AL, Worker Comp Paper Paper Paper Paper Paper Paper

David’s First Definition Subcontract Price Subcontract Price Price for which the work could be done by the prime (including profit) if the prime had the inclination and ability to perform the item of work minus the costs of overhead associated with being the prime. Price for which the work could be done by the prime (including profit) if the prime had the inclination and ability to perform the item of work minus the costs of overhead associated with being the prime. The subs are not doing it at cost. The subs are not doing it at cost.

Main Questions Why is there a difference between the contract amount and the subcontract price? Why is there a difference between the contract amount and the subcontract price? Is that amount consistent across a project? Is that amount consistent across a project? If not, is it consistent across a group of items? If not, is it consistent across a group of items? How can the DOT use this information? How can the DOT use this information? How can we capture the information? How can we capture the information?

Assumptions The prime chooses the lowest quote for an item or items of work from the most competent vendor. The prime chooses the lowest quote for an item or items of work from the most competent vendor. Different from the DOT. Different from the DOT. The item of work is the only item being worked on by the subcontractor. The item of work is the only item being worked on by the subcontractor.

My Theories Prime bears risk. Prime bears risk. ALDOT only has a contract with the prime. ALDOT only has a contract with the prime. Consequences to the prime for non-performance. Consequences to the prime for non-performance. Support personnel by Prime. Support personnel by Prime. Project manager, project supervisor, bonding Project manager, project supervisor, bonding Prompt payment. Prompt payment. In Alabama, it is seven days. In Alabama, it is seven days. Finding a replacement for non-performance of subs. Finding a replacement for non-performance of subs.

Goals To come up with a method of determining the “true” price of an item of work. To come up with a method of determining the “true” price of an item of work. Qualification: ALDOT does not have the manpower to do cost based estimating. Qualification: ALDOT does not have the manpower to do cost based estimating. Treat subcontract prices the way we treat contract prices. Treat subcontract prices the way we treat contract prices. Determine on which items contractors prefer placing overhead. Determine on which items contractors prefer placing overhead. Determine if the sub being a DBE changes subcontract prices and overhead. Determine if the sub being a DBE changes subcontract prices and overhead. Determine what subcontract prices versus contract prices tell us about an individual contractor. Determine what subcontract prices versus contract prices tell us about an individual contractor.

What I Am Doing Sample: Fiscal Year 2001 Subcontracts Sample: Fiscal Year 2001 Subcontracts Exclusions: Exclusions: Partial item subcontracts. Partial item subcontracts. Metric contracts. Metric contracts.

What I Found Before I Did Any Analysis Unreliable data. Unreliable data. Subcontracts become public information. Subcontracts become public information. Subcontracts showing no overhead. Subcontracts showing no overhead. Potential efforts to circumvent the 70/30 split. Potential efforts to circumvent the 70/30 split.

630C070 Examples Qty. P. Price S. Price Diff.OvrhedDBE %Y %Y %Y % % %Y % % %Y

Construction Signs Very common item subbed out. Very common item subbed out. Range 566.7% to %. Range 566.7% to %. Average = 40.39% Average = 40.39% Average minus $50 bid on $7.50 sub = 14.91% Average minus $50 bid on $7.50 sub = 14.91% Percent of total contract dollars let amount approximately 0.8%. Percent of total contract dollars let amount approximately 0.8%.

Other Examples Bridge items. Bridge items. One set of items contract prices 50% or more under subcontract prices. One set of items contract prices 50% or more under subcontract prices. One contractor has the -0.5% syndrome. One contractor has the -0.5% syndrome. One contractor has the 3.09% syndrome. One contractor has the 3.09% syndrome. Hauling Hauling Partial, but interesting. Partial, but interesting.

Estimated (Get it) Results Tough to tell. Tough to tell items items. Hard enough to get a history on prime prices. Hard enough to get a history on prime prices. My vision. My vision. Smaller dollar items tend to be subbed out more often. Smaller dollar items tend to be subbed out more often. DBE overhead DBE overhead Approximately 4.5%-5% above non-DBE. Approximately 4.5%-5% above non-DBE. Overheads fairly consistent across a project. Overheads fairly consistent across a project. Data appears to be better for contractor specific analysis. Data appears to be better for contractor specific analysis.

Taxes “The art of taxation consists in so plucking the goose as to obtain the largest possible amount of feathers with the least possible amount of hissing.” “The art of taxation consists in so plucking the goose as to obtain the largest possible amount of feathers with the least possible amount of hissing.” Jean Baptiste Colbert, Finance Minister to Louis XIV Jean Baptiste Colbert, Finance Minister to Louis XIV