University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

BUILDING AIR CONDITIONING
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Jack Mc Gowan, CEM Optimize operating cost for cooling Improve Capital Projects Improve learning environments GHP Best Practices Geothermal Heating and.
Energy Sub-Metering for Measurement and Verification
Heating, Ventilating, and Air-Conditioning
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
1 Vapour compression cycle Refrigerator Air conditioning plant Heat pump (“ ENERGY MANAGEMENT HANDBOOK” Sixth Edition, Chapter 8)
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
International Newspaper Group 2008 Gannett’s Green Campaign.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
Lecture Objectives: Finish with software intro HVAC Systems
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
The Data Center Challenge
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Introduction to HVAC Optimization
HEATING AND COOLING SYSTEMS
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Uponor for Radiant Cooling Systems 102. Outline Fundamentals review FEA Analysis Case Studies Piping CCN Controls Web Link to Uponor DC Specifications.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
EXAMINATION 3 REVIEW FORMAT & AREAS COVERED DISTRIBUTION SYSTEMS DELIVERY DEVICES UNITARY SYSTEMS HEAT PUMPS SPACE REQUIREMENTS & DESIGN CONSIDERATIONS.
WSHP Systems 1.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Elliott Microturbines Absorption Chiller Integrated System Development
The Data Center Challenge
Lecture Objectives: Discuss Final Project
Objectives Talk about the final projects Discuss HW2 and HW3 problems
Energy Savings Projects
Grunenwald Science and Technology Building
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Answer questions related to HW 4
Energy Efficiency in District Coiling System
The Benefit of Including Energy Recovery System Analysis
FBE03: Building Construction & Science
Presentation transcript:

University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant October 13, 2014

OUTLINE AND LEARNING OBJECTIVES: Project scope Design criteria Design concepts and solutions Implementation lessons Performance

PROJECT OVERVIEW

PROJECT SITE

BUILDING LAYOUT

DESIGN CRITERIA Project is being built in two phases Phase 1 (2012 practice field) is heating only. Phase 2 (2014 operations building) requires heating and cooling. Desire to use campus utilities - chilled water and steam. Desire for quiet system operation.

DESIGN CRITERIA High bay space with a large volume to heat. Only about 10% of the volume is occupied. Tight site – need to optimize site use to maximize field area - reduce mechanical space. Chilled water was close and plentiful, but sufficient reliable steam was about $1 million away.

HVAC SYSTEM OPTIONS CONSIDERED 1)Campus chilled water and steam HEX with radiant floor heat for field. 2)Campus chilled water and water-to-water heat pumps with radiant floor heat for field. 3)Campus chilled water and water-to-water heat pumps with air rotation units for field. 4)Campus chilled water and natural gas boilers with radiant floor heat for field.

HVAC SYSTEM SELECTION Selected Design Solution – Option 2 Route chilled water mains to facility under Phase 1. Use campus chilled water return as heat sink for water to water heat pumps to create hot water for Phase 1 and Phase 2. Use in-floor radiant heat under turf field for practice facility heating. Use natural/displacement ventilation as primary means of summer conditioning. Supplement with an ERV and exhaust fans.

HVAC SYSTEM SELECTION Design Benefits Water to water heat pumps have a COP of 2.6 for heating, 4.6 for simultaneous heating/cooling. System produces chilled water as a byproduct which is sent back to campus mains or used in the Phase 2 facility. Chilled water produced is approximately 180 tons. Utility company rebate of $343,394. Heat pump system accounted for 57% of rebate. (Accounts for Phase 1 & 2)

ENERGY ANALYSIS Based on Phases 1 & 2 – Comparing to System 1 Annual energy cost savings of $33,855 (11%). Annual EUI reduction of 24% (54.5 kBtu/SF vs kBtu/SF). $1 million lower life cycle cost over 25 years.

PRACTICE FIELD PIPING AND ZONING

SYSTEM EQUIPMENT Water-to-Water Heat Pump Units

RADIANT FLOOR SYSTEM Manifold Design Details

RADIANT FLOOR SYSTEM Manifold Installation

RADIANT FLOOR SYSTEM In-Floor Tubing

RADIANT FLOOR SYSTEM Transition to Sub-Floor

RADIANT FLOOR SYSTEM Floor Tubing Arrangement

RADIANT FLOOR SYSTEM Sand Floor Base

NATURAL VENTILATION SYSTEM Air Intake and Relief Path

NATURAL VENTILATION SYSTEM Intake Louvers and Dampers

NATURAL VENTILATION SYSTEM Relief Air Path

HEATING SYSTEM FLOW DIAGRAM Heating with Chilled Water

HEATING SYSTEM DISCUSSION Implementation Challenges First system of this type on campus. Campus plant does not want chilled water over 42°F supplied. Heat pumps must control both chilled and heating water. Campus chilled water PLC interface and building DDC chilled water system needed to integrate to operate reliably and seamlessly. Separate controls though. What is the R-value of sport turf?

HEATING SYSTEM DISCUSSION Getting it Running– Lesson Learned At start up there should only be one evaporator valve open to allow flow proof for chiller start up. All other evaporator valves should be closed if their associated compressor is not operating. The PID loops for the evaporator control valves on the heat pump units needed to be sped up. They were responding far too slowly causing wide control swings and instability.

HEATING SYSTEM DISCUSSION Getting it Running– Lesson Learned Required manufacturer design staff to physically visit site to observe issues of chilled water control. The slow responding evaporator valves were main cause of instability. Chilled water system failures in other campus buildings can affect the heat pumps. Differential pressure set point for the chilled water pumps should be reset based on varying campus system return temperature.

HEATING SYSTEM DISCUSSION Getting it Running– Lesson Learned Chilled water pumps should be enabled to run for 60 seconds prior to enabling the heat pumps to stabilize flow. Building heating water loop bypass valve needs to be engaged to maintain system flow in the case of rapid heating load reduction. The PLC for the U of Iowa chilled water interface was limited in programming capability. Needed to find rudimentary ways to control the bypass valve.

SYSTEM PERFORMANCE REVIEW The heating water system has operated in the Indoor Practice Facility for two years. Specific knowledge of the system is needed to operate and trouble shoot when required. Energy consumption over the past 24 months to heat, ventilate, and light Phase 1 was …. 21 kBtu/SF/year

QUESTIONS? THANK YOU! Thank You! Lincoln Pearce KJWW Engineering David Hahn University of Iowa Chilled Water Plant