CEM-512 Value Engineering Highway Project: South Interchange.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Council Bluffs Value Engineering Workshop
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
2012 CSVA Conference VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Reconstruction of the Eads Bridge Highway Deck
City of Redlands Redlands Boulevard/Alabama Street/ Colton Avenue Revision to Intersection Improvement Plans January 17, 2012.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
CEM512 / 043; King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Value Engineering CEM512 Term.
9-2  Problem: a discrepancy between the current state – what actually is happening – and a desired goal – what should be happening  Undesirable situation.
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Phase 1: Preliminary Investigation or Feasibility study
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Sept., 2007 European CF&S Kick Off Meeting 1 Plan for a Value Engineering Study T. Lackowski.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Problem 1: Determination of Facility Types for Analysis.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
1 Introduction to Value Analysis Caltrans Delivers Value By Renee Hoekstra, CVS RH & Associates, Inc. for Caltrans.
Policy for New/Modified Access to Controlled Access Facilities.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
A Marketing Approach to Bridge Longevity All about being specifically wrong … while being generally right Presented by: Heinrich O. Bonstedt Executive.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Visit Our Website at: Click to edit Master title style.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Group 8 David Boley, Deneb Bosch, Nathen Miller, Thanh-an Sam
The I-465 West Leg Reconstruction Project
(Additional materials)
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
10 Stages Of the Engineering Design Process
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Cost Benefit Analysis.
Effective Meeting.
UAA-School of Engineering Civil Engineering Department
Colorado Avenue University of Colorado, boulder
115-Unit Mixed-Use Project (711 E
Presentation transcript:

CEM-512 Value Engineering Highway Project: South Interchange

CEM-512 Value Engineering Presentation Outline I.Introduction II.VE Job Plan III.Critique

CEM-512 Value Engineering  Connect Two Major Interstate Routes:  Northbound  Westbound  Construct and tunnel Northbound Interstate under the Main Railroad Tracks and East-West Interstate  Estimated Cost $ 1 Billion Project Summary Part I: Introduction

CEM-512 Value Engineering VE Study Objectives  Optimization of Cost Impact of Design Methods Decisions  Simplification of Highway System  Achievement of Grade Raise for Northbound Interstate Deep-tunnel Section

CEM-512 Value Engineering VE Team Chart

CEM-512 Value Engineering VE Team Achievements  Conducted 40-hour Task Team Study  Developed Cost/Worth Model  Generated 30 Creative Ideas, from which 10 Proposals and 5 Design Comments selected Proposals and 5 Design Comments selected For Further Evaluation & Development For Further Evaluation & Development

CEM-512 Value Engineering Principle Proposals  Elimination of Ramps A & B, Portion of Main Street, and Modification of Ramp C  Raising Profile of Major Northbound Interstate  Elimination of Ramp D  Review of Design of Local Channel Crossing and Elevating East-West Interstate over Channel

CEM-512 Value Engineering Principle Proposals (Cont ….)  Changing Structural Design Criteria for Elevated Structures.  Using Steel Sheet Piling in lieu of Slurry Walls  Using Strength & Load Factor Design Methods in lieu of Working Strength

CEM-512 Value Engineering VE Study Results  Initial Cost Savings $ 200 Millions  Follow-on Savings Estimates $ 3 Millions to $5 Millions each year, depending on alternative chosen for final design

CEM-512 Value Engineering Part II: VE Job Plan Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering Cost/Worth Model Information Phase

CEM-512 Value Engineering Summary of Cost/Worth Model Poor Value Item Cost ($ MM) Worth ($ MM) Main Lines N-S Main Lines E-W Ramp A Ramp B5.350 Ramp C Ramp E Ramp F

CEM-512 Value Engineering No. Proposal Description Initial Cost Saving ($M) Annual O&M Cost Saving ($M) Total PW Cost Saving ($M) C-1 Eliminate Ramp A 64,730064,730 C-2 Eliminate Ramp D 11,100011,100 C-3 Eliminate Main St. Over- crossing 9,13009,130 C-6 Raise Profile of N-S Interstate 69,4001,00079,400 Summary Potential Cost Savings

CEM-512 Value Engineering No.Description Initial Cost Saving ($M) Annual O&M Cost Saving ($M) Total PW Cost Saving ($M) C-10 Combine Ramps E & C 26,000026,000 C-11 Eliminate Ramp B 4,35004,350 C-12 Delete Main St. Connector C-19 Elevate East-West Interstate over Channel & Railroad Yard 145,4002,000165,400 Summary Potential Cost Savings (Cont … )

CEM-512 Value Engineering No.Description Initial Cost Saving ($M) Annual O&M Cost Saving ($M) Total PW Cost Saving ($M) S-1 Review Channel Crossing Design Comment S-2 Change Structural Design Criteria for Elevated Structure Design Comment S-3 Use of Steel Sheet Piling in lieu of Slurry Wall 29,400N/A29,400 S-4 Use of Strength & Load Factor Design Methods in lieu of Working Strength 45,600N/A45,600 Summary Potential Cost Savings (Cont … )

