LEED v4 Integrative Project Planning and Design

Slides:



Advertisements
Similar presentations
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Advertisements

CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Sustainable Construction
Green Building Leadership in Energy and Environmental Design (LEED)
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
LEED Gold Woodward Academy Math-Science Building Leadership in Energy and Environmental Design.
Continuous Value Enhancement Process
LEED CERTIFICATION IN THE RETAIL ENVIRONMENT Maggie Benson and Isabelle Bouthillier Project By:
Sustainable Design & Construction at Yale University July 2009.
Copyright Cengage Learning 2013 All Rights Reserved 1 Chapter 14: Supply Chain Management Introduction to Designed & Prepared by Laura Rush B-books, Ltd.
Introducing Connecticut LEED Program for Green Buildings
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
GREEN BUILDING.
BECOMING GREEN Santa Margarita High School Academic Building.
Sustainable Core and Shell. Sponsored by: AIA The Corporate Realty, Design & Management Institute.
Green School Design Gary A. Jerue ED 846 Spring 2010.
Green Economy Initiative Derek Eaton UNEP UNCEEA, June 2010.
Ripley Rasmus AIA LEED AP
Corporate Social Responsibility- do we need a Statutory Instrument? Presented to the Zambia Alternative Mining Indaba conference- July 17, 2013 Sombo Chunda,
REVISED JUDGING CRITERION – AN INTRODUCTION. What is the revised judging criterion? Which Enactus team most effectively used entrepreneurial action to.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
Learning by Design Using LEED to enhance teaching and learning.
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
Center for International Climate and Environmental Research-Oslo: Research Priorities and Interest in China Lin Gan SINCIERE Member Workshop October 19,
Sustainability and Total Cost of Ownership Strategies for Higher Education.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
Challenges AND Opportunities in Public and Private Sectors Maria Atkinson Green Building Council of Australia.
AMRUTA S. MUDHOLE ROLL NO.38 G.S.B’s SMT. SURAJBA COLLEGE OF EDUCATION.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
Guidance for AONB Partnership Members Welsh Member Training January 26/
Environmental auditing
Sustainability at NMSU A part of the integrated planning process.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
LEED-NC Market Transformation As of All statistics exclude pilot projects 350 M gsf 50 States 13 Countries 323 Certified Projects 2805 Registered.
ENVELOPE. LIGHTING.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
Overview of the NSF 375 Draft Sustainability for the Water Treatment and Distribution Industry October 30, 2012.
Principles of Sustainable Construction Chapter 10.
Fundamentals of LEED v4 for
Developing a Framework In Support of a Community of Practice in ABI Jason Newberry, Research Director Tanya Darisi, Senior Researcher
Chapter 8 - Integrative Process
Integrative Process Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Presentation By L. M. Baird And Scottish Health Council Research & Public Involvement Knowledge Exchange Event 12 th March 2015.
The UC Project Management Institute is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Association of Child Welfare Agencies Conference, 2008 Management and Leadership Institute.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Our Mission... “To facilitate collaboration and partnerships through a comprehensive master plan which promotes economic growth, community development.
Green Building Certification Systems for Existing Buildings John Park, PE, CEM, CSDP Dept of Veterans Affairs June, 2009.
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
MAPA Wednesday Webinar Everything you always wanted to know about LEED* *but were afraid to ask.
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
What is OneWater? “One Water is an integrated planning and implementation approach to managing finite water resources for long-term resiliency and reliability,
‘Sustainability Matters – it’s the future of your business’
LEED Defined Leadership in Energy and Environmental Design
Standards for success in city IT and construction projects
Oceans and Society: Blue Planet
LEED BD+C – Integrative Process
Green Building and Sustainable Architecture
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
LEED AP BD+C Made Easy Welcome to Green Building Academy’s LEED AP BD+C Examination preparation course LEED AP BD+C Made Easy © Conserve Green.
Leadership in Energy and Environmental Design (LEED)
Presentation transcript:

LEED v4 Integrative Project Planning and Design Daniel A. Katzenberger, P.E., CEM, BEMP LEED-AP BD+C, ID+C, O+M, Homes Certified LEED Reviewer Certified Green Globes Assessor Green Building Assessment Institute dan@gbai.org

Integrative Project Planning and Design Learning Objectives: To understand the technical prerequisite and credit requirements of Integrative Project Planning and Design as implemented in LEED v4 To understand the interaction of building, energy, and water systems and how to prioritize each of these as part of the integrative design process To understand the challenges and opportunities associated with implementing an integrative design process

