Titulo de la Presentación The 5 th International Istanbul Insurance Conference LOSS PREVENTION AND RISK IMPROVEMENT HAKAN ILERI ISTANBUL, 3 rd October.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Checking & Corrective Action
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
[Organisation’s Title] Environmental Management System
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
Assignment Four Underwriting. Definitions Underwriting – The process of selecting policyholders by recognizing and evaluation hazards, establishing prices.
MODULE 8 MONITORING INDIANA HPRP Training 1. Role of Independent Financial Monitors 2 IHCDA is retaining an independent accounting firm to monitor its.
The ISO 9002 Quality Assurance Management System
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Overview Lesson 10,11 - Software Quality Assurance
INDUSTRIAL & SYSTEMS ENGINEERING
ISO General Awareness Training
Managing the Information Technology Resource Jerry N. Luftman
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
YOUR LOGO HERE Risk Management How to manage the risks inherent in programs and special events.
The Camp Audit “Keep your friends close and your auditor closer”
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Definition Hazard - Anything, any source or any situation with the potential to cause bodily injury or ill-health Risk – the likelihood that a hazard.
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
1 CHCOHS312A Follow safety procedures for direct care work.
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
Session 3.11 Risk Identification Presented By: RTI, JAIPUR.
Process Safety Management
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Produced 27/06/05 Seeing the Future First Tom Welland Fire Services Manager.
Software Quality Assurance Activities
Health and Safety Policy
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
Intensive Actuarial Training for Bulgaria January 2007 Lecture 11 – Reinsurance By Michael Sze, PhD, FSA, CFA.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Hazards Identification and Risk Assessment
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
IAEA International Atomic Energy Agency Safety Reports Series No. 7 Lessons Learned from Accidents in Industrial Radiography Practical Radiation Safety.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
MANAGING BUSINESS RISKS AN OVERVIEW CSU, Northridge January, 2004 Chris Brady University Risk Manager.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
SOLVENCY II and Reinsurance General Overview The 2nd International Istanbul Insurance Conference 30 th of September 2010.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
APPLYING RISK MANAGEMENT STRATEGIES PRUDENTLY Paper No 192 Presented At 2011 ICHS Conference September 13, 2001 By Michael Pero, P.E. – Director of Risk.
CDM 2015 What we’ve learnt so far 20 October 2015.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Insurance Company Operations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Kpmg 2002 Casualty Loss Reserve Seminar Surety Reserving Mike Rozema, ACAS, MAAA KPMG LLP.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
MODULE 2 READNESS. OBJECTIVES Prioritize personal values and describe their relationship to incident management and firefighter safety Company Officer’s.
Chapter 8 Risk Management Plans 8 Risk Management Plans C H A P T E R.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Business Continuity Planning 101
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
SEC 480 assist Expect Success/sec480assistdotcom FOR MORE CLASSES VISIT
1 Regulatory Reform (Fire Safety) Order 2005: An Insurer’s View Mark Newton Property Technical Manager Royal & Sunalliance Insurance.
Long-Term Planning Presented by: APP Site Visit Don Untch
Health and Safety Policy
WP 3 How to assess implementation of ALARA
4.5 Checking and Corrective Action Monitoring and Measurement
HSE Case: Risk Based Approach.
VIth AIDA EUROPE CONFERENCE (Vienna, 3-4 November 2016)
World Health Organization
Controlling Project Cost and Schedule
Presentation transcript:

Titulo de la Presentación The 5 th International Istanbul Insurance Conference LOSS PREVENTION AND RISK IMPROVEMENT HAKAN ILERI ISTANBUL, 3 rd October 2013

Titulo de la Presentación CONTENTS Improving the Risk Standards Loss Prevention Measures Current Situation Expectations of the Reinsurers Introduction Cases

Titulo de la Presentación INTRODUCTION Riskier World Local Players’ Roles Innovations by Reinsurers Risk Management Approach Importance of Risk Surveys

Titulo de la Presentación IDEAL (Before the loss) Proven methods Prudent acting Competent personnel Smooth cooperation Reasonable budgeting Reasonable schedules REAL (As it turns out to be….) Trial and error Negligence Ignorance Chaos Underfunding Time pressure INTRODUCTION IDEAL VS REAL

Titulo de la Presentación Insurer Insured Policy Claim - Extent - Causation - Coverage/Liability - Indemnification - Subrogation - Loss Mitigation - Repair -….. THE THEORY IS SIMPLE INTRODUCTION

Titulo de la Presentación Insurer Insured Policy Claim Co-Insurer(s) Principal OEMs Sub-Contractors Banks Loss Adjuster Broker Re-Insurer(s) Lawyers Experts UnderwritingClaims ProjectSiteDesign THE REALITY: USUALLY COMPLICATED INTRODUCTION

Titulo de la Presentación Understand my business Sufficient capacity Accurate & Consistent View of Risk Practical advice Reasonable premium Prevent losses Avoid surprises Fair claims payments Understand exposure Balanced portfolio Accurate & Consistent View of Risk Delivery solutions for client Sufficient premium Prevent losses Avoid surprises Fair claims payments INSURED INSURER EXPECTATIONS OF THE INSURED AND INSURER

