MBC PRESENTATION DEPARTMENT OF PUBLIC UTILITIES September 14, 2012.

Slides:



Advertisements
Similar presentations
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
1 Water System Improvements Upcoming Construction for Drinking Water Capital Projects by Jodye Russell.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
The City of North Bend Sanitary Sewer System
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Company Profile. EMPIRE SOLUTIONS EXPERIENCE With more than 10 years of experience dedicated to the roofing, energy conservation, corrosion control, painting.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Lakes Creek Road Waste Transfer Station Construction highlights.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
1 Public Hearing User Rate Adjustments April 8, 2008.
Smoke Testing Information
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Public Information Meeting Wastewater Treatment January 26, 2016.
Great Lakes Water Authority Update & Flint Water Crisis January 25, 2016.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
LFUCG Group 1 Remedial Measures Plans September, 2011 Presentation to Lexington-Fayette Urban County Residents.
Public Works Capital Projects FY Projects Completed FY 2014.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
City of Woburn – City Council Committee on Water Update on Water and Sewer System Improvements Projects City Council ChambersJune 1, :00 pm City.
1958  Construction began on a new fire hall, adjacent to property known as Fireman’s Park.  The City entered into a contract to construct a firehouse.
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
ACEC Presentation September 22, 2016
OBOA 2015 ANNUAL MEETING & TRAINING SESSIONS
Deferred Maintenance Deferred Maintenance
January February March 1st Quarter April May June 2nd Quarter July
Redevelopment Projects & Contracting Opportunities
107th & 110th Avenue North Public Utilities Renewal Projects
Fiscal Year 2017 Final Budget Workshop
ACEC Presentation September 22, 2016
Water Department has Six Divisions
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Pine cove pit time lapse drone photos
City of Valdosta Utilities Department.
Mount Vernon Community School
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
It Takes Two: Office and Field, Working Together
Mount Vernon Community School
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
2015 January February March April May June July August September
Presentation transcript:

MBC PRESENTATION DEPARTMENT OF PUBLIC UTILITIES September 14, 2012

Public Utilities’ Mission To provide public water supply, including water for fire protection, and public sanitary sewer collection services to the residents who live in the urban areas of Virginia Beach

Our Location Our main office is located at: 2405 Courthouse Drive, Bldg 2, Rm 200 Virginia Beach, VA Phone

Capital Improvement Program Quality Physical Environment Aging infrastructure –Renewal, repair and replacement –Consent Order – “Find and Fix” Short and long-term water supply needs Utility/agency project coordination Specialty work

FY2013 Projected CIP Work Our work will be shown by FY quarters The work includes: –Professional Engineering –Services –Construction

FY st Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Arrowhead/Susquehana SS Rehab Ph I Rehab 20,000lf gravity SS, MHs and services Dewatering, pipe lining, manhole rehab, concrete, paving, gravity SS pipe construction $4,000,000 November 2013 Josh Holt

FY st Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Quick Connects Install Manual Transfer Switches and generator receptacles Electrical $250,000 April 2013 Karen Possage

FY st Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Arc Flash Study Arc Flash study of 250 SPSs Professional engineering with arc flash remediation expertise $2,000,000 (5 yr ASC) November 2016 Mark Jones

FY st Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact ASCC #11 Annual Services Construction Dewatering, deep pipe rehab/replacement for SS, manhole, water main rehab/repl $6,000,000 (3yr ASC) November 2015 Don Piron

FY st Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact ASCC #12 Annual Services Construction Dewatering, deep pipe rehab/replacement for SS, manhole, water main rehab/repl $6,000,000 (3yr ASC) November 2015 Don Piron

FY st Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact CCTV Services Perform SS CCTV PACP certified, Neztek and Hansen compliant data, SS pipe cleaning $1,000,000 (5yr ASC) November 2017 Edwin Garcia-Cardona

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Inflow/Infiltration Abatement Perform field work for I/I abatement Smoke testing, CCTV, dye testing, night flow isolations $2,500,000 (5yr ASC) November 2017 Steve Motley

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Flow Monitoring Install and maintain temporary flow meters and rain gages Flow metering, rain gages $3,000,000 (5yr ASC) November 2017 Steve Motley

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Quick Connects Install Manual transfer switches and generator receptacles at 10 SPSs Electrical $280,000 March 2013 Chris Johnson

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Landstown Yard Sheds Rehab/replacement of Bldg 1855 Concrete, rebar, structural steel, electrical, roofing, coatings $168,000 May 2013 Edwin Garcia-Cardona

