All Things Natural Gas Infrastructure, Rates and Policy

Slides:



Advertisements
Similar presentations
Bluewater Constructors, Inc. General Contractors Serving the Pipeline Industry Stations Terminals Pipeline Rehabilitation/Relocation/Repairs Houston, Texas.
Advertisements

Pat Wood III, Chairman Federal Energy Regulatory Commission New Englands Platform for Infrastructure Development Boston September 13, 2004.
Donald Mason, Esq. Commissioner Emeritus and former Chair of NARUC Gas Committee Atlanta, November, 2010.
Cove Point On The One-yard Line WVONGA Fall Meeting September 11, 2013.
FERC 1 APGA Annual Conference Halifax, Nova Scotia FERC Priorities in an Evolving Natural Gas Market Suedeen G. Kelly Commissioner, FERC August 2, 2005.
1 The Honorable Suedeen G. Kelly Commissioner, Federal Energy Regulatory Commission IPAA 2004 Mid-Year Meeting June 14, 2004 “A FERC Perspective on Natural.
Capitol Hill Ocean Week Managing Emerging Demands for LNG.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
Environmental Regulation and Liquefied Natural Gas Commissioner Suedeen G. Kelly, FERC Duke Environmental Law & Policy Forum November 19, 2004.
Pat Wood, III, Chairman Federal Energy Regulatory Commission Energy Infrastructure Washington D.C. April 5, 2005.
What’s Up With Infrastructure? Interstate Pipeline Regulatory Committee Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects.
Dena E. Wiggins February 16, 2015 National Association of Regulatory Utility Commissioners Winter Meeting CONNECTING THE DOTS: FROM THE WELLHEAD.
SEARUC 2003 Annual Meeting Pinehurst, North Carolina June 9, 2003 Pat Wood, III Federal Energy Regulatory Commission.
February 22, 2001 Alaskan Pipeline Meeting Agenda Introduction to Enron & El Paso Assessing the Alaskan Gas Impact Enron & El Paso Value Added.
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
Bryan Hassler, Executive Director Western Energy Institute Domestic Supply Perspectives October 23, 2003 Las Vegas, NV.
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
1 California’s Role in the West Coast and Pacific Basin LNG Markets.
Outlook on Natural Gas and LNG. Fuel Diversity in New England Recent build-out ~10,700 MW Gas-fired generation (% Total NE GWh) –1999: 16% –2003: 41%
NATURAL GAS ROUNDTABLE Commissioner Suedeen G. Kelly, FERC February 24, 2004 “Pending Natural Gas Issues”
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
Liquid Natural Gas (LNG) Facilities. LNG: What is it? Natural gas converted to liquid at -260 F Natural gas converted to liquid at -260 F 1/600 of original.
Wyoming Pipeline Authority August 30, 2005 Gaylen Haag Business Development Questar Pipeline Company.
Robert Cupina, Principal Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Hot Button Issues and Priorities SGA Fall Leadership.
Commissioner Suedeen Kelly Federal Energy Regulatory Commission Energy Infrastructure in the West February 24, 2006.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
5/10/07 Pipeline CO2 Spec Columbia Gas1.25 ANR Pipeline2.00 Panhandle Eastern2.00 Texas Eastern3.00 Tennessee3.00 Rockies Express Northern Natural Another.
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct 2005 Authorities & FY06 Status of LNG Facilities and Pipelines IRWA Federal.
© 2008 ICF International. All rights reserved. New York Gas Market Overview Based on NYSERDA Case 1 (n0908) March 2009 Contacts: Kevin R. Petak (
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Leadership Wyoming Class of 2005 Gillette, WY October 21,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Public Symposium on LNG Bowdoin College Brunswick, Maine Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Regulatory Overview of LNG LSU Center for Energy Studies Energy Summit Baton Rouge, Louisiana October 20, 2005 Robert Cupina, Deputy Director, Office of.
FERC Organization Chart
Natural Gas Transmission Regulation in the US Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects Federal Energy Regulatory.
