DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC Permit and Code Compliance Market Assessment - MAPC 1.

Slides:



Advertisements
Similar presentations
© 2005, Itron Inc. Residential Market Share Tracking Study Rachel Harcharik Itron, Inc Richard Pulliam, Project Manager Southern California Edison.
Advertisements

Over 50 Years of Regional Service and World-Class Quality United Air Conditioning is a client-focused, family-owned air conditioning company serving.
Green Building Ordinance Transportation and Environment Committee
HVAC Research Roadmap Summary.
Lighting EMV Roadmap Update Jeorge Tagnipes California Public Utilities Commission March 25, 2014.
CPUC EM&V WO54 – Market Assessment & Market Effects Baseline Characterization Market Effects Study of Investor-Owned Utility Residential.
A Research Institute of the University of Central Florida FBC Mechanical Technical Advisory Committee Teleconference Meeting February 25, 2015 Investigation.
1 Commercial Market Share Tracking Study and Findings April 2014.
1 WO 13: California Residential Replacement Lamp Market Status Report Energy Division California Public Utilities Commission August 4, 2014.
Statewide Measure Cost Update Overview & Discussion.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
DNV GL © SAFER, SMARTER, GREENER DNV GL © ENERGY Industrial, Agricultural and LARGE Commercial- 4(IALC4) 1 PY2013 NRNC WHOLE BUILDING IMPACT EVALUATION.
Rachel Weaver Program Manager Maryland Energy Administration
Overview of the 2009 LIEE Impact Evaluation Workshop 1: “Overview of Lessons Learned” October 17, 2011.
INDUSTRIAL, AGRICULTURAL AND LARGE COMMERCIAL (IALC) ROADMAP CUSTOM IMPACT EVALUATION WEBINAR TO PRESENT RESEARCH PLAN Presentation July 28, 2014.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
PMP® Exam Preparation Course
California VSP’s. Green it Forward™ Streamlined Online HVAC Permitting Program For Cities & Counties of California April, 2015 Enalasys Corporation.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Policy: Zero Net Energy Homes in 2020 Martha Brook, P.E. High Performance Buildings.
1 EE Evaluation Report on 2009 Bridge Funding Period California Public Utilities Commission November 22, 2010 Energy Division Energy Efficiency Evaluation.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
DNV GL © 2013 Confidential April 10, 2014 SAFER, SMARTER, GREENER DNV GL © 2013 Confidential September 8, 2014 Jarred Metoyer ENERGY HVAC Permit Study.
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
Residential Sector Market Studies Planning Tool Output of Market Studies Needs Assessment ( study) July 29, 2014 webinar Opinion Dynamics, for California.
February 9, 2010 Prescriptive Whole House Retrofit Program Webinar.
– 2011 STUDIES & PILOTS Low Income Oversight Board Meeting San Diego, CA Energy Division June 2, 2010.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
SDG&E ® Multi-Family Proposed Whole Building Performance Assessment Don Wiggins Residential Programs Manager San Diego Gas & Electric ® May 11, 2011.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Quality Assurance Programme of the Canadian Census of Population Expert Group Meeting on Population and Housing Censuses Geneva July 7-9, 2010.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application Presentation to the Low Income Oversight Board November.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
New Construction Studies Performed by: MAESTRO/CALMAC Evaluation Showcase ● Pacific Energy Center ● July 26-27, 2006 EM&V of the Statewide Savings By Design.
Electric / Gas / Water Summary of White Paper Findings CPUC SWH Workshop August 26, 2008.
CSS/CMST WEBSITE Priya Sathe October 20, AGENDA »Overview of CPUC CSS/CMST Study »Overview of the Lighting Analysis »Overview of Data Gathered.
2015 INDUSTRIAL, AGRICULTURAL AND LARGE COMMERCIAL (IALC) ROADMAP PUBLIC EVALUATION WEBINAR Presentation November 18, 2015 Kay Hardy, Kris Bradley.
DNV GL © 2013 SAFER, SMARTER, GREENER DNV GL © 2013 California Lighting Data – Residential 1 Jenna Canseco, DNV GL October 20, 2015 Lighting Action Plan.
Incremental Cost Assessments & Duct Sealing Optimization Project Bobbi Wilhelm March 25, 2008.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: Rafael Friedmann, PG&E Kris Bradley & Christie Torok, Quantum Consulting 2003 Statewide.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Evaluation Plans for Energy Efficiency Programs Outline for California Measurement Advisory Council February 21, 2007.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: John Cavalli, Itron Beatrice Mayo, PG&E July 27, Express Efficiency Program.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
This program is funded by California utility customers under the auspices of the California Public Utilities Commission and in support of the California.
Regional Air Source Heat Pump Performance and Savings Research and Evaluation Project Proposed Scope of Work and Estimated Budget February 10, 2004.
Click to edit Master title style 1 Energy Savings Assistance Program And California Alternate Rates for Energy (CARE) Program Proposed Decision.
Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.
Heat Pump Program Evaluation Baseline Practice and Conditions.
DNV GL © 2016 SAFER, SMARTER, GREENER DNV GL © 2016 HVAC 3 Quality Maintenance Program Year Impact Evaluation.
Component D: Activity D.3: Surveys Department EU Twinning Project.
1 Pepco and Delmarva Power Demand Side Management Programs Stakeholders Meeting February 20, 2009.
2015 Comprehensive LGP Process Evaluations Draft Research Plan with Common Scope of Work John Boroski and Tami Rasmussen, Evergreen Economics.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
 Effective July 1, 2005  USDA Interim Rule published June 15, 2005  Final rules to formalize food safety requirements published on August 8, 2008 form.
DNV GL © 2016 SAFER, SMARTER, GREENER DNV GL © 2016 HVAC 1 Upstream HVAC Program Year Impact Evaluation.
Western HVAC Performance Alliance (WHPA)
Analysis of 2008 Title 24 Nonresidential Compliance Site Audits
SCE “To-Code” Pilot Lessons Learned
Potomac Edison Preliminary Energy Efficiency and Conservation Programs
Western HVAC Performance Alliance (WHPA)
A Market That’s Not Cooling Anytime Soon
CPUC Rate Proceedings Relevant for TOU
Tool Lending Library Program evaluation
Presentation transcript:

DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC Permit and Code Compliance Market Assessment - MAPC 1

DNV GL © 2014 Presentation Outline  Study Objectives  Study Scope  High-level Research Questions  High-level Assessment Task Summary  RQ 1: Methods of Estimating the Permit Rate  RQ 2: How does Permitting Impact Compliance?  RQ 3: Evaluate Effectiveness of HERS Raters  RQ 4: Evaluate Comprehensiveness of HERS Registry Submittals  Overview of Residential Data Collection and Outcomes  Proposed Schedule  Memos and interim deliverables  Next Steps 2

DNV GL © 2014 Study Background and Purpose Study Background  Scoped as part of the Energy Efficiency EM&V Roadmap  Study under scope since early 2014  Received input from CPUC expert consultants, the IOUs, the CEC  Now seeking public comments Study Purpose  Provide more information to help tackle the problem of non-compliant HVAC changeouts  Help design IOU programs: incentives, training, outreach  Test methods and approaches to determine compliance rates for HVAC changeouts 3

DNV GL © 2014 Study Objectives Identify standard practices for California residential and nonresidential HVAC:  Compliance with building HVAC standards and permit requirements,  Attitudes and barriers to permitting and compliance,  Correlation between permitting and compliance with codes and standards, and  Effectiveness of Home Energy Rater (HERS) verification processes. 4

DNV GL © 2014 Study Scope Installations  The study will examine:  Projects under 2008 code that are  Entirely new or complete replacement space-conditioning systems or  Altered space-conditioning systems.  The study will not examine:  Projects under 2005 or 2013 code  High-rise buildings  New construction  Additions with HVAC changeouts  Buildings exempt from permit process Equipment Types (Not an exhaustive list)  Central heating and cooling systems (gas, electric, or propane)  Furnaces  Heat pumps  Single phase (residential) and three phase (commercial) packaged rooftop and split systems  Water-sourced heat pumps & evaporative cooled air conditioning 5

