Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Cabinet and Countertop Installation
Zebra® 105SL™ * Removing and Installing Printhead
Fasteners Mr. Lombardi. Fasteners Mr. Lombardi.
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Adjustable Head Strap Instructions Step 1: To adjust the head strap hold goggle as above.
Service Technician Training
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Session 6 KY Type 4A End Treatment See “Shop Drawings” for Types FLEAT-SP Slide 6 by Road Systems SRT-27 Slide 47 by Trinity.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Session 4 KY Type 1 End Treatment ET-PLUS Slide 6 by Trinity Highway Products SKT-SP Slide 63 by Road Systems.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Session 4 KY Type 1 End Treatment ET-PLUS Slide 6 by Trinity Highway Products SKT-SP Slide 63 by Road Systems.
MyLock 644D Service Seminar.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Typical Walk-in Closet with elfa® décor
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Session 6 KY Type 4A End Treatment See “Shop Drawings” for Types FLEAT-SP Slide 6 by Road Systems SRT-27 Slide 49 by Trinity The KY Type 4A End Treatment.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
Steering Columns.
Handy Store Fixtures Gondola Dolly Assembly Instructions
Installation. Indoor Unit Installation Typical Installation.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
DECKS. Square Corner Framing square Square Corner triangle.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
Crashworthiness Simulation of ET2000 Guardrail Extruder Terminal.
Session 7 How Critical is it to Properly Install Guardrail End Terminals???
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Use original rear consol support/seat belt mountUse supplied console support bracket (front.) Unit Can possibly pop pocket off lower door. IF NOT,
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Assembly of steering.
VIEW SERIES with Sliding Door
STEP 1: ASSEMBLE ANGLE PLATES
Annex 4 - Moving Frame and Whiffletree assembly
Assembly Instructions:
Easycliner (Motorized Version) Assembly Instruction
STEP 1: ASSEMBLE ANGLE PLATES
2.2 Gallon TourTank Installation
Assembly instructions for M-K all bolt together hoppercone kit.
McMaster linear bearing #6709K180 with guide rail suppressed
Reader Swap out Guide.
Step 1:Disassemble battery case
Where to Use Warning Lines
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

Trinity Highway Products SRT-350 6 Post HBA System 37’6” System 4 Foot Offset Post 7 to Post 1

Trinity Highway Products Properly Installed SRT-350 6 Post HBA System-Slotted Rail Terminal KY 627 Winchester – Note Post 2 Installed with hinge properly downstream from the nose of the End Treatment

Installation Instructions http://www. highwayguardrail Link to obtain the Installation Manual

Shop Drawing http://www.highwayguardrail.com/products/pdfs/SS-352.pdf Link to obtain the Shop Drawing

Title Block Bill of Materials

Items to Watch for when Installing SRT-350 6 Post HBA System Install Post 2 so that the LARGER hole is placed DOWNSTREAM Guardrail is NOT attached (bolted) at Post 2 – Just the Flange Protector or Backup Plate is connected at Post 2 The Cable Anchor goes ABOVE the Strut NOT THROUGH the Strut

Post 3-6 CRT (Controlled Release Post) with 8” Offset Blocks Install the CRT Post with 3½” holes Approximately @ Finished Grade Note: Post 7 is also a CRT Wood Post 4’0” Flair Begin @ Post 7 face of Guardrail at Offset Block Measure 37’6” to the face of the Guardrail at Post 1 – no Offset Block at Post 1 & 2 (HBA Post) 4’0” offset is measured at Post 1

Installing HBA (Hinged Breakaway Post) @ Post 1 & 2 “No Offset Blocks” HBA Post are a “two” Section Post (top & bottom) Place the Bottom of the Post so that the LARGER (13/16”) hole is placed DOWNSTREAM (away from the End of the System) Attach the top portion with 2 – 3/8” bolt with washer & lockwasher under the nut Bolts should be installed so the head of the bolt is on the “inside” of the post plates

Installing HBA (Hinged Breakaway Post) @ Post 1 Place Post 1 so that the LARGER hole is placed DOWNSTREAM (away from the End of the System) Post 1 Note: Place the head of the bolts on the inside of the Post –washer, lock washer & nut on outside of Post

Cable Web plate @ Post 1

Installing HBA (Hinged Breakaway Post) @ Post 2 Place Post 2 so that the LARGER hole is placed DOWNSTREAM (away from the End of the System) Place the head of the Bolts on the inside of the Post - washer, lock washer & nut on outside of Post Post 2

Post 2 - Install Post so that the LARGER hole is placed DOWNSTREAM Correct Placement - Can Properly Hinge Incorrect – Cannot Hinge Installed Backwards Traffic

Post 2 -Place Post so that the LARGER hole is placed DOWNSTREAM Traffic Repair Incorrectly placed Post 2 Remove the Top of Post 2 and the Strut Bottom of Post 2 MUST BE REMOVED (note the bottom of Post is not symmetrical and therefore cannot be drilled) Properly backfill the hole Rotated bottom of Post 2 180 degrees and re-drive the Post Reattach the top portion of Post 2 and the Strut Incorrect – Cannot Hinge Installed Backwards