Titulo de la Presentación EXPECTATIONS OF THE REINSURER Accurate & Consistent View of Risk Presentation of data in the requested format Sufficient premium Familiarity with the general principles of law governing reinsurance contract Prevent losses (risk improvement and loss control) Timely and Comprehensive Reporting Claims Control Fair claims payments

Titulo de la Presentación WHERE DO THEY MEET? Prevent Losses Avoid Surprises Accurate & Consistent View of Risk Fair Claims Payments Prevent Losses Prevent Losses

Titulo de la Presentación CURRENT SITUATION Differences in expectations Lack of understanding and communication Catastrophe Modelling BI Exposure Application of Loss Prevention Measures Risk Managers Claims Control – Post Loss Mitigation Measures

Titulo de la Presentación LOSS PREVENTION MEASURES Identification of Risks Risk Improvements Development of Loss Control Programme Business Continuity Plan Maintaining the programme SUMMARY

Titulo de la Presentación LOSS PREVENTION MEASURES Find out if the risk offered is acceptable; Help in determining an appropriate rate to be charged; Make recommendations for improvement of the risk; Make an estimate of the maximum amount, or percentage of the risk that is likely to be lost in one fire or any other loss. RISK SURVEYS

Titulo de la Presentación LOSS PREVENTION MEASURES EXAMPLES RISK SURVEYS

Titulo de la Presentación 14 We have proven equipment! LOSS PREVENTION MEASURES EXAMPLES

Titulo de la Presentación 15 We use qualified contractors only! EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 16 Ooops! EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 17 We have strict procedures and standards EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 18 Our staff are highly motivated EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 19 We have fire doors... Yes, but the walls are not.. EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 20 We are painters, we paint everything… EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 21 No comments… EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 22 Fire truck? EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 23 Fire door. But what is it? EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación 24 Risk prevention is not a game… EXAMPLES LOSS PREVENTION MEASURES

Titulo de la Presentación RISK SURVEYS OBJECTIVES The purpose of the risk inspection program is to provide Insurers & Re-Insurers with a comprehensive understanding of this risk, including:  Overview of the Plant  Compliance of activities and equipment with the insurance proposal  Condition of equipment  Plant life management philosophy and implementation  Adequacy of maintenance strategy  Review of management and technical documentation and reports  Impact of differences on risk profile  PML considerations  Comments on environmental risks and political/social risks  If BI: review of contracts, redundancies, business figures, spare part inventory

Titulo de la Presentación RISK SURVEYS Specific Review Topics  Process and equipment characteristics  Prototypical elements  Plant organization  Maintenance approach, history and schedule  Fire protection, detection and suppression systems, inspection program and records  Fire plant/emergency response procedures  Capital spares for major equipment  HSE and QA/QC manuals  Example internal/external risk/safety audit reports  Accident/incident reports + details of any losses or incidents to date during site works  Client organization & management training program

Titulo de la Presentación IMPROVING RISK STANDARDS Ability to Understand the Risk Contract Certainty / Willingness to Handle the Claims Product Innovation Risk Manager or Insurance Buyer? Appointment of Experts Pro-active approach in loss control programmes RECOMMENDATIONS

Titulo de la Presentación EXPLOSION AND FIRE – OIL REFINERY IN SPAIN CASES

Titulo de la Presentación EXPLOSION AND FIRE – OIL REFINERY IN SPAIN CASES

Titulo de la Presentación EXPLOSION AND FIRE – OIL REFINERY IN SPAIN CASES

Titulo de la Presentación FIRE & BUSINESS INTERRUPTION – VARNISH & COATINGS MANUFACTURING PLANT IN TURKEY CASES

Titulo de la Presentación EARTHQUAKE / INDUSTRIAL PLANT IN ITALY CASES

Titulo de la Presentación CASES FIRE – COMMERCIAL BUILDING IN SPAIN

Titulo de la Presentación FIRE – COMMERCIAL BUILDING IN SPAIN CASES

Titulo de la Presentación COLLAPSE OF H2SO4 TANK – FERTILIZER FACTORY CASES

Titulo de la Presentación CASES COLLAPSE OF H2SO4 TANK – FERTILIZER FACTORY

Titulo de la Presentación FIRE – PRINTING FACTORY IN IFRANCE CASES

Titulo de la Presentación FIRE – CONSTRUCTION PROJECT IN KAZAKHISTAN CASES

Titulo de la Presentación CASES FIRE – CONSTRUCTION PROJECT IN KAZAKHISTAN

Titulo de la Presentación FIRE – PVC FACTORY IN TURKEY CASES

Titulo de la Presentación CASES FIRE – PVC FACTORY IN TURKEY

Titulo de la Presentación CASES FIRE – PVC FACTORY IN TURKEY

Titulo de la Presentación CASES ACCIDENT DURING START-UO – HIGH SPEED TRAIN IN MEXICO

Titulo de la Presentación ACCIDENT DURING START-UO – HIGH SPEED TRAIN IN MEXICO CASES

THANK YOU / TESEKKURLER

Titulo de la Presentación HAKAN ILERI