6TH ANNUAL CONFERENCE.

Slides:



Advertisements
Similar presentations
Highway Maintenance and Preservation Needs
Advertisements

Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Central Texas Turnpike Project Tour Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
January 24, Maryland Climate Action Plan  Maryland Climate Action Plan  Required by Governor’s Executive Order (January 2007) - Released August.
6 TH ANNUAL CONFERENCE. Footer Text Date PERFORMANCE-BASED MAINTENANCE APPROACH DB/P3 Edward P. Pensock, Jr. P.E. Strategic Project Division Director.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
6 TH ANNUAL CONFERENCE. Performance Based Maintenance Results Tim Lattner, P.E. Director, Office of Maintenance, Florida Department of Transportation.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
The City of North Bend Sanitary Sewer System
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
1 Ministry of Transport, Public Works and Water Management.
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Innovative Finance for 183A Bill Chapman CFO, Central Texas Regional Mobility Authority Bill Chapman CFO, Central Texas Regional Mobility Authority.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
43 rd Annual Western States Highway Equipment Managers Association Conference Washington State Department of Transportation Presentation August 29, 2011.
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Asset Management Maintenance Management System
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Construction of a Transfer Station
People are pedestrians by design join the movement at
STRATEGIC ASSET MANAGEMENT ASSISTANT CHIEF FIRE OFFICER PAUL SOUTHERN.
Roads and Transport Limpopo 02 August Infrastructure Budget allocation for 2011/12 Upgrading of roads=R770,273m Preventative maintenance= R375,
John Angiulli Interim Director PUBLIC WORKS DEPARTMENT Citizen Academy October 9 & 16, 2012.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
Review and Comment on Draft 2009 Ten-Year State Highway Operation and Protection Plan Presented to California Transportation Commission February
Department of Public Works FY 2015 Operating Budget May 19, 2014.
2017 Public Works Budget September 6, 2016 Donald J. Theisen, P.E. Director.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
2017 ACEA Annual Conference
PUBLIC WORKS DEPARTMENT
Sheryl Loesch Swakopmund, Namibia October 17, 2017
AGA Workshop Resource Management and Work Forecasting
Enron Energy Services Energy Management Outsourcing Overview
September 13, 2018 Ten County Budget Conference
TRANSPORTATION SUMMIT
Introduction DEFINATION :-
Comprehensive and Dependable Transportation Plan
Presentation transcript:

6TH ANNUAL CONFERENCE

Asset Management & Operations Harris County Toll Road Authority Asset Management & Operations Presented to the Association for the Management and Operations of Transportation Infrastructure Assets

Harris County Toll Road Authority The Toll Road Authority was created by Harris County Commissioners Court in 1983 after Harris County voters approved a referendum to release $900 million in bonds to construct toll roads in the rapidly growing Greater Houston Metropolitan area. Harris County Toll Road Authority provides a transportation option to help address regional growth that is independent of State planning or funding, which cannot support the mobility needs of that region. The toll rate is the funding mechanism used by the HCTRA to construct, operate and maintain the needed infrastructure.

Summary of System Assets 120 Centerline miles (682 lane miles)* 191 Bridge structures 10 Mainlane toll plazas 80 Ramp toll plazas 10 Pump stations 6 EZ Tag storefronts 208 Overhead sign structures 6,000+ Small signs 3,257 Roadway + 63 high-mast lights 1,023 acres of right-of-way (ROW) * Coming Spring 2015: Tomball Tollway (6.74 centerline miles)

A major challenge for a transportation agency is solving how to maintain aging infrastructure to accommodate growing or densely populated regions. The condition of infrastructure will influence the commerce, growth, and standard of living in a region.

Comprehensive Maintenance Program “Toll-paying users expect a high rate of service and that the assets will be maintained in a good state of repair.” - Moody’s September 2014 Both Moody’s and Fitch released credit rating reports on U.S. toll roads.

