Don Wells Hess Corporation

Slides:



Advertisements
Similar presentations
Project Management and Software Quality See accompanying Word file “Software PM tools 3”
Advertisements

Status report for revision of API 17F (ISO )
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Product Lifecycle Management
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
API Subcommittee 17 Industry Standards for Subsea Equipment
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
© Chevron 2013 D EEP S TAR ® A Global Deepwater R&D Consortium Task Report Update: DeepStar Study AUV Interface Standards for Deepwater Fields Reporting.
API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 1 Design Methodology has been in review and development for 5+ years and.
INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition Petroleum and natural gas industries — Well integrity for the operational phase.
API RBI Vision Updated 2006 API RBI is a Management Tool that is: The premier RBI methodology accepted worldwide by jurisdictions Involved in every mechanical.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 CUSP for VAP Adaptive CUSP Sustainability Sustainment and Spread David.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Don Wells Hess Corporation
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
Chemical Biological Defense Acquisition Imitative Forum (CBDAIF) Briefing to NBC Industry Group 19 June 2014.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.
AIAA Corporate Membership Advisory Committees Propulsion & Energy (P&E) Conference CMAC 7 June 2013 CMC Meeting.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
SC18:TG8 API Specification Q1 Guidance Document.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
The CNCAN Knowledge Portal TM on the Use of GSAN and SAET Programme November 2015 ROMANIA National Commission for Nuclear Activities Control.
Business Plan What next?. Business Plan At 2006 annual meeting, business plan working groups were formed to write each section of the document.
HERA Second European Stakeholder Workshop July Human & Environmental Risk Assessment An A.I.S.E and CEFIC initiative on targeted risk assessment.
19th January 2012 Don Wells (Hess)
Current Industry Assessment
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Introduction : WEF Capital Project Complexity AA Packages Bulk materials BB SPAR Power- generation module Turbine generator package CC Valves, line pipe.
CHANGE MANAGEMENT - PART 2 MODULE 7
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
API 17Q – Subsea Equipment Qualification
Task Group Status January 2014
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Task Group Status January 13, 2016
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
Status Update on API 16Q / 16R / 16F
API Standard 6X: API/ASME Design Calculations
International Subsea Standardization
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
First 8 slides are what was presented in San Fransisco…
Impact on SC 6 Documents by Kenneth Young
API 17H TASK GROUP January 15, 2013.
Instrument PDR Summary of Objectives
Don Wells Hess Corporation
API 17H TASK GROUP January , 2014.
Sample Engineering Design Models
API Standard 53 Update June 2017
API 17O HIPPS Task Group Status June /20/2019 API 17O HIPPS.
Discussion Points API RP 17A Task Group Members
API 17H TASK GROUP January, 2015.
CSOEM Materials Advisory Resource Group
Task Group Status January 2013
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

Don Wells Hess Corporation API RP 17N Subsea Production System Reliability and Technical Risk Management & Integrity Management Don Wells Hess Corporation

Since Last Meeting We’ve Organized Ourselves We’ve Defined What and Who We have a Path Forward We are Prepared to Communicate

Additional Goals Align with new BOEMRE NTL probably to be issued in Q1 2011 Integration of API 17N with standard ISO 20815 (Jans Neurenkerken) Provide guidance on API 17N RIMS training programmes

Membership Graeme Davies – DNV Co- Chairman John Fassero – ExxonMobil Karl Woods – Woodside Ken Powell – Cameron Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Tom Van Aschwege – Stress Engineering Karina Vitale – Chevron Rune Mode - Statoil Shadi – ODI Co- Chairman Don Wells – Hess John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group Integrity Management Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE John Macneill – Stress Engineering

Membership Graeme Davies – DNV Co- Chairman John Fassero – ExxonMobil Karl Woods – Woodside Ken Powell – Cameron Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Tom Van Aschwege – Stress Engineering Karina Vitale – Chevron Rune Mode - Statoil Shadi – ODI Co- Chairman Don Wells – Hess John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group Integrity Management Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE John Macneill – Stress Engineering

Membership Graeme Davies – DNV Co- Chairman John Fassero – ExxonMobil Karl Woods – Woodside Ken Powell – Cameron Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Tom Van Aschwege – Stress Engineering Karina Vitale – Chevron Rune Mode - Statoil Shadi – ODI Co- Chairman Don Wells – Hess John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group Integrity Management Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE John Macneill – Stress Engineering

Membership Graeme Davies – DNV Co- Chairman John Fassero – ExxonMobil Karl Woods – Woodside Ken Powell – Cameron Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Tom Van Aschwege – Stress Engineering Karina Vitale – Chevron Rune Mode - Statoil Shadi – ODI Co- Chairman Don Wells – Hess John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group Integrity Management Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE John Macneill – Stress Engineering

Membership Graeme Davies – DNV Co- Chairman John Fassero – ExxonMobil Karl Woods – Woodside Ken Powell – Cameron Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Tom Van Aschwege – Stress Engineering Karina Vitale – Chevron Rune Mode - Statoil Shadi – ODI Co- Chairman Don Wells – Hess John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group Integrity Management Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE John Macneill – Stress Engineering

We’ve Organized Ourselves Charter Operations Activities Integrity Management Activities Detailed Description of Reliability Tools Detailed Guidance of Technology Readiness Mission Identify Best Practices and Potential Improvements to the assessment and management of subsea reliability and Integrity throughout Design and Operation stages Objectives Draft Section to address Reliability and Integrity Management during Operations Draft Section to provide Guidance on the Application of Reliability and Integrity Management Make improvements to the existing document Collection of Data Clarity on Technical Readiness Levels Align itself with DnV A 203

Path Forward Will apply from Concept to Abandonment Integrity Management will be integrated It will not define the equipment, but leave it generic It will include Strategies / Methodologies, recommendations It will follow 17N basic steps Define what is required up front Live with it Feedback Learning's We will write separately then Integrate with 17N Will take advantage of ASME Industry Forum in November

Divide and Conquer Define IM…Reliability, Availability, etc Gather other Industry Documentation Write “How to Integrity Management” Integrate into API 17N IM into 17N or 17N into IM Communicate External Internal