Global Design Effort - CFS 04-18-09 TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.

Slides:



Advertisements
Similar presentations
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Advertisements

Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
E Huedem, Nov ILC VALUE ENGINEERING SESSION of POWER & COOLING (Focus on Main Shaft 7) November 27, 2007 INFORMATION PHASE Conventional.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
ILC Energy Efficiency Marc Ross and Ewan Paterson, SLAC CFS-ADI Joint Meeting ICEPP University of Tokyo 9 April 2014 Three examples: 1) higher quality.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Process Water VE Updates (Main Linac Only) Emil Huedem FNAL ILC Meeting - CHICAGO Nov E. Huedem 2008.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E Huedem, June RDR PROCESS WATER & VALUE ENGINEERING ITEMS June 5, 2008 GDE Meeting-ILC CFS Workshop in Dubna, Russia Emil Huedem, Fermilab.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facility & Siting (CF&S) Overview for the Positron Source
CFS EDR KICK OFF MEETING Process Water August 23, 2007
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
ILC Cryogenics -- Technical Design Report Planning
Presentation transcript:

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING GROUP Process Water and HVAC (Final) Emil Huedem and Lee Hammond

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 2 Outline Emil Huedem (7 minutes)  VE  KlyCluster Lee Hammond (7 minutes)  Comparison Assessment  TDP effort & Information needed for TDP

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 3 VE (Process Water / HVAC)  VE is one of the CFS TD Phase 1 goals  Formal VE session in Nov  Focus on “First Cost”  Main Linac Only  Used RDR deep twin tunnel arrangement  Used ML heat table updated in Oct 2007  about 60 VE items.  about 7 VE items selected by PM for further evaluations – terminated due to funding cut Emil Huedem

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 4 VE (Process Water / HVAC)  Re-started in fall 2008  Only addressed specific VE items selected  Evaluated various possible delta T  Resultant cost delta vs impact matrix presented in GDE meeting Nov  Data will be used by Project Management to assess the overall value vs impact  Potential of about % “first cost” reduction mainly due to (removal of chilled water system, LCW skids, decrease in thermal loads) and partially due to higher delta T configuration Emil Huedem

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 5 Emil Huedem Previously posted at ftp://fess-ftp.fnal.gov/public/ilc/agenda/VE%20Efforts/PROCESS%20WATER%20HVAC/ VE%20Report%20Cover%20without%20COST%20Nov%2025% pdf/

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 6 VE (Process Water / HVAC)…RDR  RDR Process, history, and basis of estimate documented on page 26 – 38 of ILC Note dated May 2007, Rev 0  Thermal Loads was a snapshot in Oct 2006 and has not been updated since RDR, except for the ML in October  Thermal Load info at that time came from various point of contacts  IR was not included in RDR Emil Huedem

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 7 Klycluster (Process Water / HVAC)  Evaluation in Sep 2008  Very attractive cost reduction in process water/hvac systems  Very preliminary data & assumptions used, info per exchange with C.Adolphsen  Presented in GDE meeting Nov 2008 Emil Huedem

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 8 Comparative Table of Current Accelerators - Highlights/Differences  Purpose: Assembled data of current designs and technologies of various high energy physics accelerators in regards to CFS parameters, i.e., power requirements, tunnel depths and lengths, cooling water systems, and ventilation schemes  ILC RDR, ILC post RDR, Kly Cluster, TESLA, XFEL, CLIC, Project X Lee Hammond

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 9 Comparative Table - Highlights/Differences. cont.  Near surface projects consider heat loss to the tunnel walls due to ground water. Deep tunnel projects are in substantially dry rock where wall heat absorption is minimal.  Some projects use existing heat rejection plants.  There are a number of Water system differences-e.g., ILC 2 systems, XFEL(TDR) 3 systems, ILC KLY Cluster 1 system. Lee Hammond

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 10 Comparative Table - Highlights/Differences, cont.  Parallel and Series Flow systems have been considered with some optimization.  There is a wide range of pipe main sizes and delta Ts.  Demarcation of RF Water system differs by project, i.e., in some projects LCW distribution is not in CFS costs.  Wide range of watt/meter thermal loads Lee Hammond

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 11 Comparative Table - Highlights/Differences, cont.  Variances in site wetbulb influences available cooling water temperatures  Obtained data from multiple sources...not all data at same level of development.  Near surface shorter length projects able to locate concentrated heat loads in surface facilities. Lee Hammond

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 12 TDP Effort (process water & hvac) TDP1  Will provide input to evaluation effort for various minimum machine design CFS assessments (similar to KlyCluster effort)  Will need rough thermal loads, locations, criteria from area systems TDP2  Will need more detailed thermal loads and criteria (develop functional criteria template)  Will update RDR design and cost Lee Hammond