Commissioning (Cx) EPWOG Meeting October 21, 2003 Washington, D.C.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Sam Sleiman,
Managing a Successful Mechanical System project Following design – what next?
Commissioning. What is Commissioning? And the word Authority?
What Constitutes a Quality Commissioning Job?. Agenda Preconstruction Services –Brian Toevs, PE Construction Services –Rusty Ross, PE, LEED TM, CxA Client.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Building Commissioning
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
ACG CxA WORKSHOP WEBINAR CxA Workshop St. Petersburg, Florida 8:00 AM 13 October 2008Renaissance Vinoy Resort CxA Workshop St. Petersburg, Florida Renaissance.
ACG CxA WORKSHOP WEBINAR Facility Commissioning Group AABC Commissioning Group - CxA Workshop Las Vegas, Nevada – MGM Grand April 22, 2008 Jim Magee, CxA.
Release & Deployment ITIL Version 3
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
PMI Bluegrass May 2012 Lunch Presentation: Commissioning Building Systems Commissioning for Project Managers.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning.
The Benefits of Building Commissioning Carl N. Lawson Hanson Professional Services Inc.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
From Research Prototype to Production
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
SYSTEMS MANUALS A Systematic Approach Craig Hawkins, CxA.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning/Energy Performance Contracting.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CxA at Georgia Tech TRAINING OUTLINE Epsten Group, Darren Draper
Tier Certification Explained
Introduction to LEED Building Commissioning
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
AABC Commissioning Group - CxA Workshop Las Vegas, Nevada – MGM Grand
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Presentation transcript:

Commissioning (Cx) EPWOG Meeting October 21, 2003 Washington, D.C.

Team Members Dwayne Colburn – PNNL Marty Fallier – BNL John Gertsen – BWXT Y-12 Jim Whitcraft – Yucca Mt. Tom Etheridge – ORNL

Commissioning  What, Why, How Much ($)……  Commissioning Guidance  Applications

What is Commissioning?  …systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs.  …quality-assurance process that increases the likelihood that a newly constructed building will meet client expectations.  …systematic process for achieving, verifying, and documenting that the facility and its systems, subsystems, and equipment are planned, designed, installed, and tested, and are capable of being operated and maintained according to the Owner's Project Requirements (OPR).

When does Commissioning Occur?  The process begins with developing the OPR and extends through all phases of project delivery and into operation and maintenance.  …through all phases of a building project.  Commissioning can begin during pre-design, design, construction or building start-up. The process offers significantly greater and more cost effective benefits when it begins during pre-design or early design.

Commissioning Span of Control Commissioning Test & Balance Start-up Testing

Benefits of Commissioning  Fewer change orders during the construction process  Fewer call-backs  Long-term tenant satisfaction  Lower energy bills  Avoided equipment replacement costs  Improved profit margin for building owners once the building is occupied  Assures building’s operational staff is properly trained  Operations and maintenance manuals are compiled correctly at project turn-over.

Project documentation relevant to commissioning  Commissioning Plan  Quality Assurance Project Plans  Construction Management Plans  Test & Inspection Plans  Acceptance Test Procedures  O&M Manuals  Training Plans  Re-commissioning Management Manual

Building Systems to be Commissioned  Building envelope  Interior finish materials  HVAC/mechanical  Electrical  Life safety  Plumbing  Facility processes

Cost Expectations  O&M cost savings of 8%-20% over non-commissioned buildings  Retro-Cx costs range from 3%-5% Commissioning Scope Cost Entire Building (HVAC, Controls, Electrical, Mechanical) 0.5%-1.5% of total construction cost HVAC and Automated Control System 1.5%-2.5% of mechanical system cost Electrical Systems1.0%-1.5% of electrical system cost Energy Efficiency Measures $0.23-$0.28 per square foot

