June – 6 th – 2012. Design Team Ras Wickramaratne Santiago Rodriguez John Slate Ghassan Mustafa Ali Alsahaf Support Team Client: Victoria Ertelt PSU Advisor:

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
Make the most of your energy Head Office – Case Study.
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
The York County School Division Geothermal Heating and Air Conditioning: Is it Worth the Cost?
Product Line Overview 1. No One Else KMC Controls is the only privately held manufacturer to provide a full line (pneumatic, analog electronic, & digital)
Objectives Finish with ducts and fans Define project topics.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
Energy Conserving Alternatives HVAC 15a CNST 305 Environmental Systems 1 Dr. Berryman.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
This document was specifically prepared to aid utility account managers who are working with C&I customers. Any other use of this material (in whole or.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
An intelligent VAV zoning system
1 as Air Conditioning Systems. 2 as Split Type Air-Cooled Suction Line Liquid Line Condensing Unit (CDU) : Fan Coil Unit (FCU) : MCW,MCX,MCD,MCC,MCV,TTH,TWE,TTV.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
POWER SAVING BY ROCKSOLID INDUSTRIAL SOLUTIONS SYSTEMS REQUIRING PUMPS USING VALVE CONTROL SYSTEMS REQUIRING FANS USING DAMPER CONTROL SAVE GOOD $MONEY$
OGZEB Hybrid Thermal Electrical Energy Storage System Fall 2013-Final Presentation Artur Nascimento1 Team members: Corey Allen, Anthony Cappetto, Lucas.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Rooftop Package HVAC Operations and Maintenance Measures: David Baylon Stan Price Bob Davis.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
OGZEB Hybrid Thermal Electrical Energy Storage System Midterm 2 Presentation 1 Team members: Corey Allen, Anthony Cappetto, Lucas Dos Santos, Kristian.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
AIR-COOLED SCREW CHILLER FAS Air-Cooled Screw Chiller – FAS-E (Low Noise)
N O R T H A M E R I C A C O M M E R C I A L TDP
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
INTRODUCTION. Function of Chillers Remove Cool Control Support.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
© March 2008Environmental Stress Systems1 What you need to know when choosing a cascade condensing unit for your unique application Specifying Cascade.
Control Theory Control System Objectives  Establish a final condition  Provide safe operation  Eliminate the human element  Assure economical operation.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Facilities Management and Design Chapter 7 HVAC Systems.
Grocery VSD Measure Deemed Savings Reid Hart, PE & Ken Anderson September 28, 2010.
Energy Plus & Open Studio Class
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTUG January 19, 2010.
Changes for 2016 Moving Forward! 2016 ECM Fan Box Bright Energy Solutions! LED High Bay! Chillers! Ready for 2016.
Fan Coil Controller FC/S 1.1
Sustainability Best Practices
ABB i-bus® EIB Electronic Switch Actuator, 4-fold
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Energy Efficiency in District Coiling System
Engineering Presentation
Senior Thesis Presentation
ENERGY SAVING Product Offering
Loop Water Controller Overview
Adding Zones to Existing Systems
Lecture Objectives: Discuss Projects 1 and 2
Mandatory Design Requirements
2018 Retro-Commissioning (RCx) Program
Presentation transcript:

June – 6 th – 2012

Design Team Ras Wickramaratne Santiago Rodriguez John Slate Ghassan Mustafa Ali Alsahaf Support Team Client: Victoria Ertelt PSU Advisor: Dr. David Sailor Design Advisor: Evan Waymire Industry Advisor: Ruwan Jayaweera

 Designed by modernist Finnish architect Alvar Aalto  Completed in 1970  46,000 sq ft., three-story  Collection of over 5000 rare books and antiquities  Under-performing HVAC system

Brainstorm & ResearchData collection Model Design Calculate Heating and Cooling Loads Model RefinementComponent selection Recommendations

Air-cooled Chiller

Central Cooling Coil (finned tube)

Zone Control DampersVariable Frequency Drive

Zone Control DampersVariable Frequency Drive

DDC (digital controls)

EUI= 144 kBtu/ft 2

COMPLETE NEW SYSTEM : 120 TON CHILLER CENTRAL COILING COIL ZONE CONTROL DAMPERS SUPPLY/ RETURN FAN VFD DDC CONTROLS ECONOMIZER REPAIR

COMPLETE NEW SYSTEM : 120 TON CHILLER CENTRAL COOLING COIL ZONE CONTROL DAMPERS SUPPLY/ RETURN FAN VFD DDC CONTROLS ECONOMIZER REPAIR PHASE I SYSTEM REPAIR: ECONOMIZER PNEUMATIC CONTROLS BALANCE MANUAL DAMPERS ADD INSULATION PHASE II HYBRID DDC CONTROLS: NEW DIGITAL HEADEND EPT SWITCHES ON ACTUATORS UTILIZE PNEUMATIC POWER PHASE III 120 TON CHILLER CENTRAL COOLING COIL ZONE CONTROL DAMPERS SUPPLY/ RETURN FAN VFD PHASE IV FULL DDC CONTROLS: REMOVE PNEUMATIC SYSTEM INSTALL ELECTRONIC ACTUATORS DCV CO2 SENSORS HUMIDISTATS IN WORST ZONES

Ali Alsahaf Ras Wickramaratne Santiago Rodriguez John Slate Ghassan Mustafa