Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES.

Slides:



Advertisements
Similar presentations
Forest Service and A/E Services
Advertisements

Welcome to the Academic year 2012/2013 The school prepares and conducts IGCSE Cambridge examination in Grade 10.(AE180) The AS Edexcel examination is conducted.
Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES.
LET’S PLAY HVAC JEOPARDY ! CareersJack Facts Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final JeopardyJeopardy EducationFun.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
B ROOKSTONE S CHOOL Parents’ Meeting Teresa Young BPA President.
FY 2014 YEAR IN REVIEW SPONSORED PROJECTS EXPENDITURES OFFICE OF GRANTS & CONTRACTS
P RESENTED B Y M R. A LI A SGHER K HAN P ARTNER, H AIDERMOTA BNR &C O. & M R. S ABOOR K ARAMAT A SSOCIATE, H AIDERMOTA BNR & C O.
S UMMARY OF THE P ARENT S ATISFACTION SURVEY AND K EY NEW DISTRICT ACHIEVEMENT DATA 1 Cambridge School District September 2014.
1 Los Angeles Basin Chapter of ICC L OS A NGELES B ASIN C HAPTER OF ICC.
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
OSHA Federal Standards October 1, 2013 – September 30, 2014.
OSHA Federal Standards October 1, 2013 – September 30, 2014.
S AINT PETER PUBLIC SCHOOLS School Facilities Presentation Community Forum March 18, 2014.
2013 A SSESSMENT R OLL S KEENA – Q UEEN C HARLOTTE R EGIONAL D ISTRICT P RESENTERS : S COTT S ITTER – A SSESSOR, N ORTH R EGION T RACEY L OVE – S ENIOR.
H IGH S CHOOL C OURSE S ELECTION N IGHT January 21, 2015.
Senior Thesis Hotel and Convention Center Schaumburg Structural Option Eric Yanovich S tructural O ption S chaumburg H otel and C onvention C enter S.
N ORTH G ODWIN E LEMENTARY S CHOOL. D EMOGRAPHIC I NFORMATION Total Number of Students (Kindergarten through 4 th Grade): 438 Ethnicity American Indian--.5%
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Irvine Unified School District Information Technology Department LAN A DMIN M EETING January 16, 2014.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
S TARTING H IGH S CHOOL F ROM 8 TH TO 9 TH GRADE 2015 – 2016 Brian Wharton YHS Principal John Johnson RMS Principal Heidi Bunker YMS Principal.
THE DUFFY SCHOOL ADDITION & RENOVATION **Rendering of building supplied by Gary Gardner with Owner Permission Penn State AE Senior Capstone Project Jeremy.
S PRING 2010 B UDGET UPDATE AND PROJECTION FOR THE P UBLIC S CHOOLS OF P ETOSKEY Kent Cartwright, CPA Chief Financial Officer Public Schools of PetoskeyMarch.
PRESENTED B Y B ARRISTER A LI K HAN& O WAIS A ZIZ, A TTORNEY.
AB Ellis Public School and Espanola High School Revitalization.
M R. N ELSON 4 TH - 5 TH DAEP T EACHER R OOM 129 | P HONE : E XT | E MAIL : MNELSO SPRINGISD. ORG Chet Burchett Elementary School 3308 James.
S TARTING H IGH S CHOOL F ROM 8 TH TO 9 TH GRADE 2012 – 2013 J UNE 11, 2012 Brian Wharton YHS Principal John Johnson RMS Principal Heidi Bunker YMS Principal.
S CIENCE AND T ECHNOLOGY C ENTER C OPPIN S TATE U NIVERSITY B ALTIMORE, MD P ENN S TATE A RCHITECTURAL E NGINEERING S ENIOR C APSTONE P ROJECT N ICHOLAS.
B ERKELEY C OUNTY S CHOOL D ISTRICT C AINHOY /D ANIEL I SLAND H IGH S CHOOL C ONCEPTUAL P RESENTATION April 24, 2014.
G RAND R APIDS P UBLIC S CHOOLS P HASE I P ROJECTS.
2012 A NNUAL S TATEWIDE A SSESSMENT AND A CCOUNTABILITY M EETING Accommodations.
O UR P HILLY K IDS Our Children Our Lives Our Lives Our Happiness Our Happiness Our Success Our Success.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
A DDING C OINS AND D OLLARS Ms. DeWitte’s First grade class.
Elementary School Standards-Based Report Cards
ADVISING PREPARATION WORKSHOP PRESENTED BY: STUDENT ACADEMIC SERVICES COLLEGE OF BUSINESS AND ECONOMICS TOWSON UNIVERSITY.
OSHA Federal Standards October 1, 2014 – September 30, 2015.
2 ● W HO NEEDS ACCESS ? ● R OLE OF I NSTRUCTIONAL M ATERIALS C OORDINATOR ● T YPES OF R OLES ● EMAT/EVI O RDERING A CCESS ● D ISTRICT V IEW O NLY A CCESS.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
OSHA Federal Standards October 1, 2014 – September 30, 2015.
SCSU T ECHNOLOGY U PDATE Dr. Kristi Tornquist Learning Resources & Technology Services Fiscal Year 2008.
R EVENUE D ISCUSSION F OLLOW U P & D IRECTION A GENDA I TEM 12.1 C ITY C OUNCIL M EETING A PRIL 20, 2016.
OSHA Federal Standards October 1, 2014 – September 30, 2015.
W ILLIAM A. R AWLINGS, C ITY M ANAGER “E STABLISHING A SOLID FINANCIAL FOUNDATION WHILE PRUDENTLY PLANNING FOR THE FUTURE ” J UNE 21, 2011.
Best 20 jobs jobs sites.
G REENWICH P UBLIC S CHOOL LIBRARIES RENOVATION Presented by Sue Trainor Susie T Designs.
DEVRY HRM 594 W EEK 7 C OURSE P ROJECT C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HRM -594/ HRM WEEK -7- COURSE -
UOP IT 205 W EEK 8 A SSIGNMENT H ARDWARE R EPLACEMENT P ROJECT C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -205/ IT -205-
STAYER CIS 500 W EEK 10 T ERM P APER I NFORMATION T ECHNOLOGY S TRATEGIC P LAN NEW C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD.
UOP COM 220 W EEK 9 F INAL P ROJECT P ERSUASIVE R ESEARCH P APER C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / COM -220/ COM.
UOP CRT 205 W EEK 5 A SSIGNMENT C ATEGORIZING F ALLACIES C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / CRT -205/ CRT -205-
UOP CRT 205 W EEK 8 E XERCISE R EVIEW Q UIZZES C HAPTER 12 C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / CRT -205/ CRT -205-
BUS 620 ASH C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM /BUS-620-ASH/ BUS ASH - COMPLETE - CLASS F OR.
EDU 626 ASH C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / EDU ASH / EDU ASH - COMPLETE - CLASS.
ESE 691 C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / ESE ASH / ESE ASH - COMPLETE - CLASS F OR.
PSY 330 W EEK 3 A SSIGNMENT F INAL P ROJECT O UTLINE F INAL P ROJECT O UTLIN R EVIEW THE F INAL P ROJECT GUIDELINES AND, USING THE APPROVED TOPIC THAT.
HHS 440 C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HHS ASH / HHS ASH - COMPLETE - CLASS F OR.
HHS 440 W EEK 1 F INAL P ROJECT T OPIC S ELECTION C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HHS ASH / HHS WEEK.
College Park Elementary School & Turnbull Learning Center
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series 1 Construction Update
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Troy School District Bond Program – Series 1 Construction Update
Topic A Grade 1.
Presentation transcript:

Columbia School District 2013 Bond Program

I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES P ROJECT C ONTACTS

P ROJECT S COPE R EVIEW C OLUMBIA C ENTRAL H IGH S CHOOL (BP 02) -R ENOVATE NEW 7 TH /8 TH GRADE WING -N EW ADDITION - L OCKER R OOMS -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT H.S. -N EW A RCHITECTURAL AND S CIENCE LAB CASEWORK -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY -S ITEWORK – ATHLETICS, PARKING, BUS AND PARENT DROP OFF AREAS

P ROJECT S COPE R EVIEW E LEMENTARY, I NTERMEDIATE, AND O PTIONS S CHOOL (BP 03) -R ENOVATIONS TO ACCOMMODATE GRADE LEVEL RECONFIGURATION -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT -R ENOVATE TOILET ROOMS -N EW CASEWORK -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY

T IMELINE B ID P ACK 02 – ( HIGH SCHOOL ) – B ID D OCUMENTS A VAILABLE W EEK OF O CTOBER 20, 2014 – B IDS D UE W EEK OF N OVEMBER 17, 2014 – B ID R EVIEW / P OST B ID I NTERVIEWS TO SUPPORT 12/1/14 AWARDS C ONSTRUCTION – 7 TH /8 TH G RADE W ING 12/1/14 – 4/6/15 (S PRING B REAK ) – L OCKER R OOM A DDITION S TART 3/30/15 – R EMAINING B UILDING S TART A FTER S CHOOL – A LL WORK S UBSTANTIALLY C OMPLETE F IRST W EEK S EPTEMBER 2015 FOR S CHOOL B ID P ACK 03 (E LEMENTARY AND M IDDLE S CHOOL ) – S TART IN SOME AREAS AT SPRING BREAK ( APRIL 2015) – B ALANCE OF WORK IN SUMMER 2015

T IMELINE

A NTICIPATED W ORK C ATEGORIES D EMOLITION S TRUCTURAL C ONCRETE M ASONRY S TRUCTURAL / M ISCELLANEOUS S TEEL G ENERAL T RADES R OOFING A LUMINUM / G LASS & G LAZING D RYWALL / A COUSTICAL / P LASTER R ESILIENT F LOORING AND C ARPET H ARD T ILE P AINTING AND C OATINGS L OCKERS I NTERIOR & E XTERIOR S IGNAGE / B ANNERS P LUMBING HVAC E LECTRICAL / F IRE A LARM E ARTHWORK AND U TILITIES A SPHALT P AVING / S TRIPING A THLETIC S URFACES / E QUIPMENT S ITE C ONCRETE F ENCING L ANDSCAPE / T URF & G RASS / P LANTINGS

Q UESTIONS & A NSWERS Question: Will there be a local preference for the bids? Answer: No, however the owner has the right to accept or reject any or all offers. Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can be reviewed on Granger FTP site. Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages? Answer: Separate packages Will this be a prevailing rate job? Answer: Yes Will certified payroll be required? Answer: Yes Will a bid bond be required in the amount of 5% be required? Answer: Yes Will a performance bond be required? Answer: Yes

C ONTACT I NFORMATION G RANGER C ONSTRUCTION C O. M ATT L ERG GRANGERCONSTRUCTION. COM D ENISE S TYX GRANGERCONSTRUCTION. COM W EBSITE HTTP :// RESTORETHESOARWITHGRANGER. COM /