A wholly owned subsidiary of Cheniere Energy, Inc. American Stock Exchange: LNG Cheniere LNG Energy Summit 2004 “Securing Louisiana’s Economic Growth in.
Regulation and Investment in the U.S. Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission GIE Annual Conference.
HYDROPOWER: A Comparative Energy Review J. Mark Robinson JMR Energy Infra, LLC NWHA February 23, 2011.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
Energy Action Plan Natural Gas Update California Public Utilities Commission California Energy Commission Randy Roesser December 8,
LNG in North America Tommy Stone – Vice President, Operations & Engineering Trunkline LNG Company, LLC – Lake Charles, LA Tommy Stone – Vice President,
FERC Office of Energy Projects 1 Global LNG Outlook 2004 Regulatory Status & Challenges in the U.S. Richard R. Hoffmann, Director Division of Gas – Environment.
The FERC Review Process and The Importance of Safe Pipeline and LNG Terminal Operation NASFM Annual Meeting- July 8, 2005 Office of Energy Projects Federal.
LNG Regulatory Update 2 nd Annual Global LNG Outlook October 27, 2005 Houston, Texas Jeff C. Wright, Chief Energy Infrastructure Policy Group Office of.
Michael Dirrane Director, Northeast Marketing NASUCA 2012 Annual Meeting November 13, 2012.
LNG: Regulatory and Regional Considerations The Energy Council’s LNG/CNG Workshop Biloxi, Mississippi April 8, 2005 Robert Cupina, Deputy Director, Office.
Frank J. Macchiarola Executive Vice President May 6, 2015 Conference of Western Attorneys General The LNG Export Opportunity.
TEXAS TEXAS Current Status of Liquid Natural Gas Terminals & Offshore Wind Farms Jerry Patterson Commissioner Capitol Hill Ocean Week 2006 – State and.
LNG USA Houston, Texas J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission September 23, 2004.
1 Federal Energy Regulatory Commission John M. Wood, Acting Director Division of Pipeline Certificates Office of Energy Projects FERC Update Florida Energy.
1 Energy Crisis and Solutions for California Oilfield Producers Gas Supply and Demand and Future Outlook Presented by William J. Keese, Chairman California.
California Energy Commission 1 California’s Role in the West Coast and Pacific Basin LNG Markets LNG Asia Pacific 2006 Event February 13, 2006 Seoul, Korea.
United States and Canada Region 1. Nations to know: USA & Canada.
1 Casper Cheyenne Questar Wamsutter Pipeline Project Description Montana North Dakota South Dakota Nebraska Colorado Utah Wyoming Phase1 245 mile pipeline.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
The Northeast Natural Gas Market in 2030 LNG EXPRESS CONFERENCE Boston, Massachusetts September 21, 2006 William Trapmann Natural Gas Analysis Team Leader.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Managing Our Future: A Case for LNG NARUC Summer Committee Meetings Keith Meyer President, Cheniere Marketing July 2007 CHENIERE ENERGY, INC.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure.
California Energy Commission LNG’s Role for Expanding Natural Gas Supplies and Update on West Coast Projects Presented to West Coast PTTC Workshop Valencia,
MACRUC’s Annual Education Conference June 3, 2008 Kevin R. Petak Vice President, Gas Market Modeling ICF International The.
Landon Derentz Energy Policy Advisor Bureau of Energy Resources U.S. Department of State Shale Gas and Tight Oil Production in the United States 1.
Continuing Progress of LNG Terminals in the Gulf Coast Region
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure February 13, 2004.
LNG Terminal Permitting J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission before the California Senate Energy,
Understanding the Impacts of Incremental Gas Supply on the Flow Dynamics Across the North American Grid Canadian Institute Vancouver, BC November 20, 2006.
Exploring Pipeline Dynamics to Connect New Markets
Natural Gas World Presentation T
Presentation transcript:

