Image Quality Upgrade Kickoff Meeting Daniel O’ConnorAugust 6, 2002.

Slides:



Advertisements
Similar presentations
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Advertisements

Systems Implementation and Operation
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
MET ONE 7000 Series Remote Airborne Particle Counters Customer Name Date Presenter Presenter Title.
Exhaust Emissions Analyzer Introduction In a day when global CO 2 levels are one of the greatest concerns of society, surprisingly few advances have been.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
Darcy Bibb Oceanit Mentor: Tony Bartnicki Advisor: Curt Leonard Home Institution: Maui Community College Integration of a Small Telescope System for Space.
System Development Life Cycle (SDLC)
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Design, Implementation and Maintenance
Alvarado,Cappelletti,Puglisi,Ferrari,Kudhoos.
November 2009 Network Disaster Recovery October 2014.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
SDLC: System Development Life Cycle Dr. Bilal IS 582 Spring 2006.
Performance and Control of the MMT Thermal System G. G. Williams a, J. D. Gibson a, S. Callahan b, D. Blanco a, J. T. Williams a,b, and P. Spencer a (
Chapter 10.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Introduction Optimizing Application Performance with Pinpoint Accuracy What every IT Executive, Administrator & Developer Needs to Know.
1 Validation & Verification Chapter VALIDATION & VERIFICATION Very Difficult Very Important Conceptually distinct, but performed simultaneously.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
SDLC: System Development Life Cycle Dr. Dania Bilal IS 582 Spring 2007.
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Systems Analysis and Design
 System Development Life Cycle System Development Life Cycle  SDLC Phases SDLC Phases Phase 1: Preliminary Investigation Phase 2: Feasibility Study.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Introduction to Software Project Estimation I (Condensed) Barry Schrag Software Engineering Consultant MCSD, MCAD, MCDBA Bellevue.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
Title_Sli de Quality Controlling Wind Power Data for Data Mining Applications Gerry Wiener Research Applications Laboratory Software Engineering Assembly,
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Fundamentals of Information Systems, Third Edition1 An Overview of Transaction Processing Systems Every organization has transaction processing systems.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Database Administration Basics. Basic Concepts and Definitions  Data Facts that can be recorded and stored  Metadata Data that describes properties.
Cryogenic Hygrometer and Filter Radiometers Ali Aknan Stephanie Vay Melody Avery Jim Plant Charles Hudgins.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Chapter 1 WHAT IS A COMPUTER Faculty of ICT & Business Management Tel : BCOMP0101 Introduction to Information Technology.
Accounting systems design & evaluation 9434SB 18 March 2002.
The Blanco Environmental Control System Alistair R. Walker November
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Task T6.2 Tertiary Buildings infrastructures installations
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Blanco Environmental Control System
Fundamentals of Information Systems, Sixth Edition
Alistair Walker Version 3 December
SDLC: System Development Life Cycle
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
INSTRUMENT CONTROLLER OVERVIEW
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Human Resource Planning (HRP) Dr. Salim AlShukaili
System Development Life Cycle (SDLC)
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
ICAS Alarm Upgrade ICAS Alarm Upgrade Project
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
25Live Scheduling System Enhancements
Presentation transcript:

Image Quality Upgrade Kickoff Meeting Daniel O’ConnorAugust 6, 2002

GOAL: Make the IRTF a Telescope which is atmosphere seeing limited

Part I. l Improve HVAC System (TB) l Monitor Dome Environment (DYW) l Provide Routine Image Quality Assessment (DOC) l Characterize Static Optics of Telescope (DOC) l Provide WEB based Documentation (DOC)

Individual Presentations l Tim - HVAC l Darryl – Monitoring System l Miranda – Software, WEB l Dan – all else

HVAC UPGRADE GOAL : To have an operational HVAC system in place, with the capability to set the dome thermal environment to a temperature specified by the operator. That temperature will be based on predictions as to what the outside temperature will be during that evenings observing run.

HVAC : History l Hired consultant to make recommendations. l Recharged refrigeration circuit. l Replaced compressor. l Simplified system circuitry. l Misc. smaller items.

HVAC : Dome Seals l Air infiltration is currently overwhelming the HVAC system. l Dome Skirt l Dome Slit (sides) l Dome Slit (top)

HVAC : Primary Cooling l Makes sense to concentrate cooling effort where it is required the most. l May be possible to utilize coude loop hardware in primary mirror cooling scheme.

