September 7, 2006EPOC Winter Workshop, 2006Slide 1 On Spring Washers, Constrained Dispatch, and Dispatch Model Sensitivity Andy Philpott Duncan Ashwell.

Slides:



Advertisements
Similar presentations
EPOC Winter Workshop, September 7, 2007 Andy Philpott The University of Auckland (joint work with Eddie Anderson, UNSW) Uniform-price.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Electricity transmission pricing: getting the prices “good enough”? Richard Green Institute for Energy Research and Policy.
Jump to first page National Instantaneous Reserves Market Vladimir Krichtal Transpower New Zealand.
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
1/22 Competitive Capacity Sets Existence of Equilibria in Electricity Markets A. Downward G. ZakeriA. Philpott Engineering Science, University of Auckland.
1 MondayTuesdayWednesdayThursdayFriday January February March April May
EIUG – Wheeling Methodologies
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Linear Programming: Fundamentals
EE 553 LPOPF J. McCalley 1. LPOPF The linear program optimal power flow (LPOPF) is functionally equivalent to the SCED, except whereas LPOPF implements.
Effects of the Transmission Network on Electricity Markets © 2011 D. Kirschen and the University of Washington 1.
EE 369 POWER SYSTEM ANALYSIS
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
IMO Market Evolution Program Drew Phillips Market Evolution Program
Nodal Pricing in an LMP Energy Market
Pricing and Gaming in a Simple electricity Market Queen’s University Regulatory Economics Class Guest Lecture March 24, 2015.
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
1 The Role of Sensitivity Analysis of the Optimal Solution Is the optimal solution sensitive to changes in input parameters? Possible reasons for asking.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Optimization for Operation of Power Systems with Performance Guarantee
EE/Econ 458 Introduction to Linear Programming J. McCalley 1.
Sensitivity Analysis What if there is uncertainly about one or more values in the LP model? 1. Raw material changes, 2. Product demand changes, 3. Stock.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Electric vehicle integration into transmission system
EPOC Winter Workshop, September 5, 2008 Andy Philpott The University of Auckland (joint work with Kailin Lee, Golbon Zakeri)
Cork June Dynamic modelling of transmission systems: costs of seasonal-zonal transmission loss factor charging and the impact of large-scale offshore.
MIT and James Orlin © Chapter 5. Sensitivity Analysis presented as FAQs –Points illustrated on a running example of glass manufacturing. –Also the.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Water Resources Development and Management Optimization (Linear Programming) CVEN 5393 Mar 4, 2011.
Peak Shaving and Price Saving Algorithms for self-generation David Craigie _______________________________________________________ Supervised by: Prof.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Transmission Reliability Program Review Market Monitoring Tools Bernie Lesieutre and Bob Thomas Lawrence Berkeley National Laboratory Cornell University.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
1 The Dual in Linear Programming In LP the solution for the profit- maximizing combination of outputs automatically determines the input amounts that must.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Sensitivity analysis LI Xiao-lei. A graphical introduction to sensitivity analysis Sensitivity analysis is concerned with how changes in an LP’s parameters.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
1 IMM Pricing Concerns with PFR and FFR Proposed pricing structure provides incentive for FFR to offer at less than cost. Dual clearing price pricing structure.
Sensitivity analysis continued… BSAD 30 Dave Novak Source: Anderson et al., 2013 Quantitative Methods for Business 12 th edition – some slides are directly.
Summing up1 ECON 4930 Autumn 2007 Electricity Economics Lecture 12 Lecturer: Finn R. Førsund.
VOLTAGE CONSTRAINTS AND POWER NOMOGRAMS © 2002 Fernando L. Alvarado May 28, 2002.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1 © A. Kwasinski, 2015 Cyber Physical Power Systems Fall 2015 Security.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
©The Marketplace Company Limited 1 APEx Conference 2006 Experiences in how to deal with market stress situations – New Zealand Carl Hansen – The Marketplace.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Analysing renewable power system development for a Pacific Nation
National Market for Instantaneous Reserves Scenario Analysis
Benefits of ICAP Reliability Economics
Flexible Forward Contracts for Renewable Energy Generators
penetration of wind power
LMP calculations Congestion evaluation
National Market for Instantaneous Reserves Phil Yao
Security of supply - deriving a winter energy standard using the DOASA model EPOC Winter Workshop September 2018.
ECEN 460 Power System Operation and Control
Pricing and Gaming in a Simple Electricity Market
EE/Econ 458 Introduction to Linear Programming
Presentation transcript:

