EGR 312 - 191 Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

WBS-Construction of House (Example) WBS Dictionary
OPSM 639, C. Akkan1 Overview Planning Models Project planning determines what happens, when and how they happen. Since planning takes time and consumes.
Project Management 6e..
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
NEES Project Management Workshop June 16 June 18 1 Segment 3.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
Advanced Project Management - CPH
Project Management for Maximum Effectiveness
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Defining the Project Chapter 4.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Defining the Project (modified for 2015) Chapter 4.
OM480 Defining the Project Parameters – Work Breakdown Schedule (WBS) (With Material from the Text Authors)
Chapter 4 Defining the Project. NEED FOR DEFINING PROJECTS One Project, small Many small projects, or large one –Yes.
Project Management Session 7
Ch. 4 Project Definition.
1 AP/ADMS 3353 Lecture 2 Chapter 3: Organization: Structure and Culture Chapter 4: Defining the Project.
Project Management What is Project Management? Why do Project Management? Tracking project timing and cost. Managing project resources (people, materials,
Edward B. Farkas, Managing Director, Project Management Practice
Chapter 4 Defining the Project.
Defining the Project CHAPTER FOUR PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Project Management What is Project Management?
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Scope Management Chapter 5 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall5-1.
5-1Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Scope Management Chapter 5.
Chap 4 Defining The Project.
Scope Management Chapter 5.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
McGraw-Hill/IrwinCopyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. Defining the Project Chapter 4.
DEFINING THE PROJECT CHAPTER 4.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Geog 469 GIS Workshop Project Management.
5-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 5 Defining the Scope of.
Work Breakdown Structure Use and Demo
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days)
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Project Management Organization Scheduling 31 January.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Network Flow Problems Example of Network Flow problems:
Project Management Planning Techniques
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson PowerPoint Presentation by Charlie Cook The University of West Alabama Defining the Project Chapter.
Project Management 6e..
Project Management 6e..
Chapter 4 Defining the Project.
Project Management -- Defining the Project
WBS-Construction of House (Example) WBS Dictionary
Defining the Project Chapter 4.
Manajemen Industri Teknologi Informasi
DEFINING THE PROJECT CHAPTER 4.
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
Managing Services and Improvement
Defining the Project Step 1: Defining the Project Scope
Planning for Design Project
PROJECT PLANNING AND SCHEDULING BY: AMINATH SHAAYAN SHAHID.
Presentation transcript:

EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step 4:Code the WBS for the information system Step 5:Develop activities, cost, and schedule

EGR Step 1: Define the project scope Project Scope –A definition of the end result or mission of the project—a product or service for the client/customer— in specific, tangible, and measurable terms. Purpose of the Scope Statement –To clearly define the deliverable(s) for the end user. –To focus the project on successful completion of its goals. –To be used by the project owner and participants as a planning tool and for measuring project success.

EGR Project scope: Terms and definitions Scope Statements –Also called statements of work (SOW) Project Charter –Can contain an expanded version of scope statement –A document authorizing the project manager to initiate and lead the project. Scope Creep –The tendency for the project scope to expand over time due to changing requirements, specifications, and priorities.

EGR Step 2: Establish project priorities Causes of Project Trade-offs –Shifts in the relative importance of criterions related to cost, time, and performance parameters Budget–Cost Schedule–Time Performance–Scope Managing the Priorities of Project Trade-offs –Constrain: a parameter is a fixed requirement. –Enhance: optimizing a parameter over others. –Accept: reducing (or not meeting) a parameter requirement.

EGR Project management trade-offs FIGURE 4.1 Time Quality Scope Cost

EGR Project priority matrix FIGURE 4.2 TimePerformanceCost Constrain Enhance Accept

EGR Step 3: Creating the work breakdown structure Work Breakdown Structure (WBS) –A hierarchical outline (map) that identifies the products and work elements involved in a project –Defines the relationship of the final deliverable (the project) to its subdeliverables, and in turn, their relationships to work packages –Best suited for design and build projects that have tangible outcomes rather than process-oriented projects

EGR Hierarchical breakdown of the WBS FIGURE 4.3 from: Gray & Larson (2008). Project management: the managerial process (4th ed.) McGraw-Hill Irwin.

