MEP/CIC Jan. 12, 2001 NASA’s STEP for Aerospace Workshop Using STEP for Engineering, Fabrication and Construction of Industrial Facilities Mark Palmer.

Slides:



Advertisements
Similar presentations
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Advertisements

Models. The Future of Building Services Model Content.
Warship 2010 The Application of Integrated Computing Technology to the Design, Construction and Lifecycle Support of Warships The Royal Institution of.
ASME Nuclear Conformity Assessment
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
ENTERPRISE SOFTWARE.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
1 M&S Teachers Seminar: Project Management Presented by: Paul E. Paquette September 26, 2013.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
Boeing STEP Manufacturing Program NASA’s STEP for Aerospace Workshop King G. Yee January 18, 2001.
3rd Annual Energistics Standards Summit Standards – Benefits across Industries Michael Strathman Aspen Technology, Inc 23 October 2008.
Construction Category Management Planning Version 1.1 (May 2015)
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
Goal: Understand the stages in design process and the role of computer aided design. Objectives: After this chapter, you should understand the following.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
1 Implementing ISO and iRING at Bechtel The Power of Collaboration Digital Plant 2010 Houston March 1-3, 2010 Robin Benjamins.
Industrial Engineering Roles In Industry
Standard way of sharing product data for nuclear power plants in Korea April 11th, 2005 Soonhung Han Plant Engineering Life Cycle Conference.
Achieving Interoperability for Equipment Supply Chains Mark Palmer FIATECH AEX Project Leader National Institute of Standards and Technology.
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
Tom MAZOUR IAEA, Division of Nuclear Power
Environmental auditing
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
STEP-TAS and its Benefits to Thermal Engineering STEP for Aerospace Workshop January 18, 2001 Georg Siebes.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
Manufacturing Plant maintenance Materials management Quality management.
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
UNIKL TRAINNING MODEL MODULE CONTENT 1- INTRODUCTION MODULE2 DAYS 2- PROCESS PIPING DESIGN & LAYOUT 7 DAYS 1- Piping Component 2- Equipment Datasheet 3-
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
R NASA STEP for Aerospace Workshop at Jet Propulsion Laboratory January 27, 2000 Thomas Thurman Rockwell Collins Inc. PDES Inc. Electro-mechanical Pilot.
From Camelot to Avalon - the knights of ISO make progress R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y ids-adi.org.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
Application of the ISO for BIM Xenia Fiorentini, Engisis.
Click to edit Master title style Planning and Designing a Lean Manufacturing Facility.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Computer Integrated Manufacturing Department of Industrial & Systems Engineering.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
Automated Hanger Drawings Based on CAESAR II Results
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
eSPL Innovative Management Technology
What is Rowdy Exchange? The Rowdy Exchange is an intuitive and comprehensive online shopping tool that connects directly to the UTShare/PeopleSoft purchasing.
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Integrated Management System and Certification
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
AP 231: Process Design and Process Specifications of Major Equipment
Fundamentals of PROCESS PLANT PIPING DESIGN
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Traceability of Gas Pipeline Materials Research & Materials Manager
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
From PDS to SP3D From PDS to SP3D
Electrical wiring harness interoperability: functionalities of AP242 ed2; preparation of the STEP 'electrical' Implementer Forum By Sophie Hérail (CIMPA.
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Lifecycle Data Management An EPC&M Perspective
Lecture 10 PROCUREMENT Ferdinand FASSA.
Presentation transcript:

MEP/CIC Jan. 12, 2001 NASA’s STEP for Aerospace Workshop Using STEP for Engineering, Fabrication and Construction of Industrial Facilities Mark Palmer Computer Integrated Construction Group National Institute of Standards and Technology January 17, 2001

MEP/CIC Jan. 12, 2001 Agenda u Why develop information standards for the process plant industries? u STEP APs for process plant u Industry use of AP 227 u Extending AP 227 capabilities for other industries