Comprehensive Maintenance Program Three strategies to preserve, maintain and repair the existing system. Comprehensive Maintenance Program Material Procurement Routine/ Preventative Maintenance Restoration & Replacement (R&R)

Comprehensive Maintenance Program Three strategies to preserve, maintain and repair the existing system. Comprehensive Maintenance Program O & M Material Procurement Routine/Preventative Maintenance Restoration & Replacement (R&R)

Material Procurement Supply and store all utilized material Established 140 material Purchase Order (P.O.) Harris County is able to utilize its size to acquire contracts with major material supply vendors: Lowe’s Fastenal Sherwin Williams HD Supply Grainger

Routine/Preventative Maintenance HCTRA Maintenance Department (24 hrs/365 days) 1 Maintenance Operation Manager 10 Maintenance Section Supervisors Roadway Maintenance Contract (Jorgensen) 108 Contract full-time employees Facility Maintenance Contract (ICA) 25 Contract full-time employees Utility Service Contracts Pump stations Generators Lift stations Water wells Sanitary holding tanks

Routine/Preventative Maintenance Routine Roadway Maintenance Contract (Jorgensen) $12.5 million annual contract (defined cycle work and manpower) Cycle: Sweeping, mowing, landscaping, litter pickup, lane cleaning and system lighting Manpower: potholes, guardrail and barrier rail repair, inlet cleaning, sign replacement, etc.

Routine/Preventative Maintenance Facility Maintenance Contract (ICA) $2.5 million annual contract (defined cycle work and manpower) Maintain: 10 mainlane toll plazas 80 toll ramp plazas 3 administration buildings HVAC and utilities hub buildings at unmanned toll facilities

Typical Program Lifecycle Evaluate Plan Budget Schedule Execute Report

Maintenance Program Lifecycle Plan Budget Schedule Execute Report Evaluate

Evaluate Evaluate costs: Quarter-to-quarter Year-to-year Evaluate contracts: Evaluate manpower utilization: Month-to-month Evaluate the condition: Monthly service request Maintenance contractor condition assessment Bi-annual superintendent section inspection TxDOT off-system bridge inspections Annual system inspection report

Evaluate Contract and Material Usage High material costs: Paint: cut paint costs in half From $225k annually Roller vs. spraying Shifted to night schedule Delineators: cut costs in half Type and location Manpower utilization: Raised Pavement Marking (RPM) installation More effective to perform with maintenance contract labor Short-load concrete: Self-batch trailer mixer with maintenance contract labor Fabricate toll booths Cheaper and more efficient to fabricate in-house

Evaluate Process Impacts: Process changes (Facility / Roadway / Tolling): Closures for preventative maintenance/ to repair booth HVAC system & lighting Closures to replace delineators and maintain REACTs Closures to clean lanes & repair pavement Closures to replace / maintain toll equipment Impacts: Cost of multiple closures by different contractors Possibility of multiple disruptions at one plaza location Uncontrolled working environments Lost toll revenue

Cooperative Preventative Maintenance: Evaluate Process Cooperative Preventative Maintenance: coordinate various contractors’ maintenance closures to occur concurrently

Evaluate Results Ave. $23.6 M Lane miles

Evaluate Condition By satisfying the senior lien revenue bond indenture, the Annual System Inspection Report is the basis of the yearly Restoration and Replacement Maintenance Projects (R&R Projects) budget forecast. The Annual System Inspection Report identifies system-wide deficiencies within the existing facility and roadway infrastructure, and outlines a two to five year implementation plan. HCTRA Maintenance then determines whether to correct these deficiencies by either incorporating the repair into the Routine / Preventative Maintenance Program (O&M), or acquiring additional engineering consulting support to develop future Restoration and Replacement Maintenance Projects on an annual basis.

Evaluate Condition

Comprehensive Maintenance Program Material Procurement Routine/Preventative Maintenance Restoration & Replacement (R&R)

Maintenance R&R Projects Last 5 Years Completed Projects Worth $58.7 Million Currently $10.2 Million in Active Projects Letting $24.4 Million in Projects by Year End

Unexpected

THANK YOU Quinton Alberto, P.E. Harris County Toll Road Authority Assistant Director- Maintenance & Traffic Engineering E-mail: Quinton.Alberto@HCTRA.org