EGR How does the WBS help the PM? Facilitates evaluation of cost, time, and technical performance of the organization on a project Provides management with information appropriate to each organizational level Helps in the development of the organization breakdown structure (OBS), which assigns project responsibilities to organizational units and individuals Helps manage plan, schedule, and budget Defines communication channels and assists in coordinating the various project elements

EGR An Example … FIGURE 4.4 Project 09102: House Construction Site preparationExteriorUtilitiesInterior LEVEL FoundationExterior walls Landscape ElectricalHVACPlumbing

EGR Work packages A work package is the lowest level of the WBS. –It is output-oriented in that it: Defines work (what) Identifies time to complete a work package (how long) Identifies a time-phased budget to complete a work package (cost) Identifies resources needed to complete a work package (how much) Identifies a single person responsible for units of work (who)

EGR Step 4: Coding the WBS WBS Coding System –Defines: Levels and elements of the WBS Organization elements Work packages Budget and cost information –Allows reports to be consolidated at any level in the organization structure.

EGR WBS coding 09102: House Construction Site preparation Exterior Foundation Exterior walls Landscape Utilities Electrical HVAC Plumbing etc.

EGR Your turn … To start your project, you should define the WBS –What are the deliverables, subdeliverables, and work packages required to deconstruct Ware Hall? We will discuss these in class on Thursday.

EGR Step 5: Develop activities, cost, & schedule Activities developed from work packages –Identify distinct, separable tasks that have to be done to complete the work package –Associate a duration with each task –Identify resources required People Equipment Facilities –Identify “precedence” What has to happen before this task can be started?

EGR Recall our house example … Tasks that need to be completed for each work package, e.g. –Electrical utilities are installed in two main tasks Rough in electrical (and, after drywall is installed) Finish electrical –Other work packages are similarly decomposed into activities, as shown on the next slide

EGR Our example … Task Definition: Description Duration(days) Precedence Step A: Prepare site. 5- Step B: Build foundation. 8A Step C: Frame walls and roof. 15B Step D: Rough in Plumbing 12C Step E: Rough in Electrical 10C Step F: HVAC Venting 8C Step G: Drywall 11D,E,F Step H: Finish Electrical 5G Step I: Finish Plumbing 4 G Step J: Finish HVAC 2H Step K: Install Kitchen 8H,I Step L: Install Baths 14 H,I Step M: Paint 5J,K,L Step N: Landscape 5J,K,L

EGR Project Management Precedence Diagram Tasks must sometimes be performed in series, or may at times be performed in parallel. For the house example, let each node represent a project task/job. A D C B E F G H I J K L M N

EGR Project Management Timing – Gantt Chart Tasks and task durations are often represented as Gantt Charts. Task precedence knowledge is shown graphically on the time line. Task NameDuration Nov 6, 06Nov 13, 06 MTWTFMTWTF

EGR Project Management Critical Path A D C B E F G H I J K L M N

EGR Expediting/Crashing CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc… Can there be a reduction in indirect costs? Less overhead costs Less daily rental charges Bonus for early completion Avoid penalties for running late Avoid cost of late startup CPM addresses these cost trade-offs.

EGR CPM – Critical Path Method Example: Overhead cost = $5/day Step 1. Draw the precedence diagram

EGR CPM – Critical Path Method Enumerative Approach: Reduce job H by 1 day: Total cost improves by ________________ Reduce job A by 2 days: Total cost improves by ________________ Precedence diagram & critical path A D C B E F G H

EGR CPM – Critical Path Method (cont.) Reduce job A by an additional day and job B by 1 day?: Total cost improves by ________________ Reduce job A by an additional day and job C by 1 day?: Total cost improves by ________________ A D C B E F G H

EGR CPM – Critical Path Method (cont.) Evaluate combinations of reducing path and by one day. Overall improvement = ______________________________ A D C B E F G H