HVAC : Misc. High Priority Items l Need to specify, order, install, and calibrate several temperature sensors, and flow meters. l Install air bleeds in coude loop. l Install defrost circuit in coude loop l Install air separator.

HVAC : Medium Priority Items l Implement a control system. l Examine machinery room ventilation. l Determine exhaust tunnel utilization. l Install Expansion Tank l Adjust Dome Louvers

HVAC : Low Priority Items l Overall System Documentation l Emergency Shutdown Procedures l Staff Training

HVAC : Schedule l Blah, blah

HVAC : Schedule

Monitoring Dome Environment The goal is to be able to accurately monitor and record the temperature and humidity of our dome/telescope environment Use existing Johnson Controls temperature and humidity sensors in dome ceiling Install new sensors external to dome, on the telescope, and on primary mirror Warning ‘pop-up’ message on operators screen to notify of potential risk to optics Archive database and make web accessible

Sensors Omega PT100 SensorsJohnson Controls Sensors Vaisala Sensors

LakeShore 218E Monitor Omega DP472 Data Monitoring Hardware

Internal Dome Sensors T T H H H T T T T T 20.5’ 33’ 45.5’ T T T T 2’

External Dome Sensors H T T

Dome and External Sensor Locations TT H H HHT T T T T T T T T T

Telescope/Mirror temperature sensor locations T T T T T T T T T T T T T

Dew Point Monitoring Future installment of cooling the primary mirror will put higher risk of dew and frost forming Purchase of a Vaisala HMP243 module and mount near primary Calculate the dew point using our humidity and temperature sensors Warning ‘pop-up’ message on operators screen to notify of potential risk to optics

Data Acquisition Schematic LakeShore 218E LakeShore 218E LakeShore 218E LakeShore 218E Omega DP472 Digi Portserver #1 MUX Wind Speed/Direction Vaisala Humidity Temp Sensors J.C. Humidty Sensors Telescope Mounted Sensors PT100 Mirror Mounted Sensors PT100 J.C. Temp Sensors Dome Floor Mounted Sensors PT100 RS232 Network MODEM AC MODEM MUX RS232 MODEM AC MODEM Slip Ring AC Power Digi Portserver #2 RS232 Network Telescope Dome Building Dew Pt. MonRS232

Slip Ring

Monitoring and Web Software l 24 hour monitoring of all dome and telescope sensors, with data to be archived. l GUI to notify telescope operators and IRTF staff of critical environmental changes in the dome. l Static web pages to display the collected dome environment data plots. l Real-time web pages to display current dome environment data. l Interactive web pages to display selected dome environment data. Miranda Hawarden-Ogata, Albert Fhema

Monitoring Overview Monitor System Collect Data Filter Data Archive DataWeb DisplayDisplay for TOs

Birds’ eye view of existing sensors T H H H T T T T T 20.5’ 33’ 45.5’ T T T T 2’ All sensors not mounted on the telescope itself or outside the dome will be displayed on this web page.

Sensors mounted on telescope and mirror All sensors mounted on the telescope itself will be displayed on this web page. Additional information will be displayed at the bottom of the sensor web pages. T T T T T T T T T T T T T

3.) Provide Routine Image Quality Assessment l GOAL: Build an auto-focus system for use with NSFCam and SPeX to provide and automated estimate of focus for the observer, and provide routine assessment of image quality.

3.) cont. Advantages of Auto- Focus l Observer spends less time focussing l Will focus more often (its easier) l Will provide consistent data on FWHM and Strehl, not subjective

Auto-Focus Schematic READ FOCUSWRITE FOCUS HEXAPOD HEXAPOD DAEMON NSFCamSPeX Take Image IDL Fit Routine Storage IQ Archive GUI FWHM, Strehl, Image, Fit Best Fit Focus

3.) cont. Focus Update l After A-F working, develop procedure to do Focus Update based on temperature model of telescope truss.

4.) Characterize Optics of Telescope l Goal: Understand factors in the telescope optics and mirror support system that limit image quality

4.) cont. TASKS l Hire Optical Consultant l Measure Primary and Secondary Mirrors with interferometric technique l Provide measurement of contribution to error budget l Produce final report

5.) Provide WEB based Documentation l Integrated WEB site for IQUP l Dedicated page for each sub-project

Schedule / Manpower