All Things Natural Gas Infrastructure, Rates and Policy John Carlson Office of Energy Markets and Reliability Federal Energy Regulatory Commission

Cheniere Creole Trail (3,300) Cheniere Corpus Christi (2,600) Major Pipeline Projects Certificated (MMcf/d) January 2000 to July 2007 1. Algonquin (285) 2. Islander East (285) 3. Iroquois (230,85, 100) 4. Columbia (135,270) 5. Algonquin (140) 6. Transcontinental (105) 7. Transcontinental (130) 8. Transcontinental (100) 9. Tennessee (200,82) 10. Maritimes (80,360,418) 11. Algonquin (301) 12. Tennessee (500) 13. Mill River (800) 14. Tennessee (136) 15. Texas Eastern (900) 16. Algonquin (325) 17. Algonquin (800) 18. CIG (282,92) 19. CIG (85,133,118,105) 20. TransColorado (125,300,250) 21. WIC (120,116,675,350,556) 22. El Paso (140) 23. Rendezvous (300) 24. Entrega (1,500) 25. Northwest (450) 26. Rockies Express West (1,800) Northwest (162,113) GTN (207) Northern Border (544,130) Guardian (750) Northwest (224) Empire (250) ANR (194,220, 107,143,168) Dominion (700) 10 Northern Natural (374) Millenium (525) 14 9 13 17 WBI (80) 1 16 Northwest (191) 8 11 5 Tuscarora (96) 23 Horizon (380) 24 7 2 Trailblazer (324) NFS/DTI (150) 3 21 26 Vector (245) TETCO (150) 12 6 TETCO (223) 15 4 Questar Overthrust (550, 750) TETCO (250) Transco (165) Questar (272,102,175) 8 6 18 20 Columbia (172) Kern River (135,886) 19 Midwestern (120) Cove Point (445,800) 25 Cheyenne Plains (560,170) Equitrans (130) 22 East Tennessee (235) Kern River (282) Southern Trails (120) Center Point (113) East Tennessee (86) East Tennessee (510) East Tennessee (170) Transco (204,236,323) El Paso (502) Transwestern (150,375) TETCO (197) Trans Union (430) McMoRan (1,500) Otay Mesa (110) North Baja (500) El Paso (230,320,620) Trunkline (510) Petal (700,600) SCG Pipeline (190) Center Point (1,237, 280) Discovery (150) Gulf South(1,700) Natural (200) Cameron (1,500) Southern (336,330,500) Port Arthur (3,000) Trunkline (200) Florida Gas (239,270,160) Dominion South (200) Gulf LNG (1,500) San Patricio (1,000) Tennessee (400,200) Cheniere Creole Trail (3,300) Calypso (832) 70.68 BCF/D Total 10,118 Miles Trunkline(1,500) Gulfstream (1,130, 345) Sonora (1,000) Ocean Express (842) Kinder Morgan (3,395) Tennessee (320) Golden Pass (2,500) Cheniere Sabine (2,600) Vista del Sol (1,100) Cheniere Corpus Christi (2,600)

Cheniere Creole Trail (3,300) Cheniere Corpus Christi Major Pipeline Projects Certificated (MMcf/d) January 2005 to July 2007 Algonquin (325) NE ConneXion (Tennessee) (136) Phase IV (Maritimes) (418) Iroquois (100) 1. TransColorado (300,250) 2. Rendezvous (300) 3. WIC (350,556) 4. Entrega (EnCana) (1,500) 5. Questar (102,175) 6. Northwest (450) 7. Questar Overthrust (550,750) Northern Border (Chicago III)(130) Millennium (525) Tennessee (82) Transcontinental (105) Empire (250) Northern Lights (Northern Natural) (374) Algonquin (800) ANR (168) Mill River (800) 4 Dominion (700) Transcontinental (100) 7 2 Rockies Express West (1,800) TETCO (150) 5 3 2007 Expansion (Vector Pipeline) (245) Logan Lateral (Texas Eastern) (900) 1 Columbia (172) 6 Transco (165) Equitrans (130) Midwestern (120) Cove Point Pipeline (800) Jewell Ridge Pipeline (East Tennessee) (235) CIG (105) CenterPoint(113) Trunkline(510) El Paso (502) Kinder Morgan (3,395) Gulf South (1,700) Cypress Pipeline (Southern Natural) (500) CenterPoint(1,237, 280) Petal (600) Port Arthur (3,000) McMoRan (1,500) Florida Gas (160) Natural (200) Golden Pass (2,500) Gulf LNG (1,500) Dominion South (200) Triple-T Extension (Tennessee) (200) 44.06 BCF/D Total 3,753 Miles Gulfstream (345) 12.6 BCF/D Total 903 Miles Sonora (1,000) Cheniere Creole Trail (3,300) San Patricio (1,000) Cameron (1,500) Vista Del Sol (1,100) Cheniere Corpus Christi (2,600)

Purpose of Pipeline Varies Over Time Approved Capacity Approved Mileage Capacity Mileage Source: FERC

