Commercial Mechanical and Service Water Heating Requirements of 2012 International Energy Conservation Code.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
Chapter 3. HVAC Delivery Systems
BUILDING AIR CONDITIONING
HEALTHCARE BUILDING AUTOMATION
HVAC CONTROLS (See section 18.9)
Heating, Ventilating, and Air-Conditioning
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Heating, Ventilation and Conditioning (HVAC) for Hospitals 1 Presentation for: Presented by Leach Wallace Associates September 8, 2011.
Commercial Mechanical Requirements
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
“Do not take anyone’s advice as to how this building should be assembled.”
Heating, Ventilating, and Air-Conditioning (HVAC)
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
2015 IECC Commercial Mechanical Requirements
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
ENERGY STAR Qualified Homes
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
ANSI/ASHRAE/IES Standard HVAC
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Engineer Presentation
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Welcome to S&P USA & the 2012 International Residential and Mechanical Code for Ventilation.
AIR CONDITIONING SYSTEMS 1. All Air Systems An all-Air System is defined as a system providing complete sensible and latent cooling capacity in the cold.
ANSI/ASHRAE/IES Standard HVAC
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Air Conditioning Systems
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/becu BUILDING ENERGY CODES UNIVERSITY PNNL-SA IECC Commercial Mechanical Requirements July.
MECHANICAL ASPECTS OF MICHIGAN UNIFORM ENERGY CODE MIAM DOHERTY INN CLAIRE, MICHIGAN MARK RILEY.
Arkansas Energy Code 2004 Compliance
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
Original Materials Developed By: Britt/Makela Group, Inc.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
© 2009 Trane ANSI/ASHRAE/IESNA Standard Top 10 things you should know about the energy standard.
ENERGY CONSERVATION BUILDING CODE – 2006 PRESENTATION BY VP GUPTA PRINCIPAL CHIEF ENGINEER (ELECTRICAL), BSNL CHENNAI.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
MECHANICAL ENGINEERING FOR SYSTEM BALANCE ASHRAE MEETING 2/15/2007 NORTHERN NEVADA CHAPTER 126 MATT BRENNAN, TBE.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Learning Outcomes Upon completion of this training one should be able to: Identify the influence of codes on pump & hydronic design Understand HVAC loads.
Introduction to Energy Management. Week/Lesson 7 HVAC System Types.
Energy Cost Budget Highlights Jason Glazer, PE GARD Analytics Arlington Heights, Illinois Energy Cost.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Test and Balancing Functional Performance Test Presented by: John Shelander and Dan Acri.
Zone 4 R-38 Ceilings U-0.35 Windows, Doors R-13 Walls R-19 Floors R-10 Foundations.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Builder’s and Contractors Luncheon Energy Code: The Major Changes.
Chapter 32 Heating, Ventilation, and Air Conditioning.
WSHP Systems 1.
Maria’s Restaurant Chapter 1 Section 4
Mark Hydeman, PE of Taylor Engineering
Section 6: Air-Conditioning (Heating And Humidification)
Technology in Architecture
Story of No-Cost Energy Savings at Ohio Union
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
FBE03: Building Construction & Science
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Commercial Mechanical and Service Water Heating Requirements of 2012 International Energy Conservation Code

2012 International Energy Conservation Code (2012 IECC) Residential building (definition for this code) Detached one- and two-family dwellings Multiple single-family dwellings (townhouses) R-2, R-3 and R-4 buildings three stories or less in height above grade plane Commercial building (definition for this code) All not included in residential building definition Commercial ProvisionsResidential Provisions 1. Scope and Administration 2.Definitions 3. General Requirements 4. Commercial Energy Efficiency4. Residential Energy Efficiency 5. Reference Standards

Key Residential Requirements Insulate ducts outside thermal envelope. Seal ducts, air handlers and filter boxes. Air leakage test ducts and air handlers NOT entirely inside thermal envelope. Insulate pipes capable of carrying comfort conditioning fluids ≥105°F or ≤55°F. Insulate service hot water pipes Install dampers on outdoor intakes and exhausts Install efficient whole-house fans

Commercial Energy Efficiency Commercial building shall comply with ONE of: 1. ANSI/ASHRAE/IESNA Standard IECC envelope, mechanical systems, service water heating, electrical power and lighting systems requirements AND one additional efficiency option 3. IECC Total Building Performance where building energy cost ≤85% of standard reference design building. Additions, alterations and repairs to existing buildings shall comply with ONE of: IECC requirements, or ANSI/ASHRAE/IESNA Standard