September 7, 2006EPOC Winter Workshop, 2006Slide 1 On Spring Washers, Constrained Dispatch, and Dispatch Model Sensitivity Andy Philpott Duncan Ashwell Graeme Everett

September 7, 2006EPOC Winter Workshop, 2006Slide 2 Motivation Electricity Commission May 19, 2006 Discussion Document and submissions TP 36, June 19, 2006 gave a surprising result. Transmission constraints are likely to become binding more often. Are extremely high price spikes a sensible signal? What, if anything, should be done?

September 7, 2006EPOC Winter Workshop, 2006Slide 3 Summary What is a spring washer effect? What happened on June 19, 2006? Are there any other SPD surprises? What, if anything, should be done?

September 7, 2006EPOC Winter Workshop, 2006Slide 4 Spring washer effects Well documented – see Grant Read’s talk in last year’s EPOC workshop. Occur in loop transmission systems with a constrained link. Highest nodal price observed at the constrained end, and decrease around loop to lowest price at unconstrained end. Examples

September 7, 2006EPOC Winter Workshop, 2006Slide 5 Example Spring Washer ReactanceLossLimit A->B 0.010%1000 B->C 10%1000 A->C %100 AB C

September 7, 2006EPOC Winter Workshop, 2006Slide 6 AB C

September 7, 2006EPOC Winter Workshop, 2006Slide * * * = 0 AB C $

September 7, 2006EPOC Winter Workshop, 2006Slide 8 AB C $100 $200 $10200 Increase Load at C to MW Why? 100.1

September 7, 2006EPOC Winter Workshop, 2006Slide 9 AB C Increase Load at C to MW -10* * * = flows from A to C 0.2 must flow from B to C to supply demand at C Therefore 10 must flow back from B to A because… 100.2

September 7, 2006EPOC Winter Workshop, 2006Slide 10 AB C $100 $200 $10200 The difference in cost is… 0.1 more load at C gives more generation at B 10 less generation at A 10.1 x $ x $100 = $

September 7, 2006EPOC Winter Workshop, 2006Slide 11 AB C $998 $200 $100,000 Increase Load at C to MW This problem has no feasible solution 0.1 $100,

September 7, 2006EPOC Winter Workshop, 2006Slide 12 When the demand at C is , and  ≥ 0.1 Also  must be no more than 1.1 for this basis to be feasible. Indeed the dispatch problem is infeasible if  >1.1. So the range of loads for which the $10,200 price is valid is very small and close to infeasible.

September 7, 2006EPOC Winter Workshop, 2006Slide 13 Observations Prices are higher than the highest offer price. High prices caused by constraint binding, meaning perturbation in load involves more than one marginal station. Solution is close to infeasibility. Prices are all nonnegative here (but may be negative in some examples).

September 7, 2006EPOC Winter Workshop, 2006Slide 14 What happened at 17:30 on June 19 (TP 36)? Dispatch prices were high ($300-$400) but without binding transmission constraints. In final pricing run, market infeasible as insufficient generation and reserve offers to meet demand. Provisional prices with infeasibilities were very high. Solution feasible after relaxation of RHS of a security constraint, and 60s reserve requirement. $10,000 prices across the grid – significantly higher than highest offer and no binding transmission constraints.

September 7, 2006EPOC Winter Workshop, 2006Slide 15 June 19 provisional prices with infeasibilities

September 7, 2006EPOC Winter Workshop, 2006Slide 16 June 19 final price solution

September 7, 2006EPOC Winter Workshop, 2006Slide 17 Explanation of final prices All 60s reserve is fully dispatched. OTA is not fully dispatched for energy but is fully dispatched for energy and reserve together. HLY is fully dispatched and is sending power North. HLY reduces dispatch and thus provides reserve. OTA increases dispatch and decreases reserve which exceeds HLY reduction because of line losses. The difference gives extra supply at OTA, at some cost.

