Project Mthombo Update 3 June 2013. Background The project entails the construction of a new crude oil refinery for PetroSA to be based in Coega, Port.

Slides:



Advertisements
Similar presentations
Source Separated Organic Materials Anaerobic Digestion Feasibility Study Prepared for Ramsey/Washington Counties Resource Recovery Project Board And the.
Advertisements

Status of bitumen supplies
CRUISE LINE TOURISM STEERING COMMITTEE MEETING OUTCOMES OF THE WORKSHOP & PROGRESS 24 TH MARCH 2009.
ENVALOR LIMITADE Project: Ethanol / Electricity Co-generation Plant Mozambique, Manica Province November 5, 2009.
January 2007 Presentation on Biofutures International plc.
Association of Oil Pipe Lines Federal Energy Regulatory Commission Washington, D.C. April, 2004.
Kishor Tailor Chief Executive Humber LEP. Humber LEP Area.
The Petroleum Oil and Gas Corporation of South Africa (SOC) Ltd Reg. No. 1970/008130/07 1 PetroSA Overview * Following the merger of Soekor E & P and Mossgas.
Viability of Small Refineries: Kenyan Perspective Presentation to: UNCTAD 11 th Africa Oil & Gas, Trade and Finance Conference Nairobi Kenya By John Mruttu.
Building Technical and Vocational Skills Towards diversified & Sustainable Growth in Mozambique Prepared for the S EMINAR ON G ROWTH, T RANSFORMATION,
Ontario Petroleum Institute Ontario Petroleum Institute Brief 2015 Ontario Pre-Budget Consultation January 28, 2015.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
Renewable Fuels in Minnesota Commissioner Gene Hugoson.
SEDS Review Liquid Fuels Sector May 7, 2009 Don Hanson Deena Patel Argonne National Laboratory.
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
Public Presentation Presented by Smart International Consulting. May 2013.
The Economics of Energy Efficiency – Why It Makes Sense For Canada Carol Buckley Director General Office of Energy Efficiency April 12, 2013 Presentation.
Community Based Clean Energy. The Opportunity To set a precedent for effective private sector partnerships, To maximise the local economic development.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
PNWA Summer Conference Port of Grays Harbor: Proposed Crude By Rail Projects June 23, 2014 Kayla Dunlap Public Affairs Specialist.
Future of the Bioeconomy and Biofuels: Overview, Industry, and Agriculture? Dan Otto Chad Hart John A. Miranowski Iowa State University.
Title: Coal Cowboy Duration: 00:12:51 Link: engr
Study conducted for the Coalition of Alabama Waterway Associations by Troy University Center for International Business and Economic Development.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
2010 FIFA World Cup SAPIA readiness submission 19 May 2010.
1 Ethanol Transportation & Distribution Governors Ethanol Coalition Mike Mears Senior Vice President
1 km APEC EWG 40 BRUNEI DARUSSALAM Short-Term Energy Security Initiative Measures APEC EWG 40 BRUNEI DARUSSALAM Short-Term Energy Security Initiative Measures.
DEDEA STRATEGIC FRAMEWORK STAKEHOLDER BRIEFING 12 OCTOBER 2010.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
March 15, Meeting the Future Together The Garfield County Cumulative Impacts Study Introduction & Overview Energy Advisory Board March 15, 2005.
Water Crisis and Drilling in the Middle East. What is happening to the amount of renewable water available in the MENA?
Ma’aden’s Role in Regional Development
DBSA Charter, Strategy & Key Initiatives Presentation to Select Committee on Finance, 21 June 2006, Cape Town DBSA TEAM Admassu Tadesse: Head, Corporate.
CRUISE LINER STUDY – PHASE II ECONOMIC BENEFITS NATIONALLY AND REGIONALLY FIRST STEERING COMMITTEE MEETING OF CRUISE LINER TOURISM 24 MARCH, 2009.
Topic: Impact of Commercial Agricultural Production on Poverty Reduction: A case study of Vientiane Province Sengpheth SENGMEUANG Laos Agricultural policy.
Skills Development in the Petroleum Industry
World Cup Readiness Presentation to the Joint Committee 19 May 2010.
CHALLENGES ~3 Million residents 33% of Households below poverty line Families in need of adequate shelter Rising unemployment rate Increasing.
The Petroleum Oil and Gas Corporation of South Africa (Pty) Ltd Reg. No. 1970/008130/07 Annual Performance Review Mr Sipho Mkhize President & CEO Presentation.
AAPA 2011 Pre-CAPSA’11 Study Tour – Bitumen Imports Bitumen Imports - an Australian perspective.
COEGA DEVELOPMENT CORPORATION PRESENTATION TO SELECT COMMITEE ON TRADE AND INTERNATIONAL RELATIONS 23/05/2012.
Women in Oil & Energy SA Challenges and Experiences in the Liquid Fuels Sector Bongani Mthombeni-Möller 01 November 2012.
CBE SYMPOSIUM 2008 Roles of Professionals in the Booming Built Environment Presented By Ms N Mandindi Chief Executive Officer Intersite Property Management.
1 Transformation in the Petroleum Industry – The Journey Presentation to the Parliamentary Portfolio Committee for Minerals and Energy 10 MAY 2007 Prepared.
1 NERSA CEO: Smunda Mokoena 14 September 2010 Presentation to the Portfolio Committee on Energy and the Select Committee on Economic Development PUBLIC.
Bio-Fuels: Opportunities and Challenges 9 th Annual Farmer Cooperative Conference T. Randall Fortenbery Renk Agribusiness Institute Dept. of Ag and Applied.
Skills Development and Korea’s Experiences October, 2006 Korea University of Technology and Education.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
CEF Group MB Damane, Group CEO 10 November CEF GROUP STRUCTURE ETA ENERGY STATE.
Page | 1 Oiltanking Grindrod Calulo (OTGC) 12 November | 2013 To: SAPIA Security of Supply Seminar By: William Kieser – Calulo Investments (Pty) Ltd.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
The Economic Benefits of Refurbishing and Operating Ontario’s Nuclear Reactors February 25 th 2011.
Welcome Remarks 12 November Fast facts The South African petroleum industry accounts for: % contribution to the national GDP; - R267 billion.
THE YOUTH IN ENERGY INDABA “your future in the energy mix” October 2016 Port Elizabeth, Eastern Cape Province The Vulindlela Conference Centre
Port of Cape Town Development Plans
Transnet’s Railway Infrastructure Development
PORTFOLIO COMMITTEE ON ENVIRONMENTAL AFFAIRS OCEAN ECONOMY:
Presentation to Portfolio Committee on Transport
NEW KNOWLEDGE, TECHNOLOGY AND INNOVATION
SPECIAL ECONOMIC ZONES IMPLEMENTATION
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Korea University of Technology and Education
Port of Cape Town Development Plans
DEPT OF PUBLIC ENTERPRISES
Presentation transcript:

Project Mthombo Update 3 June 2013

Background The project entails the construction of a new crude oil refinery for PetroSA to be based in Coega, Port Elizabeth. The plant has been specified to process 300,000 barrels per day of crude oil. The refinery will produce diesel, petrol and jet-fuel. It is anticipated that PetroSA will spend R76,4 billion during the construction phase of the project. Strategically located in the Coega IDZ, heart of tradeflows and a growing demand for petroleum products

Background Contribute to security of supply of liquid fuels supply in the SADC region The preliminary schedule is as follows: – Pre-Feasibility: completed March 2008 – Feasibility (incl. basic engineering): Completion Dec 2015 – Front end engineering: Duration 14 months – Construction: Duration 3-4 years – Start of operations 2022.

Refinery processing objectives - Meet South African future liquid fuel demand - Process heavy, high sulphur and high TAN feedstock. - Flexibility to process a range of crude oils. - Maximise diesel yield from the refinery. - Flexible operations between diesel and gasoline modes. - No production of fuel oil. - Meet Euro V product specifications. - Comply with future bio-fuels legislation. - Allow phased integration with petrochemicals.

– Crude oil to be imported in VLCCs and piped to refinery via SPM – Capacity: bpd – Infrastructure required: 1000 ha 20 Ml/d Industrial water 7 Ml/d Potable water 165 MW of Power – Location selection criteria: Proximity to shoreline Proximity to Port Ngqura approach channels and breakwater Shelter from sea and swell conditions Proximity to traffic separation schemes Project overview Crude Oil Import SPM Port of Ngqura Crude Oil Refinery – Crude oil to be imported in VLCCs and piped to refinery via SPM – Capacity: bpd – Infrastructure required: 1000 ha 20 Ml/d Industrial water 7 Ml/d Potable water 165 MW of Power – Location selection criteria: Proximity to shoreline Proximity to Port Ngqura approach channels and breakwater

Logistics nay, must be Refinery Depot Refinery Tank Farm Coastal Tank Farm in Port Ngqura area Crude Oil SPM Quayside ship loading

Port requirements

Employment estimations Construction phase – Up to 23,000 at people peak of construction. – 5,000 to 10,000 highly skilled artisans. Operation phase – Approx. 1,000 permanent refinery jobs. PetroSA training facility planned for Coega – Similar to Centre of Excellence (COE) in Mossel Bay. Jobs in the midst of an unemployment crisis – Opportunity to fund a massive public works project – two thirds to be financed through foreign equity.

Macro-economic impact assessment (2008) R76,4b to be spent during construction; R94,6b per annum operational costs (including feedstock); – projected revenue of R109,8 billion per annum; 83% of economic impact will accrue to the Eastern Cape; Household income in the Eastern Cape could rise R1.8b per annum; 5.5% p.a possible economic growth for the Eastern Cape province. If the Eastern Cape takes ownership of and drives the project, many of the spin-offs from the localisation initiative amounting in total to about R20 b could come to the province.

Project development status PetroSA signed a joint study agreement with Sinopec in May 2012 which shapes the business case for Project Mthombo This study was completed and the Mthombo Steering Committee recommended to proceed to the feasibility stage. The adjusted size of the refinery is 300 kbbl/d Feasibility studies (completion Dec 2015) which will prepare for FEED approval by the Board and the government The feasibility study will cover the core refinery. Infrastructure must still be scoped and the CDC can play a important role in this. PetroSA is currently in discussions with Transnet with regards to the development of support infrastructure required for the refinery. Ongoing engagement with regards to infrastructure requirements such as electricity, water, ports, social infrastructure.