Additional Efficiency Package Options Buildings comply with at least one of Efficient HVAC performance Efficient lighting system On-site supply of renewable energy Individual tenant spaces comply with either Efficient HVAC performance or Efficient lighting system Unless documented compliance with on-site supply of renewable energy for entire building

Efficient HVAC Performance Option In addition to requirements of mechanical section Can only be used where efficiencies are greater than equipment efficiencies in mechanical section Minimum equipment efficiency requirements for: Unitary air conditioners and condensing units Unitary and applied heat pumps Package terminal air conditioners and package terminal heat pumps Warm air furnaces and combination warm air furnaces/air conditioning units, warm air duct furnaces and unit heaters Boiler Chillers Absorption chillers

Mechanical Systems (Mandatory) Calculation of heating and cooling loads In accordance with ASHRAE Standard 183 Accounting for all loads based on project design Adjusted to account for load reduction due to energy recovery Equipment and system sizing Output capacity shall not exceed calculated loads

Equipment Performance (Mandatory) Unitary air conditioners and condensing units Unitary and applied heat pumps Packaged terminal air conditioners, package terminal heat pumps, room air conditioners and room air-conditioner heat pumps Single-packaged vertical air conditioners and single-package vertical heat pumps Warm air furnaces and combination warm air furnaces/air-conditioning units, warm air duct furnaces and unit heaters Gas- and oil-fired boilers Electrically operated condensing units Water chilling packages Heat rejection equipment Heat transfer equipment

HVAC System Controls (Mandatory) Thermostatic controls Individual control located in zone being controlled Exception for independent perimeter systems designed to offset only building envelope heat losses ≥1 humidity control device for each humidification system Heat pump supplementary heat Control to limit operation of supplementary electric resistance heat when heat pump can meet heating load

HVAC System Controls (Mandatory) Set point overlap restrictions 5°deadband between heating & cooling in each zone Off-hour controls Automatic setback controls for each zone Exception: Zone with full HVAC load demand <6,800 Btu/h, and Readily accessible manual shutoff switch Thermostatic setback capabilities Automatic control to set back or temporarily operate system Automatic setback & shutdown capabilities 7 different daily schedules per week 10 hour backup power to retain time and programming Manual override for up to 2 hours or occupancy sensor

HVAC System Controls (Mandatory) Automatic start capabilities Adjust daily start time to have occupied temperature immediately prior to occupancy Shutoff damper controls Automatically shut both outdoor air supply and exhaust dampers when systems or spaces served not in use Exception for allowed gravity dampers Snow melt system control Automatic shutoff when pavement temperature >50° & no precipitation falling, and Automatic or manual shutoff when outdoor temperature >40°

Ventilation (Mandatory) Capability to reduce outdoor air to minimum required by IMC Demand controlled ventilation Provided for: spaces >500 sq. ft., and Average occupant load of 25 people per 1,000 sq. ft., and Served by systems with one or more of:  Air-side economizer  Automatic outdoor air modulating damper control  Design outdoor airflow >3,000 cfm Exceptions: Systems with energy recovery Multiple zone systems without DDC with central control panel Design outdoor airflow <1,200 cfm Supply airflow rate minus makeup or transfer air requirement <1,200 cfm Ventilation provided for process loads only

Energy Recovery Systems (Mandatory) Requirement for fan systems in climate zone 5A Capability to: Provide changes in enthalpy ≥50% of difference between outdoor and return air, and Permit cooling with outdoor air where required

Ducts & Plenums (Mandatory) Insulation ≥R-6 insulation located in unconditioned spaces ≥R-8 insulation where located outside building ≥R-8 insulation separating duct or plenum from exterior or unconditioned or exempt space Sealing and testing All longitudinal and traverse joints, seams and connections securely fastened and seal with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems, or tapes installed per manufacturer’s instructions High pressure duct test testing with air leakage rate ≤6.0

HVAC Systems (Mandatory) Piping insulation Heating outside a building Radiant heating system controlled by occupancy sensing device or timer switch 15

HVAC Systems (Mandatory) For each system with total fan system motor nameplate horsepower >5 hp Commissioning and completion requirements In accordance with Section C408.2

HVAC Systems & Equipment (Prescriptive) Economizers On systems ≥33,000 Btu/h Either air or water side Air economizer  Modulates outdoor air and return dampers  Provide outside air up to 100% of design supply air  Sequenced with mechanical cooling  Shutoff when no longer reduces cooling energy use  Relieves excess outdoor air Water side economizer  Serving up to 100% cooling load when outdoor air 50° dry bulb & 45° wet bulb  <15 feet water side pressure drop or secondary loop  Integrated with mechanical cooling system  Does not increase heating energy use