CEM-512 Value Engineering

Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering C-1 Eliminate Ramp A First Function Connect Westbound Interstate to Northbound Interstate  Original Part Scope Construct Ramp A under Local Road and Construct Ramp A under Local Road and Main Railroad Tracks and tunneling under railroad (undesirable and costly)  Alternative Eliminate Ramp A and Make Traffic using Local Avenue to Northbound Interstate Eliminate Ramp A and Make Traffic using Local Avenue to Northbound Interstate

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering No. Idea Description AdvantagesDisadvantages 1 Eliminate Ramp A, Use alternate Route Reduces Cost. Simplifies Left Exit. Avoids Long Tunnel under Railroad. Avoids Tunnel behind Sea wall Eliminates Free- Flow Ramp. Eliminates alternate Route if local avenue is congested Alternative Eliminate Ramp A and Make Traffic using Local Avenue to Northbound Interstate C-1 Eliminate Ramp A

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering Item Idea Description BeforeAfterSavingsTradeoff C-1 Eliminate Ramp A (6.5%) Eliminates emergency alternate LCC Savings will be achieved through elimination of tunnel ventilation, lighting and maintenance costs for 2,000 foot long tunnel and the total potential saving is estimated at $ 64.7 Million or 6.5 % of Total Project VE Cost Comparison ($MM): C-1 Eliminate Ramp A Life Cycle Cost:

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering 1)Department of Public Works feels that successful highway design must include movement from the west on E-W Interstate to the north on N-S Interstate in order to facilitate commercial activity 2)Because of implementation of another proposal that recommends raising N-S Interstate Profile, more direct and less expensive connection was made C-1 Eliminate Ramp A

CEM-512 Value Engineering

Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering C-6 Raise Profile of Northbound Interstate Second Function Carry Northbound Interstate  Original Part Scope Construct Northbound Interstate under Construct Northbound Interstate under Main Railroad Tracks  Alternatives 1)Raise Profile of Northbound Interstate over Railroad and East-West Interstate 2)Reroute Ramp C, combining with Ramp E

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering Alternative 1: Raise Profile of Northbound Interstate over Railroad and East-West Interstate C-6 Raise Profile of Northbound Interstate No. Idea Description AdvantagesDisadvantages 1 Raise Profile to pass over Railroad and E-W Interstate Reduces Cost. Easier/Faster to Construct Reduces Vent. Req. Permits Lower Profile for adjacent Northbound Interstate Elevated Structure Eliminates Two Local Streets. Reroute Two Ramps.

CEM-512 Value Engineering C-6 Raise Profile of Northbound Interstate Alternative 2: Reroute Ramp C, combining with Ramp E No. Idea Description AdvantagesDisadvantages 2 Reroute Ramp C, Combining with Ramp E Maintains Access, But Longer Distance. Avoids Conflict with Northbound Interstate Longer Ramp.

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering C-6 Raise Profile of Northbound Interstate VE Cost Comparison ($MM): No. Idea Description BeforeAfterSavingsTradeoffs C-6 Raise Profile of Northbound Interstate $ 105 MM 36.2MM $ 69.4 MM Remove Some Ramps (B, C & E) & Main Streets Life Cycle Cost: LCC Savings will be achieved through elimination of adjacent streets Northbound, main street, and Ramp B, and combination of Ramps C & E. Total potential saving is estimated at $ 69.4 Million or 6.9 % of Total Project

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering 1)Department of Public Works concurs with this recommendation 2)Although Main Street connection between Frontage Road & Albany Street is desirable and Main Street connection to Frontage Road would enhance design potential, savings realized is significant enough to warrant its approval C-6 Raise Profile of Northbound Interstate

CEM-512 Value Engineering

Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering S-4 Use Of Strength & Load Factor Design Methods  USE OF LOAD FACTOR DESIGN METHOD FOR SIZING CONCRETE STRUCTURE Savings = $ 16.8 Million  USE OF STRENGTH DESIGN METHOD FOR SIZING REINFORCEMENT Savings = $ 24.2 Million  USE OF LOAD FACTOR DESIGN METHOD FOR STRUCTURAL STEEL Savings = $ 4.6 Million Total Savings = $ 45.6 Millions

CEM-512 Value Engineering Part II: VE Job Plan (Cont … ) Information Speculation Evaluation Development Implementation

CEM-512 Value Engineering S-4 Use Of Strength & Load Factor Design Methods 1)Department of Public Works concurs with this requirement for all Bridge Structures whether steel or concrete 2)Use of Load Factor vs. Working Strength for Tunnel is currently under Review, although all indications suggest that Working Stress Design is favored 3)Department of Public Works has established that Working Stress Design will be used for Buildings

CEM-512 Value Engineering Part III: Case Study Critique 1)Lack Of Project Information Such As Size, Location, Purpose ….Etc 2)Inadequacy In Drawings And Specifications 3)Lack Of Explanation Of Why Certain Proposals Were Undertaken 4)Incomplete Picture Of The Remaining Accepted Proposals

CEM-512 Value Engineering THANK YOU