September 7, 2006EPOC Winter Workshop, 2006Slide 18 Illustration by example ReactanceLossLimit A->B 11%1000 AB B offers up to 500MW reserve at $100 Total other reserve = 205 MW at $0

September 7, 2006EPOC Winter Workshop, 2006Slide 19 Solution AB $54,500$55, Generator A dispatched at 205MW - sets the risk = reserve (205) Generator B is fully dispatched (its reserve is not dispatched) Why the high prices? $500 $50

September 7, 2006EPOC Winter Workshop, 2006Slide 20 Increase load at B by 1 AB Generator A dispatched at 304MW - sets the risk = reserve (205+99) Generator B is not fully dispatched, provides extra 99 reserve Change in cost = 99*500 – 100* *100 = 54,400 $500 $50

September 7, 2006EPOC Winter Workshop, 2006Slide 21 Increase load at A AB Change in cost = 100*500 – 100* *100 = 55,000 Generator A dispatched at 305MW - sets the risk = reserve ( ) Generator B is not fully dispatched, provides extra 100 reserve

September 7, 2006EPOC Winter Workshop, 2006Slide 22 Increase load at A some more AB xx x0.99x x This problem has no feasible solution x x >= x+x x <= 200

September 7, 2006EPOC Winter Workshop, 2006Slide 23 Sensitivity depends on loss factor  =0.01 Basis matrix

September 7, 2006EPOC Winter Workshop, 2006Slide 24 Inverse basis matrix is large

September 7, 2006EPOC Winter Workshop, 2006Slide 25 Remarks Basis matrix at optimality is close to singular. Small changes in RHS can lead to big changes in dispatch. This makes the range of loads giving high prices small. So accuracy in measurements is important – otherwise the effect is an artifact of noisy measurement and not a real effect. Effect in this case depends on an artifact of modelling reserve at a single NI node.

September 7, 2006EPOC Winter Workshop, 2006Slide 26 Nodal reserve AB For modelling convenience, reserve at B is allowed to cover risk at A. If called on the 100MW would lose 1% in transmission. 100

September 7, 2006EPOC Winter Workshop, 2006Slide 27 If reserve is nodal then AB 700+  -0.99x x x0.99x 700+  (495+  -0.99x)/0.99 This problem has no feasible solution for any  >0 (495 +  -0.99x)/0.99 +x 500+  /0.99 <= 500

September 7, 2006EPOC Winter Workshop, 2006Slide 28 Are there any other SPD surprises? $100 $500 AB CD 100

September 7, 2006EPOC Winter Workshop, 2006Slide 29

September 7, 2006EPOC Winter Workshop, 2006Slide 30 Line failure $100 $ AB CD 100

September 7, 2006EPOC Winter Workshop, 2006Slide 31 Add a security constraint $100 $500 AB DC 100

September 7, 2006EPOC Winter Workshop, 2006Slide 32

September 7, 2006EPOC Winter Workshop, 2006Slide 33 AB Renewables dispatched at 205MW Generator A is partially dispatched at 100MW Generator B is fully dispatched at 500MW $500 $ Are there any other SPD surprises? Add a constraint that nonrenewables <= 600 MW $495 $500

September 7, 2006EPOC Winter Workshop, 2006Slide 34 AB $500 $50 What are the nodal prices? With constraint that nonrenewables <= 600 MW $44550 $ Renewables dispatched at 205MW Generator A is partially dispatched at 200MW Generator B is partially dispatched at 400MW Change in cost = 100*500 – 100*50

September 7, 2006EPOC Winter Workshop, 2006Slide 35 Conclusions Changing the primal changes the dual. Basis matrix is nearly singular, so its inverse is large, giving large shadow prices. Sensitivity of outcomes to data. –Perturbing data to lower the price is not the answer. Is the infeasibility check sensible? –Why do Transpower use $100,000? –What happens when we cannot relax security? –How should we ration an infeasible solution? Is there a case for some demand-side bidding?