HVAC Systems & Equipment (Prescriptive) Variable air volume (VAV) fan control Individual fans ≥7.5 hp Variable speed (mechanical or electrical) Variable-pitch vane-axial fan, or ≤30% of design wattage at 50% design airflow & ⅓ total design static pressure Static pressure reset for systems with direct digital control of zone boxes reporting to central control

HVAC Systems & Equipment (Prescriptive) Hydronic system controls ≥300,000 Btu/h design output heating and cooling capacity Requirements No three pipe systems ≥15° deadband on two-pipe changeover systems Part load controls for systems  Automatic supply-water temperature reset, or  Pump system flow control Automatic isolation of equipment in central plant with >1 chiller or >1 boiler

HVAC Systems & Equipment (Prescriptive) Hydronic (water loop) heat pumps systems ≥20° deadband between heat rejection and heat addition by central device Open- or closed-circuit cooling tower: Separate heat exchanger to isolate tower from loop Automatic shutoff of tower loop pump, and Automatic valve on tower loop to stop flow Two-position valve on each hydronic heat pump with total pump system power >10 hp

HVAC Systems & Equipment (Prescriptive) Heat rejection equipment fan speed control Automatic speed control on each fan with motor ≥7.5 hp Air systems serving multiple zones Shall be variable air volume (VAV) systems Single duct terminal device reduce primary airflow before reheating or recooling Dual duct/mixing terminal device reduce flow from one duct to minimum before mixing air from other duct No economizer on single fan dual duct/mixing systems >90,000 Btu/h Automatic supply air temperature reset control

HVAC Systems & Equipment (Prescriptive) Heat recovery for service water heating Facility operating 24 hours per day >6,000,000 Btu/h water-cooled heat rejection >1,000,000 Btu/h design service water load Hot gas bypass limitation On systems without multiple steps of unloading or continuous capacity modulation Maximum hot gas bypass capacity 50% on units ≤240,000 Btu/h 25% on units >240,000 Btu/h Exception for unitary packaged systems ≤90,000 Btu/h

Service Water Heating (Mandatory) Equipment performance Temperature controls Heat traps Pipe insulation ≥1” for automatic-circulating hot water and heat-traced systems ½” for first 8’ in non temperature maintenance systems without integral heat traps in equipment Automatic or readily accessible manual control on circulating pump or heat trace shut-off when limited hot water demand

System Commissioning (Mandatory) Mechanical systems commissioning and completion requirements Prior to passing final mechanical inspection Registered design professional shall provide  Evidence of mechanical system commissioning  Evidence of completion Construction document notes to clearly indicate commissioning & completion requirements Documents Given to owner & available to building official 24

System Commissioning (Mandatory) Exception: 1. Total mechanical equipment capacity in building: <480,000 Btu/h cooling capacity, and <600,000 Btu/h heating capacity 2. Systems serving Dwelling units Sleeping units in hotels, motels, boarding houses, or similar units 25

System Commissioning (Mandatory) Commissioning plan Narrative description of activities List of specific equipment, appliances or systems to be tested and description of tests to be performed Functions to be tested Conditions at which tests will be performed Measurable performance criteria 26

System Commissioning (Mandatory) Systems adjusting and balancing Air system balancing Discharge dampers prohibited on fan w/motors ≥10 hp Exception for fans with motors ≤1 hp Hydronic system balancing Exceptions:  Pumps with motors ≤5 hp  Throttling results in ≤5% of nameplate hp draw if impeller were trimmed 27

System Commissioning (Mandatory) Functional performance testing Equipment (components, systems and system-to-system interfacing ) All modes in sequence of operation Redundant or automatic back-up mode Performance of alarms; and Operation upon loss of power and restoration of power Controls Economizers 28

System Commissioning (Mandatory) Preliminary commissioning report Completed & certified by registered design professional or approved agency Identifies: Itemization of deficiencies that have not been corrected Deferred tests because of climate conditions Climate conditions for deferred tests Acceptance of report Letter from building owner acknowledging receipt Copy of report 29

System Commissioning (Mandatory) Documentation requirements Provided to building owner within 90 days of receipt of CO Drawings Manuals Submittal data Manufacturer’s operation manuals and maintenance manuals Name and address of service agency HVAC controls system maintenance and calibration information Narrative of how each system is intended to operate System balancing report Final commissioning report Functional performance tests results Disposition of deficiencies including used or proposed corrective measures Functional performance test procedures 30

31 Thank You ! Frederick F. Wajcs, Jr., P.E. Energy Code Consultant