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Wet Well Rehab Rehab concrete SPS wet well Concrete re-surfacing, coatings, site work $3,000,000 (3yr ASC) December 2015 Karen Phan

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Electrical ASC Perform electrical upgrades for Arc Flash compliance and update work Electrical $3,000,000 (3yr ASC) December 2015 Mark Jones

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Eureka Park PS253 SPS replacement Dewatering, sheet piling, concrete, electrical, carpentry, roofing, mechanical, HVAC, masonry, bypass pumping $1,000,000 January 2014 Josh Holt

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Quick Connects Install Manual transfer switches and generator receptacles at 10 SPSs Electrical $320,000 June 2013 Algen Canonizado

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Quick Connects Install Manual transfer switches and generator receptacles Electrical $350,000 June 2013 DeWayne Craddock

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Wet Well Rehab Rehab concrete SPS wet well Concrete re-surfacing, coatings, site work $3,000,000 (3 yr ASC) January 2016 Karen Phan

FY nd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact SS Rehab Prioritization Provide software for SS rehab prioritization Legacy data conversion and data support $500,000 February 2015 Mark Jones

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Nimmo Water Tank Composite elevated tank w/1,600lf of WM Composite water tank construction, pile driving, concrete, pipe, HVAC, site work, paving $4,500,000 September 2014 Belinda Wilson

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Haygood Halls PS334 SPS replacement Dewatering, sheet piling, concrete, electrical, carpentry, roofing, mechanical, HVAC, masonry, bypass pumping, pipe $860,000 April 2014 Chris Johnson

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Consent Order Program Management Manage engineering services to support CO Similar professional engineering experience $7,500,000 (5 yr ASC) April 2017 Steve Motley

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Water and Sewer Appurtenances Adjust water valve boxes and SS cleanouts and MHs to grade Utility construction, concrete, paving $20,000 July 2013 DeWayne Craddock

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Laurel Cove PS217 & Wellington Woods PS258 SPS rehab Roofing, mechanical, pipe, concrete re- surfacing, coatings, bypass pumping $960,000 May 2014 Becky Mitchell

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Aerial Crossing Rehab Repair/rehab W and SS aerial crossings Pile driving, pipe supports, pipe installation, coatings, bank stabilization, fencing, clearing $900,000 June 2014 Chris Johnson

FY rd Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Burton Station SPS New SPS Dewatering, sheet piling, deep excavation, concrete, electrical, carpentry, roofing, mechanical, HVAC, masonry $1,370,000 June 2014 Belinda Wilson

FY th Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Diamond Springs PS314 SPS rehab Dewatering, sheet piling, deep excavation, force main, concrete, electrical, carpentry, roofing, HVAC, mechanical, masonry, bypass pumping $1,300,000 January 2015 DeWayne Craddock

FY th Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Pine Tree PS252 Pump station and gravity sewer replacement Dewatering, sheet piling, deep excavation, concrete, electrical, carpentry, masonry, HVAC $1,300,000 July 2014 Marcy Garnett

FY th Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact RTU/PLC Replacement Remove and replace controllers at 405 SSPs and 12 WPSs Electrical, remote telemetry, programmable logic control $9,000,000 July 2016 Josh Holt

FY th Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Quick Connect Install Manual Transfer Switches at 10 SPSs Electrical $350,000 December 2013 Karen Possage

FY th Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Royal Palm Arch PS243 SPS rehab Pump replacement, pipe work, concrete, coating, HFAC, electrical, generator $280,000 January 2014 Becky Mitchell

FY th Quarter Project Name Scope of Work Special Skills Needed Estimated Contract Value Contract Completion Contact Broad Bay PS272 SPS rehab Pump replacement, pipe work, HVAC, electrical, generator $145,000 January 2014 Becky Mitchell

AD 6.09 Initiatives – Done Contracts require minority business plans Work with Purchasing to ID contractors and vendors IFBs posted A/E RFPs posted “Debundle” work Include at least one MBE firm in all solicitations Participate in the MBC Expo

AD 6.09 Initiatives – In the Pipeline Find contractors and vendors Assist Purchasing in contractor training “Debundle” work…wetwell concrete resurfacing and pump station electrical Advertise for annual services construction Continue participation in MBC Expo

Success Areas Small purchases (<$3k) ID vendors Debundled –Wet well cleaning –Wet Well Rehab –HVAC –Appurtenances adjustments

Problem Areas Firms not familiar with City processes –AE selection –Construction IFB Value of normal IFB work Specialty work

What Can You Do? Help us identify contractors and vendors Encourage them to compete for City work

QUESTIONS?