Integrative Project Planning and Design Agenda: v4 Prerequisite Integrative Project Planning and Design v4 Credit Integrative Process Integrative Design in Green Globes and in the Living Building Challenge Examples/Discussion/Q&A Guided and open dialog about challenges and opportunities related to implementing successful integrative project plans

New prerequisite and credit for LEED v4 based on v3 Pilot Credit Prerequisite applies to LEED Healthcare projects only Credit applies optionally to all LEED-NC project types

Healthcare Prerequisite Prepare an Owner’s Project Requirements Document (see Fundamental Commissioning and Verification Prerequisite for OPR requirements): Include a health mission statement that addresses the triple bottom line values: economic, environmental, and social Determine Preliminary LEED Rating Goals Prior to Schematic Design (recommended), conduct a preliminary LEED meeting with at least four key project team members and the owner’s representative to: Determine the LEED certification level to pursue Select LEED credits to achieve this certification level Identify the responsible parties for each attempted LEED credit

Healthcare Prerequisite Design Charrette Prior to schematic design (recommended), conduct a minimum four-hour integrated design charrette with at least four key project team members and the owner’s representative with the goal of optimizing the integration of green strategies across all aspects of the building design, construction, and operations. Selected Step-by-Step Guidance (prior to the Charrette) Review the Integrative Process ANSI Consensus National Standard Guide 2.0 for the Design and Construction of Sustainable Buildings and Communities (must purchase separately) Collect information about the project’s climate, site conditions, waste treatment infrastructure, energy load distribution, water sources, transportation options, and potential building features.

Healthcare Prerequisite Selected Step-by-Step Guidance (Charrette Goals) Introduce attendees to the fundamentals of the integrative process Share information collected prior to the charrette with all attendees Elicit the owner’s and other stakeholders’ values, aspirations, and requirements Clarify functional and programmatic goals Establish initial performance targets Identify desired LEED certification level and credits to be targeted Generate potential strategies for achieving performance targets Determine questions that must be answered to support project decisions Initiate development of the project’s health mission statement (remember triple bottom line issues: economic, environmental, and social Create and action plan to include the above Include the project goals, performance targets, LEED targets, and the health mission statement in the owner’s project requirements document.

Integrative Design Credit NC, CS, Schools, Retail, Data Centers, Distribution Warehouse, Hospitality, & Hospitals Discovery: Use the following analysis to inform the Owner’s Project Requirements, Basis of Design, and construction documents: Energy Related Systems Before the completion of schematic design, perform a “simple box energy analysis” to explore how to reduce energy loads in at least two of the following areas: Site Massing/Orientation Envelope Lighting Thermal Comfort Plug and Process Loads Programmatic and Operational Parameters

Integrative Design Credit NC, CS, Schools, Retail, Data Centers, Distribution Warehouse, Hospitality, & Hospitals Implementation Energy Related Systems Document how the “simple box” analysis described above influenced the project’s OPR and/or BOD.

Integrative Design Credit NC, CS, Schools, Retail, Data Centers, Distribution Warehouse, Hospitality, & Hospitals One of the major influences of rating system development is the progression of codes, particularly energy codes, around the world. ASHRAE has incorporated a significant change to Standard 90.1-2010 and as a result, LEED has shifted its minimum energy performance requirements to stay above (or below, depending on your perspective) code and continue to be a leadership standard.

Integrative Design Credit NC, CS, Schools, Retail, Data Centers, Distribution Warehouse, Hospitality, & Hospitals Discovery: Use the following analysis to inform the Owner’s Project Requirements, Basis of Design, and construction documents: Water Related Systems Before the completion of schematic design, perform a preliminary water budget analysis to include: Indoor Water Demand Outdoor Water Demand Process Water Demand Water Supply Sources

Integrative Design Credit NC, CS, Schools, Retail, Data Centers, Distribution Warehouse, Hospitality, & Hospitals Implementation Water Related Systems Document how the water analysis described above influenced the project’s OPR and/or BOD. Demonstrate how at least one on-site non-potable water supply source was used to reduce the burden on municipal supply or wastewater treatments systems by contributing to at least two of the water demand components listed above. Demonstrate how the water analysis informed the design of the plumbing systems, sewage conveyance or on-site sewage treatment, rainwater quantity and quality, landscaping, irrigation, and site water elements, and roofing systems.