Major Pipeline Projects Pending (MMcf/d) July 2007 Quoddy Bay (2,000) Downeast (500) Bradwood Landing (NorthernStar) (1,300) GII Project (Guardian Pipeline) (537) Medicine Bow Expansion (WIC) (330) Illinois Pipeline (Kinder Morgan) (360) Broadwater Pipeline (Broadwater) (1,000) Mid-Atlantic Express (1,500) High Plains Expansion (CIG) (899) Rockies Express REX East (Rockies Express Pipeline) (1,800) Phoenix Lateral (Transwestern) (500) Fayetteville/Greenville (Texas Gas) (1,609) Southeast Expansion (Gulf South) (560) North Baja Expansion (North Baja Pipeline) (2,700) Gulf Crossing Pipeline (Boardwalk) (1,732) Elba Express (1,175) Southeast Supply Header (Southeast Supply Header) (1,140) Point Comfort (1,000) Cedar Bayou (Texas Eastern) (360) 22.36 BCF/D Total 2,802 Miles IV Projects (Gulfstream) (155) Port Dolphin (1,200)

Major Pipeline Projects Pre-Filing (MMcf/d) July 2007 Pacific Connector (Williams Pacific) (1,000) 08/09 Expansion (Iroquois) (200) Pacific Connector PF06-26 36-inch, 223 pipeline, 1,000 MMcf/d Sentinel Expansion (Transcontinental) (151) Brookhaven Lateral (Iroquois) (80) 2009 Expansion (Eastern Shore) (60) East End Expansion (Ozark) (1,000) Yuma Lateral (North Baja) (81) Mid-continent Express (1,500) 4.07 BCF/D Total 1,060 Miles

Major Pipeline Projects On The Horizon (MMcf/d) July 2007 Panhandle Eastern (750) Kinder Morgan (360) Kinder Morgan (170) Northern Natural (82) Vector (230) Trunkline (650) Seminole (80) Alaska (4,000) Mid-Continent Crossing – 1.75 Bcf/d and 1,600 miles of pipeline. Mid-Continent Express – Kinder Morgan, 1,500 MMcf/d and 780 miles of pipeline. East to West Expansion (Algonquin) (2,000) Northeast Expansion (NFG) (500) Greasewood Lateral (Northwest) (200) Paso Norte Pipeline Project (380) Colorado Hub (Northwest) (250) A/G Line Expansion (Natural)(139) Transcontinental (Mobile Bay) (700) Shenzi Lateral (Enbridge) (100) Henry Hub Expansion (Trunkline) (600) Carthage Lateral (Tennessee) (100) Houston Market (KM Interstate) (400) Highland Trails (Southern Star)(1,000) Henry Hub (Columbia Gulf) (200) Gulfstream (750) 13.64 BCF/D Total 4,321 Miles

Storage Projects (Capacity in Bcf) ANR Pipeline (17.0) ANR Pipeline (14.7) SemGas (5.5) Northern Natural (2.1) Bluewater (29.2) Central NY (13.0) Northern Natural (8.5) Dominion (4.4) Dominion (18.0) Dominion (9.4) Steckman Ridge (12.0) Columbia (16.4) Unocal Windy Hill (6.0) Columbia (15.0) CIG (7.0) Texas Gas (8.2) Texas Eastern (3.0) Northern Natural (6.0) Texas Gas (11.3) Columbia (12.4) Texas Gas (8.25) Texas Gas (6.8) Arizona Natural Gas (3.5) Monroe Gas (12.0) Natural (10.0) Mississippi Hub (12.0) Gulf South (1.2) County Line (6.0) CenterPoint (3.0) Freebird (6.1) Caledonia (11.7) Caledonia (1.7) Natural (10.0) Enstor (30.0) Leaf River Energy (16.0) Falcon Worsham-Steed (8.0) Falcon MoBay (50.0) Falcon Hill-Lake (3.0) Certificated Since 1/1/05 SG Resources (12.0) Tres Palacios (36.0) Currently Pending Golden Triangle (12.0) Copiah (12.2) Bobcat (12.0,1.5) Floridian Natural (8.0) Pre-Filing Starks (19.2) Petal (4.0) Southeast Storage (14.0) Liberty (17.6) On The Horizon Egan Hub (8.0) Petal (2.8) PetroLogistics (6.0) Black Bayou (11.0)

