LIGO-T0900637-V1 LIGO-T0900637-V1 (Fan Gasket Assembly) Fan Gasket for LLO Rack 6 20091216 David Kinzel 1.

Slides:



Advertisements
Similar presentations
New Mexico FFA Agricultural Mechanics Career Development Event Supplies and Materials.
Advertisements

Using the UCR WBF Sensor (this is a draft document, we welcome feedback corrections)
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
EMerge Browser Managed Security Platform Module 2 Hardware install.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Affordable Ownership: Filter cleaning example EMINTS -- Professional Development for Educators By Educators 
Mounting instruction – Hi-Fi-Series – HE-01 / HE-02 Specification : Color: black / silver Measurement: 445 x 460 x 135mm (w x d x h) Material: all-aluminium.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Welcome to Autoescorts Please Press F5 to view & Press Enter to change Slides.
© 2003 Swagelok Company MPC Series Modular Platform Components.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
"AIR COOLER" Heat Exchanger
Vibration Sensors for Cooling Towers Challenges Cooling towers offer the vibration analyst many challenges in sensor selection, mounting and environmental.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
MOONRAKER ANTENNA. 09 Juin 2006 AT-230 : HF MOBILE RADIO Frequency Range : Any frequency between 2-30 MHz Channel Capacity : Infinite between 2-30 MHz,
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Solar Car Data Collection System Matt Boyden Rene Dupuis Ryan Lavallee 4/23/08.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
SUPERCAM SINGLE PIXEL BLOCK MEASUREMENTS HAMDI MANI 09/12/2008.
University of Minnesota Unmanned Aerial Vehicle Research Lab Goldy Flight Control System Manufacturing Instructions.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
ALLEGRO G Z LSC, Livingston 23 March, Calibration for the ALLEGRO resonant detector -- S2 and S4 Martin McHugh, Loyola University New Orleans.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Candela Display Systems 3x2 Interactive Video Wall System.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Building a PC. Motherboard Selection Ensure the selected motherboard is appropriate for the processor model and frequency you are planning to use AMD.
New Mexico FFA Agricultural Mechanics Career Development Event Supplies and Materials.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
DESIGN PROCESS: DANCE PAD AND LIGHTS Phoenix Graves & Tyler Hummel.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Data Acquisition Device (DAQ) A DAQ is a cool little device that allows you to interface hardware to a computer. Here is what we will do:  Create a square.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Three Pin Coupling Assembly Grey – Upper Arm Red – Arm Interface Plate with Pins for Coupling Blue – Wrist Interface Plate with Receptacles Wrist – Not.
Genesis Technology USA, Inc. Heatsink Technologies November 2,
Fan Assembly Driven by Magnetic Fields
Installation Walkthrough Image Guide
The design of a photodetector unit of a new Shashlyk EM
ENGINE MODE CODES.
Integrated Circuits.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
nSW Alignment Installation
Easycliner (Motorized Version) Assembly Instruction
C Air Compressor Up-fit and Plumbing Guide For LDI B3
Hydraulic Arm Assembly Instructions
Wrapping Anodes Back To Basics
Wiring the Light and Relay
Self-sealing Cable Transit Panel Project Update
Clamping and Boring Tools
Fin & Countertop Sample Kit Instructions
 R2 Four Basic Components of a Refrigeration System #4 Metering Devices.
Presentation transcript:

LIGO-T V1 LIGO-T V1 (Fan Gasket Assembly) Fan Gasket for LLO Rack David Kinzel 1

LIGO-T V1 Fan Gasket Assembly – Motivation Robert Schofield has done previous work isolating and removing noise associated with the ventilation fans on LLO Rack 6. For details, see la.caltech.edu/ilog/pub/ilog.cgi?target_frame=content&task=view&date_to_view=08/06/2009&group=detector&keywords_to_ highlight=&text_to_highlight=&anchor_to_scroll_to=2009:08:06:00:40:33-robert la.caltech.edu/ilog/pub/ilog.cgi?target_frame=content&task=view&date_to_view=08/06/2009&group=detector&keywords_to_ highlight=&text_to_highlight=&anchor_to_scroll_to=2009:08:06:00:40:33-robert Robert recommended we attempt to find a more permanent solution, and this is the record of that attempt. A gasket was designed to replace the temporary fix that consisted of rubber tubing and packing tape. Criteria included the need to insulate the rack from fan vibrations while maintaining airflow. A thick, multi-layered gasket assembly was designed that provides a chimney for airflow while it provides for staggered rivet points that secure the fans to the gasket and the gasket to the rack. 2