Integrative Design Credit NC, CS, Schools, Retail, Data Centers, Distribution Warehouse, Hospitality, & Hospitals Step-by-Step Guidance Become Familiar with the Integrative Process Conduct Preliminary Energy Research and Analysis Conduct Preliminary Water Research and Analysis Convene Goal-Setting Workshop Evaluate Possible Energy Strategies Evaluate Possible Water Strategies Document how the Analysis Informed the Design

Integrative Design Prerequisite and Credit V4 Technical Questions and Answers

Integrative Design Process Green Globes Credit Requirements (individual points for each requirement) Employ an integrated design process to include a minimum of five of the key design disciplines Establish qualitative green design goals at pre-design for the site, envelope, materials efficiency, and indoor environment Establish performance goals for energy efficiency, renewable energy, greenhouse gas emissions, water conservation, life cycle impacts, and construction waste Hold progress meetings at concept design, design development, and construction documents Hold progress meetings at pre-construction, 25% construction, 50% construction, and substantial completion Capital Asset Plan and Business Case Summary for Federal projects

Integrative Design Process Living Building Challenge Credit Requirements (N/A) The Living Building Challenge does not dwell on basic best practice issues so it can instead focus on fewer, high level needs. It is assumed that to achieve this progressive standard, typical best practices are being met. The implementation of this standard requires leading-edge technical knowledge, an integrated design approach, and design and construction teams well versed in advanced practices related to ‘green building’ https://ilbi.org/lbc/LBC%20Documents/lbc-2.1

Examples/Discussion/Q&A Integrative Design as Systems Integration We must understand all significant relationships between systems Buildings are not a set of unrelated components In order to optimize a holistic system, we need to implement a holistic approach Using a holistic approach, we can optimize, downsize, and possibly even eliminate entire systems We must think outside the boundaries of the building itself; what systems influence the building and what systems will the building influence

Examples/Discussion/Q&A Beware of traditional design “silos” The LEED v4 credit consists of an “energy” component and a “water” component; however, energy and water interact in many ways. For example: HVAC Cooling Tower vs. Open Loop GSHP vs. Air-Cooled Systems Domestic Hot Water Heating vs. Plumbing Fixture Selection HVAC Energy Recovery for Domestic Hot Water Heating Additionally, creative solutions might require input from more than the HVAC and Plumbing Designers. For example: Rooftop solar hot water heating Rain capture for cooling tower make-up We must think holistically about energy, water, and all related building systems if we are to successfully optimize all aspects of the building’s design

Examples/Discussion/Q&A Integrative design requires more people and more effort than is traditionally allocated at the pre-design phases of the project. For example: What team members are required to determine the optimum fenestration layout, and when should this be done? How, when, and by whom is the building fenestration layout typically decided? Why should the Lighting Designer be involved in this discussion? Why should the Interior Designer be involved in this discussion? What does the Architect risk by asking for input from the HVAC Designer prior to determining the fenestration layout? What is more important, window U-value, window shading coefficient, or window layout when determining overall building energy use? Should the owner be involved in larger project team discussions about fenestration layouts and window selections? Why or why not? Who is responsible for designing and controlling natural daylight?

Examples/Discussion/Q&A Discussion Item, for a typical design process, it has been said: When just 1 percent of a project's up front costs are spent … up to 70 percent of its life cycle costs may already be committed. —Joseph Romm Reed, Bill (2011-10-11). The Integrative Design Guide to Green Building: Redefining the Practice of Sustainability (Wiley Series in Sustainable Design) (Kindle Locations 5443-5445). Wiley Publishing. Kindle Edition. According to the AIA's presentation on the Integrated Project Delivery Process, the Orcutt-Wislow Partnership reported the following: “We have found that when we've completed the design development phase, we're already close to 60% finished with construction documentation. Reed, Bill (2011-10-11). The Integrative Design Guide to Green Building: Redefining the Practice of Sustainability (Wiley Series in Sustainable Design) (Kindle Locations 2853-2855). Wiley Publishing. Kindle Edition.

Examples/Discussion/Q&A Discussion Items: The stages before schematic design (discovery) in the integrative process take nearly twice the time of the same stages in the traditional process (conceptual design) but time required in the integrative process for design development (DD) is reduced, and time in the construction documents (CD) phase can be cut by over a third or more. Reed, Bill (2011-10-11). The Integrative Design Guide to Green Building: Redefining the Practice of Sustainability (Wiley Series in Sustainable Design) (Kindle Locations 2858-2861). Wiley Publishing. Kindle Edition. Incorporating input from all key stakeholders and members of the design team before schematic design begins is essential, particularly because 70 percent of the decisions associated with environmental impacts are made during the first 10 percent of the design process. Reed, Bill (2011-10-11). The Integrative Design Guide to Green Building: Redefining the Practice of Sustainability (Wiley Series in Sustainable Design) (Kindle Locations 3212-3214). Wiley Publishing. Kindle Edition.