North American LNG Terminals FERC North American LNG Terminals Existing U.S. A. Everett, MA : 1.035 Bcfd (SUEZ LNG - DOMAC) B. Cove Point, MD : 1.0 Bcfd (Dominion - Cove Point LNG) C. Elba Island, GA : 1.2 Bcfd (El Paso - Southern LNG) D. Lake Charles, LA : 2.1 Bcfd (Southern Union - Trunkline LNG) E. Gulf of Mexico: 0.5 Bcfd, (Gulf Gateway Energy Bridge - Excelerate Energy) Mexico F. Altamira, Tamulipas: 0.7 Bcfd, (Shell/Total/Mitsui) A B C D E F US Jurisdiction FERC US Coast Guard As of June 20, 2007 9

North American LNG Terminals Approved FERC FERC US Jurisdiction 10 APPROVED - UNDER CONSTRUCTION U.S. 1. Hackberry, LA: 1.5 Bcfd (Cameron LNG - Sempra Energy) 2. Freeport, TX: 1.5 Bcfd, (Cheniere/Freeport LNG Dev.) 3. Sabine, LA: 2.6 Bcfd (Sabine Pass Cheniere LNG) 4. Sabine, TX: 2.0 Bcfd (Golden Pass - ExxonMobil) 5. Cove Point, MD : 0.8 Bcfd (Dominion - Expansion)* 6. Sabine, LA: 1.4 Bcfd (Sabine Pass Cheniere LNG - Expansion) Canada 7. St. John, NB: 1.0 Bcfd, (Canaport - Irving Oil) Mexico 8. Baja California, MX: 1.0 Bcfd, (Sempra) APPROVED - NOT UNDER CONSTRUCTION U.S. - FERC 9. Corpus Christi, TX: 1.0 Bcfd (Ingleside Energy - Occidental Energy Ventures) 10. Corpus Christi, TX: 2.6 Bcfd, (Cheniere LNG) 11. Corpus Christi, TX : 1.1 Bcfd (Vista Del Sol - ExxonMobil) 12. Fall River, MA : 0.8 Bcfd, (Weaver's Cove Energy/Hess LNG) 13. Port Arthur, TX: 3.0 Bcfd (Sempra) 14. Logan Township, NJ : 1.2 Bcfd (Crown Landing LNG - BP 15. Cameron, LA: 3.3 Bcfd (Creole Trail LNG - Cheniere LNG) 16. Freeport, TX: 2.5 Bcfd (Cheniere/Freeport LNG Dev. - Expansion) 17. Hackberry, LA: 1.15 Bcfd (Cameron LNG - Sempra Energy - Expansion) 18. Pascagoula, MS: 1.5 Bcfd (Gulf LNG Energy LLC) 19. Pascagoula, MS: 1.6 Bcfd (Casotte Landing - ChevronTexaco) U.S. - MARAD/Coast Guard 20. Port Pelican: 1.6 Bcfd, (Chevron Texaco) 21. Louisiana Offshore : 1.0 Bcfd (Gulf Landing - Shell) 22. Gulf of Mexico: 1.0 Bcfd (Main Pass McMoRan Exp. 23. Offshore Boston, MA: 0.4 Bcfd (Neptune LNG - Tractebel) 24. Offshore Boston, MA: 0.8 Bcfd (Northeast Gateway - Excelerate Energy) 25. Kitimat, BC: 1.0 Bcfd (Galveston LNG) 26. Baja California - Offshore : 1.4 Bcfd, (Chevron Texaco) 25 7 23 24 12 14 5 26 8 13 3,6 18 2,16 19 4 15 1,17 10 11 9 20 22 21 US Jurisdiction FERC US Coast Guard * Expansion of an existing facility As of June 20, 2007 10