LIGO-T V1 Fan Gasket Assembly – General Description The Fan Gasket Assembly consists of four rubber sheets that have starting dimensions of 24” x 12”. All four sheets are cut down to 20.75” x ”. They have the following thicknesses. A: 0.5” Polyurethane Rubber – 20A – McMaster-Carr PN 8781K561 B: 0.125” Polyurethane Rubber – 60A – McMaster-Carr PN 8716K526 C: 0.125” Polyurethane Rubber – 60A – McMaster-Carr PN 8716K526 D: 0.5” Polyurethane Rubber – 20A – McMaster-Carr PN 8781K561 These four sheets create a sandwich that is intended to decouple the vibration of fan motors from the surface to which the fans are mounted. (Note: In the following diagrams LIGHT GREEN is cutout material.) All four layers start with the same 0.125” hole pattern. Then Gaskets A and D have 0.5” holes added according to the patterns shown. (Note: This work was done by Elevating Boats LLC of Ponchatoula, LA. ) 3

LIGO-T V1 Fan Openings on Rack ” 8.625” r = 3.875” 8.625” 1” 8.125” ” 3.375” r = 0.5” 4

LIGO-T V1 General Fan Gasket Layout 5

LIGO-T V1 Fan Gasket Construction Concept A B C D 3/32 X 2 Cotter pin #6 Flat Washer Screws will not work due to the double-blind nature of the gasket. Cotter pins will work if gasket material is removed so they fit. This is the purpose of the 0.5” holes. 1)Making sure all Cotter pins and Washers are in place, mount BCD gaskets to Top of Rack. 2)Mount Fan flanges to remaining Cotter pins. 1/8 X 2 Cotter pin #8 Flat Washer Fan flanges Top of Rack 6

LIGO-T V1 Fan Gasket Layout – 0.5” Gasket A 18.75” 8.625” r = 3.875” 8.625” 1” 8.125” ” 3.375” d = 0.125” d = 0.5” ” 20.75” r = 0.5” 3.375” ” 3.375” Notched 7

LIGO-T V1 Fan Gasket Layout – 0.125” Gasket B (same as C) 18.75” 8.625” r = 3.875” 8.625” 1” 8.125” ” 3.375” d = 0.125” ” 20.75” r = 0.5” 3.375” ” 3.375” Notched 8

LIGO-T V1 Fan Gasket Layout – 0.125” Gasket C (same as B) 18.75” 8.625” r = 3.875” 8.625” 1” 8.125” ” 3.375” d = 0.125” ” 20.75” r = 0.5” 3.375” ” 3.375” Notched 9

LIGO-T V1 Fan Gasket Layout – 0.5” Gasket D 18.75” 8.625” r = 3.875” 8.625” 1” 8.125” ” 3.375” d = 0.5” d = 0.125” ” 20.75” r = 0.5” 3.375” ” Notched 10

LIGO-T V1 Tubing (Before) New Gasket (After ) Planned Installation on Rack 6 11

LIGO-T V1 Upward-facing Cotter Pin DetailDownward-facing Cotter Pin Detail Gaskets in place showing “chimney”Fans in place New Gasket Installation 12

LIGO-T V1 Two sets of before-and-after measurements were made. The before measurements were made when the tubing was still in place, and the after measurements were made after the new gasket was installed. One set of measurements used the DTT Fourier Analysis tool, and the other set used a Stanford Research SR785 Spectrum Analyzer. Certain hardware was common to both measurements. A Wilcoxon Model accelerometer was the sensing device. This accelerometer was firmly attached to a mount that had been epoxied to the top of Rack 6. The accelerometer interface cable was connected to an open input channel (channel 15) on one of the Isotron Model 2793 Amplifier Modules located in Rack 5. The accelerometer was covered during measurements. In order to measure using the DTT, the output of the Isotron channel was connected through a 10-1 voltage divider (1k Ω /100 Ω ) to L1:PEM-LVEA-TEST1, a test channel found at DAQIC-4, port 14. This test channel has 10x gain, and needed the voltage divider in-circuit to prevent clipping. In order to measure using the SR785, the output of the Isotron channel was connected directly to Channel 1, Port A of the spectrum analyzer. The analyzer was set to use an FFT Power Spectrum 1 measurement with RMS averaging on. New Gasket vs Tubing – Measurement Methodology 13

LIGO-T V1 New Gasket (After) Tubing (Before) New Gasket vs Tubing – DTT Measurement 14

LIGO-T V1 New Gasket vs Tubing – SR785 Measurement 15

LIGO-T V1 New Gasket (After) Tubing (Before) New Gasket vs Tubing – (DTT Log-Linear, Full Band) 16

LIGO-T V1 New Gasket (After) Tubing (Before) New Gasket vs Tubing – (DTT Log-Linear, Detail Around 230Hz) 17

LIGO-T V1 While the objective of having a more permanent solution to fan isolation has been met, the two sets of measurements agree as they show that the new gasket presents a minor difference in the source power spectrum, but that coupling is not greatly improved with this design. New Gasket – Conclusions 18