MEP/CIC Jan. 12, 2001 Stakeholders in the Process Plant Industries u Process Industries includes: chemical, gas processing, petrochemical, petroleum, pharmaceutical, power generation food &beverage, pulp & paper, water & water processing u Process Plant Industries include: owners/operators of process plants engineering, procurement, and construction (EPC) companies equipment and component suppliers information technology suppliers

MEP/CIC Jan. 12, 2001 Process Plant Data Cycle Business Opportunities (R&D) Major Interfaces Its a Recycle Process ! Equipment Vendors Construction Subcontractors Maintenance Contractors Production Design Pre-Project Planning Construction Plant Operations & Maintenance

MEP/CIC Jan. 12, 2001 Need for Information Exchange Standards u Industry faces heterogeneous CAD/CAE environment -- in constant state of flux u Process plant typical life years u CAE/CAD technology cycle 5-10 years u Technical information is reused over the life of the project, process, and plant u Large savings possible when engineering, procurement, construction, and operation can use diverse CAE/CAD and ERP systems u Standards enable these savings

MEP/CIC Jan. 12, 2001 What is a STEP Application Protocol? u AP: defines the usage of STEP for a defined application context driven by industry information requirements – uses activity modeling, usage scenarios, and information modeling specifies conformance requirements for testing implementations u Enables reliable information exchange

Process Plant Industries Information Flows Produce Conceptual Process Design Demolish Plant and Restore Site Procure and Control Equipment, Material and Services Produce Detailed Process Design Commission Plant Operate Plant Produce Conceptual Engineering Design (Front End) Suppliers and Fabricators Produce Detailed Engineering Design Maintain Plant and Equipment Construct Plant Pre-commission Decommission Plant Produce and Maintain Financial Case Regulatory Bodies Control Project Management Activities Obtain Agreement with Regulatory Bodies

MEP/CIC Jan. 12, 2001 Information Standards for the Process Plant Industries u Industry leaders exploiting IT and data exchange to improve project and plant performance hindered by lack of effective exchange standards for process models, P&IDs, 3D plant models and life cycle information u Move to international standards and broader industry collaboration PIEBASE - global coordination among industry consortia: ECOM, EPISTLE, pdXi, PISTEP, PlantEC, PlantSTEP, POSC, POSC/CAESAR, USPI-NL,… u Segments of the process plant industries are defining standards for sharing information STEP application protocols and data warehouse capabilities

MEP/CIC Jan. 12, 2001 APs for the Process Plant Industries u AP 212, Electrotechnical Design and Installation u AP 221, Functional Data and their Schematic Representation for Process Plant u AP 227, Plant Spatial Configuration u AP 231, Process Design and Process Specifications of Major Equipment (cancelled)

MEP/CIC Jan. 12, 2001 AP Plant Spatial Configuration u Scope: 3D plant design emphasis on spatial layout and piping design includes physical and functional characteristics developed by PlantSTEP and NIST u Status: International Standard (IS) sent to ISO Delivery of commercial implementations: – Dassault / IBM - CCPlant: IS implementation – Bentley - PlantSpace (MicroStation): 2001 – Cadcentre - PDMS: in development – Intergraph - participating in ESTEP AP 227 project – STEP Tools - AP 227 viewer Merck requirement for CAD/CAE systems and pilot project – AP 227 requirement for plant CAD/CAE purchases Navy requirement for delivery of piping systems data NASA requirement for plant CAD/CAE purchases

AP Plant Design AP 227 Scope of AP Plant Spatial Configuration Produce Conceptual Process Design Demolish Plant and Restore Site Procure and Control Equipment, Material and Services Produce Detailed Process Design Commission Plant Operate Plant Produce Conceptual Engineering Design (Front End) Suppliers and Fabricators Produce Detailed Engineering Design Maintain Plant and Equipment Construct Plant Pre-commission Decommission Plant Produce and Maintain Financial Case Regulatory Bodies Control Project Management Activities Obtain Agreement with Regulatory Bodies Limited capabilities provided for constructing and maintaining plant.Note:

MEP/CIC Jan. 12, 2001 Usage Scenarios for AP 227 Edition 1 u Exchange of piping components and equipment designs u Exchange of piping assemblies and systems spatial layout, with references to catalogs u Exchange of interference analysis results u Exchange of changes to piping systems and plant layout u Exchange of piping installation information u Exchange of modules of plant designs u Exchange of as built plant configurations

MEP/CIC Jan. 12, 2001 AP 227 Demonstration Example

Example AP 227 file

MEP/CIC Jan. 12, 2001 Broader Industry Adoption of AP 227 u After successes in process plant, U.S. Navy and shipbuilding companies adopted AP 227 assessed AP 227 and determined sufficient foundation funding a Ship Piping Guide for AP 227 u U.S. MARITECH Shipbuilding Program ESTEP project is working on AP 227 edition 2 add more information for HVAC, pipe flow analysis, hanger and support details, catalog referencing, PMI u More commercial implementations in 2001 u Other companies are making AP 227 a requirement for CAD/CAE system purchases and a tool for improving project delivery and information re-use

MEP/CIC Jan. 12, 2001 Extending AP 227 for Greater Benefits u Edition 2 project to extend AP 227 capabilities process plant, piping fabricators and shipbuilding u Piping shop fabrication and inspection u Piping installation u HVAC design and installation u Input for pipe and HVAC flow / stress analyses u Support and hanger details u Cableway spatial design and installation u Positive material identification u Ship unique information

AP 227 ed1 - Plant Design AP 227 ed2 Scope of AP Extensions for 2nd Edition Produce Conceptual Process Design Demolish Plant and Restore Site Procure and Control Equipment, Material and Services Produce Detailed Process Design Commission Plant Operate Plant Produce Conceptual Engineering Design (Front End) Suppliers and Fabricators Produce Detailed Engineering Design Maintain Plant and Equipment Construct Plant Pre-commission Decommission Plant Produce and Maintain Financial Case Regulatory Bodies Control Project Management Activities Obtain Agreement with Regulatory Bodies AP 227 ed2 - piping / equipment fabrication

Current Pipe Fabrication Process - Drawing based, data re-entry, minimal CNC, paper trail for inspection, testing & delivery Isometric/Spool Drawing Systems Isometrics and Spool Drawings s t Pipe Fabricator Construction Site Pipe Spools 3D CADD System s t

Cut Piping Prepare Fabrication Piping Fabricate Piping Inspect Fabricated Piping Ship Fabricated Piping Edge Preparation Bend Piping Primary Weld Secondary Weld Activities – Piping Fabrication Phase

Future Pipe Delivery Work Process: Reduced need for drawings, reuse of 3D model, improved CNC, inspection,delivery, installation Pipe Fabricator Construction Site Pipe Spools Piping spool, weld and inspection data STEP AP 227 Files s t 3D CADD System s t Isometric and Spool Drawing Systems 3D model with spool and weld data or

MEP/CIC Jan. 12, 2001 Conformance Classes for AP 227 ed2 Include in ed1 and ed2 u CC1: piping system functional information u CC2: equipment and piping spatial information u CC3: plant spatial configuration information u CC4: piping fabrication information Additions to ed2 u CC5: piping inspection information u CC6: HVAC system functional information u CC7: HVAC spatial configuration information u CC8: cableway spatial configuration information u CC9: HVAC and piping flow analysis input

MEP/CIC Jan. 12, 2001 Summary u AP 227 is a proven solution for improving the design and construction of process plants u Other industries are adopting AP 227 u Industry and NIST are working on extending the capabilities of AP 227 u Time for broader adoption by industry process plant, industrial facilities, shipbuilding, aerospace facilities u Requires: Industry demand for AP 227 interfaces with CAD/CAE, CAM and CIC systems – Industry requirement for purchases of CAx systems