DNV GL © 2014 High-level Research Questions RQ 1: What percent of projects obtained required building permits and complied with building energy efficiency standards (Title 24, Part 6)? Method: Develop a top-down and bottom-up permit rate estimate RQ 2: How does compliance differ for permitted and non-permitted projects? Method: Evaluate recent HVAC changeouts for permitting through field inspections and through data previously collected in the field. RQ 3: What barriers exist for HERS raters? Examine barriers, awareness of code requirements and inspection processes. Identify training that could help raters to improve compliance with Title 24 HVAC requirements. Method: Surveys with experienced HERS raters. RQ 4: How compliant are HERS rater certified projects? Method: Evaluate HERS registry submittals. 6

DNV GL © 2014 High-level Assessment Task Summary  Determine residential permit & compliance rates (total 200 units/dwellings) with onsite field testing.  Conduct detailed performance testing and whole house data collection on a subsample (10 dwellings out of 200). – The whole house data collection could inform future case studies.  Nonresidential compliance includes an analysis-only method with the option of collecting field data.  Develop Bottom-up Permit Rate  Develop Top-down Permit Rate  Perform HERS Rater Surveys/Interviews  Evaluate HERS Registry Submittals 7

DNV GL © 2014 RQ 1: What is the Permit Rate? Estimate the HVAC Permit Rate Using Two Methods Top-down Permit Rate:  Estimate total number of permits issued for HVAC changeouts during a given time period.  Estimate total number of units sold during a given time period.  Several exclusions apply: nonresidential sales exempt from permit process, new construction projects. Data & Methods:  Potential sources currently considered:  AHRI National data, HARDI, past DOE reports  Building Depts. CIRB  Stock replacement model informed with saturation study data.  (Optional: Wholesale Distributor IDIs) 8

DNV GL © 2014 RQ 1: What is the Permit Rate? (Continued…) Estimate the HVAC Permit Rate Using Two Methods Bottom-Up Permit Rate  Identify a percentage of projects permitted.  Apply saturation study sample weights and extrapolate results back to the population.  Method is limited to IOU customers (SDG&E, SCE, PG&E, SCG). Data Sources  2009 Residential Saturation Study  2013 Commercial Market Share Tracking Study  If needed (general population) 9

DNV GL © 2014 RQ 2: How does Permitting Impact Compliance? General Approach: 1.Identify a sample of dwellings and nonresidential buildings with recent HVAC changeouts. 2.Collect/measure Title 24 mandatory and prescriptive requirements through field data or previously collected field data. 3.Evaluate compliance by Title-24 measures as compared to code (compliant, non-compliant). 4.Determine dwelling/nonresidential buildings’ permit status. 5.Compare differences in compliance by measure for permitted and non- permitted projects. 10

DNV GL © 2014 RQ 2: Compliance Bins: Permitted & Compliant Completes Permitting Process Meets Title 24 compliance requirements (duct leakage, air flow, sizing and refrigerant charge) Permitted, Not Compliant Completes Permitting Process (Signed off without meeting all compliance requirements) Does not meet Title 24 compliance requirements (over sized, leaky ducts, low refrigerant) Not Permitted, Compliant Does not pull permit (Does not pull permit but meets code requirements) Meets Title 24 requirements (duct leakage, air flow, sizing and refrigerant charge) Not Permitted, Not Complaint Does not pull permit (Does not pull permit meets code requirements) Does not meet Title 24 requirements (over /improper sizing, leaky ducts, refrigerant not fully charged) 11