North American LNG Terminals FERC North American LNG Terminals Proposed PROPOSED TO FERC 1. Long Beach, CA : 0.7 Bcfd, (Mitsubishi/ConocoPhillips - Sound Energy Solutions) 2. LI Sound, NY: 1.0 Bcfd (Broadwater Energy - TransCanada/Shell) 3. Bradwood, OR: 1.0 Bcfd (Northern Star LNG - Northern Star Natural Gas LLC) 4. Port Lavaca, TX: 1.0 Bcfd (Calhoun LNG - Gulf Coast LNG Partners) 5. Pleasant Point, ME: 2.0 Bcfd (Quoddy Bay, LLC) 6. Robbinston, ME: 0.5 Bcfd (Downeast LNG - Kestrel Energy) 7. Elba Island, GA: 0.9 Bcfd (El Paso - Southern LNG Expansion)* 8. Baltimore, MD: 1.5 Bcfd (AES Sparrows Point - AES Corporation) 9. Coos Bay, OR: 1.0 Bcfd (Jordan Cove Energy Project) 10. Astoria, OR: 1.5 Bcfd (Oregon LNG) PROPOSED TO MARAD/COAST GUARD 11. California Offshore: 1.5 Bcfd (Cabrillo Port - BHP Billiton) 12. California Offshore : 1.4 Bcfd, (Clearwater Port LLC) 13. Gulf of Mexico: 1.4 Bcfd (Bienville LNG - TORP Technology) 14. Offshore Florida: 1.9 Bcfd (SUEZ Calypso - SUEZ LNG) 15. Offshore California: 1.2 Bcfd (OceanWay - Woodside Natural Gas) 16. Offshore Florida: 1.2 Bcfd (Hoëgh LNG - Port Dolphin Energy) 5 6 10 3 9 2 8 15 11 1 12 7 16 14 13 4 US Jurisdiction FERC US Coast Guard * Expansion of an existing facility As of June 20, 2007 11

North American LNG Terminals FERC North American LNG Terminals Potential 10 POTENTIAL U.S. SITES IDENTIFIED BY PROJECT SPONSORS 1. Offshore California: 0.75 Bcfd, (Chevron Texaco) 2. St. Helens, OR: 0.7 Bcfd (Port Westward LNG LLC) 3. Philadelphia, PA: 0.6 Bcfd (Freedom Energy Center - PGW) 4. Calais, ME: ? Bcfd (BP Consulting LLC) 5. Offshore New York: 2.0 Bcfd (Safe Harbor Energy - ASIC, LLC) 6. Offshore California: 0.6 Bcfd (Pacific Gateway - Excelerate Energy) 7. Offshore California: 1.2 Bcfd (Esperanza Energy - Tidelands) POTENTIAL CANADIAN SITES IDENTIFIED BY PROJECT SPONSORS 8. Quebec City, QC : 0.5 Bcfd (Project Rabaska - Enbridge/Gaz Met/Gaz de France) 9. Rivière-du- Loup, QC: 0.5 Bcfd (Cacouna Energy - TransCanada/PetroCanada) 10. Prince Rupert, BC: 0.30 Bcfd (WestPac Terminals) 11. Goldboro, NS 1.0 Bcfd (Keltic Petrochemicals) 12. Énergie Grande-Anse QC: 1.0 Bcfd POTENTIAL MEXICAN SITES IDENTIFIED BY PROJECT SPONSORS 13. Puerto Libertad, MX: 1.3 Bcfd (Sonora Pacific LNG) 14. Offshore Gulf, MX: 1.0 Bcfd (Dorado - Tidelands) 15. Manzanillo, MX: 0.5 Bcfd 16. Topolobampo, MX: 0.5 Bcfd 17. Baja California, MX : 1.5 Bcfd (Energy Costa Azul - Sempra - Expansion) 12 9 8 11 4 2 3 5 6 7 1 17 13 16 14 US Jurisdiction FERC MARAD/USCG 15 As of June 20, 2007 12

Atlantic Basin Liquefaction and FERC LNG Re-gasification Capacity Golden Pass LNG Sabine Pass LNG (Expansion) Cameron LNG Cove Point LNG (Expansion) Sabine Pass LNG Freeport LNG Slide reflects new Atlantic Basin liquefaction capacity numbers from CERA and the inclusion of Ingleside Energy as under construction. Also, an additional 1Bcf/d was added to the liquefaction number in April 2009 to serve Golden Pass LNG from Qatar. Source: Cambridge Energy Research Associates and FERC Staff Data Base

Billion cubic feet per day The Gap Between North American Demand and Production Will Grow Between 2005 to 2030 Billion cubic feet per day Production Demand High Reference Low Increasing gap between North American production and demand will have to be met with LNG North American Supply/Demand Gaps 10.7 Bcf/d 17.2 23.8 Source: Energy Information Administration (U.S.)