Kitchen New sandwich prep table. Kitchen New pizza prep table.

Slides:



Advertisements
Similar presentations
ONE STOP Real Estate Services G ill G roup
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
Flip this House Indiana! WE BELIEVE!!. Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000.
(Builder Marketing Message) (Builder Logo) Consider adding your logo to the master slide.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
WELCOME. Eco Pine Homes-I (Dharampur Project)
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Update on FCPS Construction/Renovation Projects August 2009.
Chapter 10 Sanitary Facilities and Equipment
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
SUNY Canton Facilities Project Update Miscellaneous.
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
Boren School Preparing an existing wall to receive structural improvements.
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
Johanna Mikitka AE-390 October 13, 2004
Civil Engineering & Architecture 2.3 Residential Design.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
FFD 201 – SITE PLAN SITE PLAN.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
Identifying Information: Common Areas - 1 none LEVEL 2.
Project 3 DS 413: Design Studio 413 May 9, 2010.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Graphic Communication
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
DER – Before, During and After: A Homeowner’s Perspective.
The problem is we have new land that needs to get buildings on it.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Puesta Del Sol II Progress and Update Report May, June, & July, 2000.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Elevations McMillan Villas May 30th 2015.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Priced to SELL in Mount Pleasant!! “Home is where the heart is” should be engraved above the fireplace at this inviting home. Family life is given top.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Smrha-Monroe Family Pictures of the House August 2005.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Symbols and Room Finishes
HWQJ , ATTACHEMENT # 03 REV. 1, slide 1 BLDG. # 5101, GHEDI AF BASE Paint metal structure, sliding doors, gutters and downspouts.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
A HOUSE.
Assembly And Installation Of Ikea Kitchen Cabinets
Capital Improvements Presentation
Sneed Property th Ave E, Puyallup Exterior of House
Extension SR1 WP3 Electrical installations
East Hall under construction
International Building Materials and components
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
How & When to Get Permits for Work in Your Home
Minuteman Vocational Technical Regional High School Progress
Planning & Organizing Your Virtual Model
Progress On Capital Campaign & Projects
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Wbs, CONTRACTORS & GIVING A BID
Governors club interior renovation
Presentation transcript:

Kitchen New sandwich prep table

Kitchen New pizza prep table

Kitchen New floor Paint All equipment cleaned

Kitchen New HVAC and ductwork

Kitchen New garbage disposal

Storage Room South of Kitchen New floor New ceiling New paint

Hallway North of Kitchen New floor New ceiling New paint

Hallway Looking North New sanitary sewer from garbage disposal and floor tile Stain doors and frames Clean wood paneling

Roof Area Replace roof above the social quarters Remove stair Close up double- doors New flashing detail at roof/wall

Roof Area Replace the roof Install two (2) new HVAC units and ductwork to the Upstairs Banquet Room

Golf Course Tee Box #8 Install new stone retaining wall and plants at top of wall Tee Box #6 Replace concrete slab