DNV GL © 2014 RQ 3: Evaluate Effectiveness of HERS Raters  California Home Energy Rating System (HERS) program was initially implemented to address issues of poorly-performed construction and equipment installations in residential applications. Assumption: HERS raters provide quality-assurance services that verify correct HVAC installation and assure excellent HVAC performance. Study to examine: – How do outside influences from contractors, customers and building departments influence the service that raters provide? – How does price pressure from competing raters with unregulated fees impact service? – Do these influences degrade the quality of the service raters provide and if so how frequently does this occur? Assess reasons or barriers as to why HERS raters may not perform the work correctly or as thoroughly as necessary by identifying trends in the HERS registry data reviewed and surveys with HERS raters. 12

DNV GL © 2014 RQ 3 Continued... Evaluate Effectiveness of HERS Raters Task Interviews & Online Surveys:  Conduct interviews with HERS raters to explore systematic issues, identify problems that may be present in certain climate zones, building departments, hiring contractors, under the T24 code period, or by raters themselves.  Planned sample approximately 60 surveys (potentially more, depending upon access to addresses).  Researchers will request information from HERS registry to identify raters with frequent submittals.  Researchers will request participation in survey from raters serving various regions in the state. 13

DNV GL © 2014 RQ 4: Evaluate Comprehensiveness of HERS Registry Submittals Examining previous assumptions, the study will evaluate registry submittals to determine if HERS inspections on HVAC installations produce the intended outcome of a HERS-compliant residence by analyzing inputs from the HERS rater registry. Examples include:  Identify any trends associated with any particular climate zones, building departments, raters or contractors where verification activities are systematically not performed.  Assess the percentage of HERS raters that may only do a subset of the required verification activities.  Identify the frequency of rater-submitted test results that indicate a system did not pass or was out of compliance with Title 24 requirements.  Determine what percent were resubmitted with a passing rate and what percent were not. 14

DNV GL © 2014 Overview of Residential Data Collection and Outcomes Residential Site Visits for HVAC Changeouts Average Level of Statewide Compliance Building Department Data for the 200 Compliance Level for Permitted and Non-Permitted 200 Residential Site Visits for HVAC Changeouts CIRB Data and Total Changeout Market Size Total Number and Compliance Distribution of Permitted and Non-Permitted Building Department Data for the Residential Site Visits for HVAC Changeouts CIRB Data and Total Changeout Market Size Total Number and Compliance Distribution of Permitted (Started and Final Inspected) and Non-Permitted Building Department Data for the Residential Site Visits for HVAC Changeouts HERS Data

DNV GL © 2014 Proposed Schedule February Finalize research plan May Collect & Report Nonresidential Data for Memo August Phase1: Res. Compliance Testing and Permit Analysis Qty. 100 units November Phase2: Res. Compliance Testing and Permit Analysis Qty. 100 units November Phase3: Res. RCA Testing Weigh-in Method on Subsample January Develop Bottom-up Permit Rate January Develop Top-down Permit Rate October HERS Rater Interviews December Evaluate Efficacy of HERS Rater Submittals June 2016 Present and deliver final report 16

DNV GL © 2014 Memos and interim deliverables  Memo # 1 /April 2015  Proposed methodology for determining compliance and weighting of prescriptive measures (following stakeholder meeting).  Memo # 2 /May 2015  Results from analysis-only Nonres permit and compliance analysis  Memo # 3 /August 2015  Residential permit & compliance rate at 50% completion & assessment of the need for additional data.  Memo #4/October 2015  Define variables of interested in HERS registry described analysis methods. 17

DNV GL © 2014 Next Steps 18  Public comment period and release of final research plan  Comments instructions – Go to – Select the search tab and then select Portfolio Cycle and search text ‘HVAC6’ (no quotes). Click the search button and you will see the files for downloading. – Comments should be uploaded to the website by clicking “comment” on the plan by 5pm on February 11, – In order to post comments, you will need to register on the site with an id and password.

DNV GL © 2014 SAFER, SMARTER, GREENER 19 CPUC Manager Paula Gruendling, DNV GL Manager Amber Watkins DNV GL Sponsor Jarred Metoyer Thank You.