Demystifying the WBS For Pharmaceutical Product Development By Bill Carswell, Ph.D., PMP Adjunct Professor Embry Riddle Aeronautical University & Wanda Whyte, PMP, CSEP Sr. Systems Engineer C&W Associates
Project Scope Management 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS 5.5 Validate Scope 5.6 Control Scope PMBOK 5th Edition
5.4 Create WBS Outputs Scope Baseline Project Document Updates
Scope Baseline Contains three elements Scope Statement WBS WBS Dictionary
The WBS “Provides a vision of what has to be delivered” The process of subdividing project deliverables and project work into smaller, more manageable components. Deliverable-oriented hierarchical decomposition
Key WBS Definitions PMBOK 5th Ed. p. 125/6 “Work” refers to products or deliverables that are the result of activities, not the activities themselves. The Scope Baseline (which includes the WBS) is an input to schedule development (not the other way around).
What Makes a “Quality” WBS? “Project activities are not listed, as these are components of the project schedule, not the WBS.” “All (WBS) elements are nouns. Verbs are not use to identify WBS elements.” (Schedule activities are written with the verb/object sentence structure – from the PMI Scheduling practice standard) From PMI WBS Practice Standard, 2nd Ed., Section 5.5.1
WBS “Graphical” Structure
Airplane WBS
WBS “Tabular” Structure
Airplane WBS
Airplane WBS
Services WBS
Product Development WBS
Other WBS Examples PMI WBS Practice Standard 2nd Ed. Oil, Gas & Petrochemical (Appendix E) Environmental Management (Appendix F) Process Improvement (Appendix G) Process Plant Construction (Appendix I) Service Ind. Outsourcing (Appendix J)
Other WBS Examples PMI WBS Practice Standard 2nd Ed. Web Design (Appendix K) Telecom (Appendix L) Refinery Turnaround (Appendix M) Gov’t. Design/Bid/Build (Appendix N) Software Implementation (Appendix O)
How Much Detail in the WBS? From PMBOK5 5.4.2.2 Deciding on a Work Package level Some deliverables need to be decomposed only to the next level Others need additional decomposition As work is decomposed to greater levels, the ability to plan, manage and control the work is enhanced Use your judgment
How Much Detail in the WBS? From PMBOK5 Section 5.4.2.2 Excessive Decomposition leads to Non-productive management effort Inefficient use of resources Decreased efficiency
How Much Detail in the WBS? From PMBOK5 Section 5.4.2.2 Premature Decomposition There may be insufficient information about elements that will not be worked until far in the future Wait until the WBS element is sufficiently understood to plan and decompose it Use Rolling Wave Planning
The WBS is NOT a Schedule This is not a WBS. This is a numbered schedule: Project Activities do not belong in the WBS. The WBS consists of nouns, not verbs. The WBS (as part of the Scope Baseline) is an input to the schedule development processes, not an output.
Tabular WBS with Brief Dictionary
“The Golden Thread of PM” The Detailed WBS Dictionary Summary Page
The Golden Thread Detailed Worksheet
Uses of The Golden Thread Detailed activities feed schedule Cost numbers feed budget Labor hours & categories feed human resource Plan Material and subcontracts feed procurement plan. Scope description feeds quality plan Risk items feed risk register
WBS Development for New Pharmaceutical Product (Live interactive development with audience)