Commissioning Guidance  Web-based information:      de.pdf de.pdf de.pdf     

Commissioning Process  Develop an overall commissioning strategy  Begin early in pre-design process  Designate a Cx Agent (Cx-A)  A/E acquired  Construction contractor acquired  Independent (Owner acquired)  Form a commissioning team

Commissioning Agent Role  Represents the “Owner “ as an objective advocate  Develops the Cx Plan  Develops contract language for the A/E and Construction contracts  Guides the Cx process  Introduces standards/strategies early in design  Ensures implementation of selected measures  Verifies minimum targets have been met  Completes final Cx report

Commissioning Applications  Oak Ridge National Laboratory  3 rd Party Development  Russell Laboratory (Vivarium)  JICS/ORCAS  Research Support Center  Nuclear Facility ORR applications  Other case studies    Others?

Examples: ORNL 3 rd Private Developer Facilities  Cx Agent reports to owner/occupant  Other parties: Developer; A/E; Constructor  Cx approach  Cx covers from 90% design through post- occupancy “re-Cx” period (1 year of O&M)  Cx-A performs QA-audit oversight of construction & LEED certification docs  Excellent MEP contractors

Examples: ORNL 3 rd Private Developer Facilities  Cx Plan:  Integrated testing  System component verification against spec  Upset testing plan (emergency/failure mode)  Dynamic and flexible  Flood problem where Cx-A became critical integrator of problem correction  Cx report  Complete documentation of all tests, manuals, training and performance expectations

Examples: ORNL Russell Laboratory (Vivarium = “Mouse House”)  Cx requirement of Design Build Contract  Cx-A a former TAB contractor (1 st Cx project)  Cx Plan – 3 phases 1.Design review and installation verification 2.Operational & Functional testing/training 3.Interoperability testing (failure modes)/training  Cx Report – complete documentation  Success key – Owner principal engineer

Examples: ORNL JICS/ORCAS (State of Tennessee Funded Facilities)  Cx-A contracted with ORNL (Landlord)  Other parties: TN; A/E(2); Builder  Cx Tasks 1.Design reviews 2.Systems/components verification 3.Specific operations/functions testing 4.Start-up and warranty validation (10 months) 5.Training and documentation

Examples: ORNL JICS/ORCAS (State of Tennessee Funded Facilities)  Cx-A Deliverables 1.Design comments 2.Cx plan per phase of work 3.Cx construction contract specification 4.Testing documentation 5.O&M manuals 6.Warranty period reports/testing/verification 7.Final Cx report

Examples: ORNL Research Support Center (RSC)  Cx-Agent is internal ORNL staff  A/E tasked with Cx-plan development  Subcontracted to Cx- Specialty firm  Identified systems to be Cx-ed  Identified roles/responsibilities of Cx Team  Cx-Team  PM, Construction Field Representative (CFR), Design Disciplines, Constructor  Cx-PM has lead role as Cx-Agent

Examples: ORNL Research Support Center (RSC)  Process  System readiness checklist completed by constructor prior to validation testing  Verification testing performed by constructor or manufacturer  Testing witnessed by CFR  All checklists and testing results documented in Cx report  System training performed after testing (video- taped)  Cx-report filed with LEED certification package

Examples: Nuclear Facility ORR Applicability  DOE-O-425.1C delineates minimum “core requirements” for operational readiness  Cx provides a systematic approach to addressing the “CRs” from design through construction up to the ORR/A  Approach:  Ensure Cx planning requirements include ORR/A CRs (i.e. Cx-A contract)  Make ORR/A CRs part of Cx plan  Build the ORR/A documentation record as the project progresses  Benefits  Avoids 3-6 month assembly of “proof” documentation  Strengthens the O&M aspects of the process  Acquaints staff with ORR/A requirements

Conclusions on Cx …  A growing expectation of facility delivery and management process  Integrated across the planning, engineering design, construction and operational disciplines  Adds cost to initial delivery of facilities but results in reduced operational and maintenance costs  Requires advanced planning  Can be tailored to project budget and can be delivered in various ways  Supports other requirements such as LEED certification and ORRs