Examples/Discussion/Q&A Hypothetically, which of the following is the most important factor to consider when designing a new building? Operational Energy Water Use Embodied Energy Indoor Environmental Quality Transportation Does everyone on the design team, including the owner, agree? Which of the above categories qualifies for the most LEED points? Does ranking by the number of LEED points affect which is most important? Where do design and construction costs come into play in comparing these factors?

Examples/Discussion/Q&A What are some of the challenges with implementing this “new” integrative design process? The findings of many studies suggest that the conscious self “plays a causal role only 5% of the time.” There is an active effort on behalf of the mind to make what is conscious unconscious (or subconscious) as quickly as possible. While conscious choice and guidance are needed to perform new tasks, after some repetition, conscious choice quickly drops out and unconscious habit takes over, freeing up precious reserves of conscious awareness. Bargh, J. A. and Chartrand, T.L. (1999) The unbearable automaticity of being. American Psycologist, 54 (7) 462-479 In other words, we are creatures of our subconscious habits, and it takes great effort to modify our habits. We are in the habit of designing buildings a certain way, and changing these habits takes effort; we must address perceived risks.

Examples/Discussion/Q&A The most important work that someone trying to introduce a new design process paradigm does is remove risk and uncertainty in order to unleash the latent capacity others have to make change happen. The most common type of risk/uncertainty preventing engagement in implementing integrative design processes are social in nature (status, fairness, alliances, relationships, autonomy, etc.) Often, perceived social risks/uncertainties exist semi-consciously or unconsciously in the form of old stories, feelings, and even physical sensations. Where social risks are concerned, we need to support people to experience their way into new ways of thinking/feeling, rather than hoping that they will think their way into new ways of feeling/thinking about the real nature of their social risk/opportunity. Leith Sharp, Harvard ENVR E-117 – Catalyzing Change – Sustainability Leadership for the 20st Century

Working With the Change Cycle Strategic Problem Solving: Implementation Working With the Change Cycle Transforming 100 Condition Threshold Reached 75 Pioneering % changed 50 Condition Threshold Reached Awakening 25 Rogers, Diffusion of Innovations, 1995 overlaid with APT Framework by Leith Sharp & Julie Newman

Conceptual and stylised representation of waves of innovation MARKET INNOVATION IN THE GREEN ECONOMY Conceptual and stylised representation of waves of innovation Source: TNEP (2005)

Change Leadership: Reduce Risk/Instability and facilitate stable change in the four key layers of organizational life - Infrastructure, Organizational, Social & Individual Earth Systems Infrastructure Systems Organizational Social Systems /Dynamics Individual   Ecosystems and Species Extinction &toxicity Climate systems Disturbance Atmospheric systems Ozone depletion, pollution Oceanic systems Disturbance to sea levels, temperatures, currents, sea life  Geological and Soil systems Desertification, land pollution, mineral & resource depletion, depletion of soil quality, toxicity Hydrological systems Water pollution & scarcity  Nutrient systems Disturbance of nutrient flows, toxicity Buildings Transportation Energy Materials Food Supply Water Sewerage Landscaping IT INTERNAL: Governance Management Structures Planning Processes Decision Making Processes Finance & Accounting Policy Instruments Information Systems Procurement systems Human Resources EXTERNAL: Community Government/ Regulatory Market/Employers Utilities Higher Ed. Associations Media Group Processes & Dynamics Culture Relationships/ Alliances Social Connections Trust Emotional Sensitivity Inclusiveness Fairness Relatedness Autonomy Creativity Status Personality Life Circumstances Personal & Interpersonal Capabilities Values/Attitudes Habits/Behaviors Education Skills/Abilities Leith Sharp

Examples/Discussion/Q&A Our project teams and organizations need to be guided through their first integrative design projects in order to become comfortable with this new design process paradigm Integrative design is a change management challenge; managing this challenge requires someone with the ability to guide project teams through their first successful integrative design projects Reducing risk and instability is the foundation of the successful implementation of true Integrative Design projects Stable change requires successful projects (perceived risks are reduced with each successful project) Social dynamics are pivotal in unlocking the change capability of project team and organizations Leith Sharp, Harvard ENVR E-117 – Catalyzing Change – Sustainability Leadership for the 20st Century

Daniel A. Katzenberger dan@gbai.org