Installing the Strut Place 2 Angled Struts between Post 1&2 Post 1 attach with ¾” Bolt with Washer & Lockwasher under nut Post 2 – same as above plus stack 2-3 washers on the bolt between the Strut and the Post Plate to allow the Strut to pass over the 3/8” bolt head

Post 2 with Bolt Heads Placed Inside Post - Lacks Extra Washers between Strut & Post Plate Install 2–3 extra washers on bolt between strut & Post

SRT-27 Installing Rail Panels Layout the Guardrail so Slot Guard Attachment Holes @ the ends of the Slots (away from Post 1) Position Guardrail with Long Slots between Post 1&2 Post 2&3 Position Guardrail with Short Slots between Post 3&4 and Post 4&5 The Guardrail from Post 7 to Post 5 does NOT have Slots Post 7 is also a CRT Wood Post Guardrail is NOT attached to Post 2

Orientation of Slots, Slot Guards and Cable Anchor Bracket No Slots Short Slots Long Slots Long Slots between Post 1& 2 and 2&3 Short Slots between Post 3&4 and 4&5 No Slots between Post 5&6 and 6&7 Slot Guards @ end of slots away from nose of end treatment with deflector angle (raised end) closest to elongated slots Post 7 is also a Wood CRT Post Cable Anchor Bracket Connect to Wood CRT Post @ Post 7 Slot Guards Away From Post 1

Long Slots Between Post 2 & 3 and 1 & 2

Short Slots Between Post 4 & 5 and 3 & 4

No Slots Between Post 6 & 7 and 5 & 6

Installing Rail Panels Continued Guardrail is attached to the Post through the Offset Blocks @ Post 3, 4, 5 and 6 Guardrail is not attached (bolted) at Post 2 Incorrectly Bolted Correctly NOT Bolted POST 2

Post 2 has a Backup or Flange Protector Plate Cable Anchor Assembly At post location 2, bolt the backup rail panel (Flange Protector) to the HBA Top Post using a 5/8" x 2" (bolt, nut, and washer. The washer is installed between the post and the nut. Do not attach the rail to the post. The cable anchor bracket is bolted to the backside of the guardrail using eight (8) 5/8" x 1½ " hex bolts, eight (8) hex nuts, and eight (8) round washers. The round washers are installed between the bolt head and the rail panel on the traffic side.

Installing Rail Panels Post 1 Insert 5/8”x2” HGR Post Bolt thru the Rail Panel at Post 1 and secure with Hex Nut and Tighten Connect the End Section to the End of the Guardrail with four 5/8”x1 ¼” HGR Splice Bolts and Hex HGR Nuts Attach Reflective Sheeting Your Rail Panels are now attached

Post 1 - End Section Connected with Reflective Sheeting

Installing Cable Anchor Assembly - Bracket Place 5/8” Washer on each of the eight 5/8” Hex Head Bolts Insert the Bolts thru the Traffic Side of the Rail Panel and the Cable Anchor Bracket (on the backside of the Rail Panel) & Secure with Hex HGR Nuts Slide one end of Cable into Cable Anchor Bracket - Place 1” washer and Hex Nut on End of the Cable extending thru the Bracket

Front and Back of Cable Anchor Assembly Bolts & Washers (front) and Nuts (Back) Back of Rail Traffic Front of Rail

Install Cable Anchor Assembly – Post 1 Slide the other end of Cable between upper & lower sections of the HBA Post 1 On Post No. 1, bolt the 4"x5¾" x ¼” Cable Web Plate to the web of the post with a 3/8" x 1½” bolt, with a washer under the 3/8”nut. The Cable Web Plate should be pushing down on the top of the Shank of the Cable Anchor.

Cable Web plate @ Post 1 pushing down on the top of the Shank of the Cable Anchor Cable Web Plate pushing down on the top of the Shank of the Cable Anchor

Install Cable Anchor Assembly – Post 1 Place the Cable Bearing Plate with the open side of the V-Notch pointing upward and the Plate Washer on the end of the Cable. The bearing plate should rest on the top of the flange of the HBA bottom post.

Cable Anchor Assembly – Post 1 “V” Bearing Plate rest on top of Flange of bottom of HBA Post Correct “V” Notch Up Incorrect “V” Notch Down

NOTE: The Cable Anchor goes ABOVE the Strut NOT THROUGH the Strut Cable Anchor Correctly ABOVE the Strut Cable Anchor INCORRECTLY THROUGH the Strut

Properly Installed SRT-350 6 Post HBA System

Installation Instructions http://www. highwayguardrail Link to obtain the Installation Manual

Shop Drawing http://www.highwayguardrail.com/products/pdfs/SS-352.pdf Link to obtain the Shop Drawing

Items to Watch for when Installing SRT-350 6 Post HBA System Install Post 2 so that the LARGER hole is placed DOWNSTREAM Guardrail is NOT attached (bolted) at Post 2 – Just the Flange Protector or Backup Plate is connected at Post 2 The Cable Anchor goes ABOVE the Strut NOT THROUGH the Strut

Q & A Time Install Post 2 so that the LARGER hole is placed___________ from the end of the guardrail end treatment??? DOWNSTREAM

Q & A Time 2. The Cable Anchor goes ABOVE OR THROUGH the Strut???

Q & A Time 3. Guardrail IS or IS NOT attached (bolted) at Post 2??? IS NOT