Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Slides:



Advertisements
Similar presentations
By: Richelle DeCuir Title 1 Wetlands Workshop January 15, 2004 Hi, Im Richelle DeCuir from CenLA. Im concerned because Louisiana supplies the largest port.
Advertisements

Time Series for Central West Grand Terre Island of the Lafourche Shoreline Aerial Video Survey Program Pontchartrain Institute of Environmental.
Feasibility Study Overview Louisiana Coastal Area Ecosystem Restoration 19 September 2000.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Matthew Nowlin – CPRA – Staff.
1 Levee Board Consolidation Legislation Southeast Louisiana and Greater New Orleans.
Update on Southwest Louisiana Projects Office of Coastal Protection and Restoration.
Lonnie G. Harper & Associates, Inc. Lonnie G. Harper, PE & PLS (LGH) David Minton, PE (LGH) Dr. Joseph Suhayda (Coastal Oceanographic Consultant) Dr. Roy.
Wetlands and Hurricanes By Wynn W. Cudmore, Ph.D. Northwest Center for Sustainable Resources DUE # This project supported in part by the National.
Industry Day May 6, Acres Semi-confined placement Pipe will be moved frequently No dewatering structures Marsh will be at different elevations.
Restoring Environment- Maintaining Infrastructure; Tradeoffs for Long Term Sustainability Bob Stokes President Galveston Bay Foundation
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
Shell Island West NRDA Restoration
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Update Bren Haase Louisiana Office of Coastal Protection and Restoration Presentation.
A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I.
Coastal Protection and Restoration Authority January 18, 2012 Deepwater Horizon Early Restoration Phase I.
Oyster Bayou Marsh Restoration (CS-59) Kodi Collins, P.E. Engineering Division May 6, 2014 committed to our coast.
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008.
Salt Water Intrusion Mapping Update Akintunde Owosina Chief, Hydrology and Hydraulics Bureau Operations, Engineering & Construction Division Akintunde.
Historical Context: How has the Caloosahatchee River/Estuary been altered? How does it fit within the broader system? Michael L. Parsons Coastal Watershed.
LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014.
Governor's Advisory Commission on Coastal Protection, Restoration, and Conservation June 6, 2012 Deepwater Horizon.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
DRAFT CORPS OF ENGINEERS CONTRACTS: Louisiana Coastal Area, Mississippi River Gulf Outlet, and Lake Pontchartrain & Vicinity Presented to the Coastal Protection.
A Louisiana Treasure. What is a wetland? A low-lying area of soft waterlogged ground and standing water Transition zones between land and water Three.
Tools for Managing Sediment for Coastal Restoration in Louisiana Edward Haywood III, Syed M. Khalil, and Richard C. Raynie Coastal Protection & Restoration.
U.S. Department of the Interior Minerals Management Service Capital Hill Oceans Week Renee Orr Chief, Leasing Division Minerals Management Service Herndon,
Time Series for the east end of Raccoon Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
Oil Spill Restoration Planning – Part 1 (RESTORE Act, NRDA, SEPs) Kyle Graham Deputy Executive Director CPRA 8/22/2012 committed to our coast.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Unit 1 Louisiana’s Changing Wetlands. Introductory Facts: –So. Louisiana contains 40% of total coastal marshland in the contiguous United States –Wetlands.
CPRA Financing Corporation December 18, 2012 Deepwater Horizon Oil Spill.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Managing the Mississippi River’s Sediment, Nutrients, and Fresh Water July 13, 2011.
Time Series for Ocean, La of the Louisiana Chenier Plain Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Time Series for Hewes Point, North end of the Chandeleur Islands Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Oyster Advisory Commission October 3, 2012 Deepwater Horizon.
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
Building Strong 1 1 MRGO Ecosystem Restoration Plan Feasibility Study Gregory Miller Senior Project Manager Corps of Engineers New Orleans District October.
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana Draft.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
Time Series for Dago Hole of the Chandeleur Islands Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University.
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
LAKE HERMITAGE MARSH CREATION BA-42 FINAL (95%) DESIGN REVIEW MEETING NOVEMBER 3, 2008.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
Upper St. Johns River Basin Project US Army Corps of Engineers A joint project between the St. Johns River Water Management District and the Jacksonville.
Hydrology of Louisiana’s Wetlands Loss of Wetlands The coastal wetlands are eroding at exceedingly high rates. In the 1970s, when land loss rates were.
Louisiana Coastal Area
CPRA Program Update ACEC Project Outlook 2017 November 16, 2017
Abbot’s Hall Farm, Essex
Committed to our coast Preliminary Assessment of Restoration Impacts in the Isles Dernieres, Terrebonne Parish, LA CPRA Board Meeting Baton Rouge,
Presentation transcript:

Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration Authority of Louisiana 1

V ICINITY M AP Location: Calcasieu – Sabine Basin Cameron Parish 5 mi. NE of Johnson’s Bayou 5 mi. N of the Gulf of Mexico 2

CWPPRA PPL 22 Federal Sponsor: NMFS Avg. water elevation: 1.5 feet Landloss rate: -0.94%/yr. (USGS, ) Create/restore over 350 acres of coastal marsh habitat Create approximately 35,000 LF of earthen terraces Re-establish hydrologic connectivity Coastal Protection and Restoration Authority of Louisiana P ROJECT B ACKGROUND 3

Coastal Protection and Restoration Authority of Louisiana P ROJECT M AP 4

Coastal Protection and Restoration Authority of Louisiana C AUSES Rapid fluid and gas extraction Hurricanes Saltwater intrusion Subsidence Hydrologic alterations 5

M ARSH C REATION Coastal Protection and Restoration Authority of Louisiana 6 Restore 352 acres Borrow from the Gulf of Mexico Pump via pipeline, ~6 mi. Target marsh elevation +1.5 ft. 20,000 ft. containment dike Planted ft. shoreline 5,191 ft. shoreline 15,300 ft. shoreline 7,920 ft. subline

T ERRACING Coastal Protection and Restoration Authority of Louisiana 7 Construct 35,000 LF of earthen terraces +2.5 ft. NAVD ft. crown width Planted

R E - ESTABLISH H YDROLOGIC C ONNECTIVITY Coastal Protection and Restoration Authority of Louisiana 8 Clean out 30,000 LF of canals Drainage canals filled in with debris due to hurricanes B1 Canal

P ROJECT F UTURE Coastal Protection and Restoration Authority of Louisiana Engineering and Design: Hydrodynamic modeling Topographic, bathymetric, and magnetometer survey Geotechnical investigation Offshore borrow site investigation Compete for CWPRRA Phase II Funding: December

Coastal Protection and Restoration Authority of Louisiana QUESTIONS 10