Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Putting Houses on the Path to Lower Energy Consumption. Awareness and Long term planning helps to maximize energy opportunities.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Supplier Development Kaizen Implementation Kit
INDUSTRIAL & SYSTEMS ENGINEERING
Habitat For Humanity. HFH Members Architectural Team Bill Cox Donnie Austin Jeff Patterson Bill Wiegman Web Information Team John Peugeot David Koenig.
Cellular Manufacturing and Plant Layout
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
BA 351 Managing Organizations Operations Management 1.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Quality Function Deployment
Building Green Lesson 1 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Simple Process Mapping Techniques
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
F-1 Applying Lean to Factory Homebuilding Dr. Mike Mullens, PE.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Roof and Ceiling Framing
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13 Area Allocation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand the concept.
…….Another Man’s Treasure Vance Drive Apartments Transitional Housing.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler.
Estimating Project Times and Costs
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
HOME Copyright EASE Inc Tutorials© The “5S” Philosophy An EASEworks® Manufacturing Tutorial START Ver 6.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Buffington Homes Homebuilding 101. Homebuilding 101 Topics About Buffington Homes. Our Customer Touch Points. Construction Process. Warranty Process.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Fall CS-EE 480 Lillevik 480f06-l1 University of Portland School of Engineering Senior Design Lecture 1 Introductions Course objectives What is design?
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 25 Managerial Accounting Concepts and Principles.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
Factory Building Symposium on Lean Production
OBJ: SWBAT create a CAD Rendering of a Utility shed.
Quality Function Deployment
Major Steps In Building a SFR
Aggregate Planning Chapter 13.
Cost Accounting and Reporting Systems
Pull Manufacturing and Just In Time
The University of Jordan Mechatronics Engineering Department
A MODEST PROPOSAL TO DISRUPT THE WAY BUILDINGS ARE BUILT
Warm-up 9/19/16 What template are we using?
What is a 203K Loan? An FHA Rehabilitation Mortgage (Average 203K rehab is $7,500) First Lien Position Owner Occupied Assumable.
Operations Management
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
Using Sketchup for Home Contracting
Common Components of a Traditional Wood Framed Building
Ltd. “RV BLOKS” IDEA DESCRIPTION.
New White Lake Township Library
Minuteman Vocational Technical Regional High School Progress
Capacity Planning For Products and Services
© OnCourse Learning.
Presentation transcript:

Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas

Four Seasons Housing, Inc. Middlebury, IN Austin Baidas, CEO and President Level the Load

Four Seasons Housing  Started:1994  Location:Middlebury, IN  Home type(s):Primarily HUD Code  Price point:Moderate  Design:Limited customization  Production:10 floors/day  Market area:Northern US

Objective: Balance the Line  Eliminate non-value added (NVA) activity  Reduce cycle time variability › Station to station › Floor to floor

Strategy 1.Map product flow 2.Analyze data to identify causes of cycle time variability 3.Implement solutions that reduce NVA and control cycle time variability

Sources of Variation  Double vs. single floor stations  Variation in complexity from A to B half Tactic: Convert single floor stations to double floor stations

Then Raw Material Roof Ass’y Raw Material Mud Pit Raw Material Side Wall Jig End Wall Plumb & Tile Mud Pit Raw Material 5 Interior Walls 1A Frame 1B Post-Frame 2B Pre-Floor 2A HVAC, H 2 O, DWV 2C Decking3 Plumb, Util., Floor4 Cabinet Set 6 End, Side, Drywall & Electrical 7 Side, Drywall, Elec. 8 Marriage, Drywall & Electrical 9 Roof Set, Drywall & Electrical 10 Rough Roof, Exterior & Interior 11 Shingle, Siding & Interior 12 Sofit & Fascia 13 Mud, Dry, Prep Paint, Dry, Finish Heater Cabinet Shop Interior Walls Cabinet Tops Upper Cabinet Cabinet Shop Plumb & Tile HVAC Mezzanine

Now Interior Walls Cabinet Tops Upper Cabinet Raw Material Roof Ass’y Raw Material Mud Pit Side Wall Jig End Wall Mud Pit HVAC Mezzanine Cabinet Shop Plumb & Tile HVAC Mezzanine 2B Decking 3 Plumb, Util., Tile5 Interior Walls 6 End, Side, Drywall & Electrical 7 Side, Drywall, Elec. 8 Marriage, Drywall & Electrical 9 Roof Set, Drywall & Electrical 10 Rough Roof, Exterior & Interior 11 Shingle, Siding & Interior 12 Sofit & Fascia Paint, Dry, Finish 13 Mud, Dry, Prep Paint, Dry, Finish 13 Mud, Dry, PrepPaint, Dry, Finish 2A Floor Box Heater Raw Material 4 Cab. & Utility Set Buffer 2A Electrical 13 Mud, Dry, Prep

Future Raw Material HVAC Mezzanine Raw Material Roof Ass’y Mud Pit Raw Material Side Wall Jig End Wall 3 Decking Heater 8 Marriage, Drywall & Electrical 9 Roof Set, Drywall & Electrical 11 Shingle, Siding & Interior 12 Sofit & Fascia Paint, Dry, Finish 13 Mud, Dry, PrepPaint, Dry, Finish 13 Mud, Dry, Prep 2 Floor Box 4 Plumb Interior Walls Cabinet Tops Upper Cabinet Lower Cabinet Utility Prep. Plumb 6 Interior Wall Set 7 End, Side & Mate Wall 5 Cabinet Set, Tile & Utility Set 10 Rough Roof, Exterior & Interior

Results  Reduced through-put time 27%  All production within facility  Eliminated NVA protection for outside floors  Eliminated NVA moves  Identified real-time data collection requirements  Started a kaizen project list

Highlights  Lean initiative driven by business objective  Established lean process  Identified root cause  Listened to the data  Workers contributed mightily

Lessons  Lean cannot be forced by one person  Involve employees  Allow team to own the decisions  Lean is a process

Going Forward  Refine our lean process  Conduct kaizen events to improve efficiency in departments  Revise plant layout to convert to double floor stations

Lean Symposium

Manufactured Housing Research Alliance Jordan Dentz (212) x13 Factory Building Symposium on Lean Production