1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

CARTRIDGE SEAL INSTALLATION. CHECK PUMP SHAFT FOR BURRS CHECK GLAND BOSS FOR NICKS LUBRICATE SECONDARY SEALS SLIDE SEAL ONTO PUMP SHAFT ASSEMBLE PUMP.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Optical Manufacturing Solutions 1 Probe Assembly.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Tools Material Pre-Assembly Assembly Purpose Test 4/24/2015 JTOT Jet A – Thermal Oxidation Test Training Memphis Refinery Lab Tools Material Pre-Assembly.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Installation. Indoor Unit Installation Typical Installation.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Click on this image to open the full PDF document.
Series I Pump and Prep Pump Prior to removing the head, rotate the flag on the top of the motor so the piston is fully retracted. Remove thumb nuts.
A Manual for Repair and Maintenance Technicians 1ST STAGE.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
Fabrication of Fishtank Platform EAS 199B living with the lab.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Installation. Indoor Unit Installation Typical Installation.
Wheel Bearing Service. - Remove the cap using a flat head screw driver or pipe pliers. Careful not to damage the cap.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
Peregrine the Martian Lander Assembly Instructions Mission to Mars 2008.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Model 12 Intek Horizontal OHV
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
EnviroSCAN Flat Cap Probe Assembly, Normalisation & Installation Version 1.3 (01/03/2012)
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Rear end assembly.
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Assembly Instructions:
826YD 21/2”-10”.
HYBRID COOKTOP.
450 2½”- 3”.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
880V 21/2”-10”.
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
450DA 4”-10”.
Presentation transcript:

1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions During assembly, keep room relative humidity above 25% Monitor ESD events 3.The camera head may be used in UHV environments LBNL 1 CYCLOTRON RD BERKELEY, CA ASSEMBLYDRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DRAWN: N.ANDRESEN J. JOSEPH CHECK: DATE:

2 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: 1. Inspect Cu Block pads for flatness using a spare SiC Substrate 2.Attach to 2.75” CF Flange 3.UHV CLEAN 1 STEP 1:STEP 2: 1.Install Clock & Bias board by gently wrapping Flex Assy around Cu block – note lower mounting tabs for proper orientation. 2.Attach to the Cu block using 2 #6 Button head screws as shown. Do not tighten screw – C&B board should float in place. 2 AND OPPOSITE MNT HOLE Bare 1K-FS Cu Cooling BlockClock & Bias Board Installation UHV CLEANESD SENSITIVE

3 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP 3: Sensor/Top Board Installation 1.SENSOR mounted on the TOP Board can be damaged by ESD – Proper handling is extremely important from this point and in all following assembly steps.. 2.NOTE: Wire bonds are exposed on the component side of the TOP board assembly. 3.Install TOP board – set assembly, component side down and couple connectors to the C&B board connectors 4.Place a Diamond Insulator on each of the 4 Cu block fingers, and align it with the TOP board assembly with an appropriate pin (can be a screw, do not tighten) 5.Insert a 2-56 x 1” screw with a wide washer and nut attached, in each of the mounting holes of the TOP board to C&B board connectors (4x) and twist them in until the screw bottoms out into the C&B board connector, Be sure that the nut and washer are loose on the SiC side of the TOP board assembly. The screws will put the connectors into alignment. 6.Gently tighten all 4 of the nuts against the TOP board assembly. Using an open end wrench, slowly tighten all 4 nuts, rotating from nut to nut after ~ ½ turn per point, until the connectors are fully seated. 7.Remove all of the insertion screws, and return to the assembly tool kit 4 4x Diamond Insulator 5 4x NOTE: The connectors will come together very easily with the insertion tool – DO NOT FORCE. If there is resistance to the insertion, stop the process, separate the connectors and inspect for issues Measure the following: 1.R between the SiC and Cu Block 2.R between V SUB and VDDOUT 3.R between V SUB and GND 4.N EDGE to GND (J3 & J4, pins 84 & 85) 5.N EDGE to V DDOUT (J3 & J4, pins 84 & 83) 6.J3 & J4 Shell to Cu block 7.SiC to V DDOUT UHV CLEANESD SENSITIVE

4 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP 4: fCRIC Digitizer Board Installation 1.NOTE: Wire bonds are exposed on the component side of the fCRIC Digitizer board assembly. 2.Install fCRIC Digitizer board – set assembly, component side facing the Cu block, and couple connectors to the TOP board connectors 3.Set the fCRIC insertion tool on TOP board, aligned with the connector holes, and insert the attachment screws through the TOP board and tighten into the fCRIC connector jackscrew holes 4.Starting by hand, tighten the larger, socket head screws, applying pull evenly, until the connectors start to mate (they will be aligned by the previous step) 5.Finish seating the connector contact using a hex wrench. The connector will come together very easily with the insertion tool – DO NOT FORCE. If there is resistance to the insertion, stop the process, separate the connectors and inspect for issues 6.Remove all of the insertion screws, and repeat for fCRIC Digitizer board on opposite side of the assembly. If both boards have been installed, return the tooling fixture to the assembly tool kit 3 UHV CLEANESD SENSITIVE

5 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: Install TOP board screws (do not tighten), insulators, springs and spacers as shown. Successively snug each screw until all are lightly tightened. Then back-off each screw by one-quarter turn. Measurement the continuity between the SiC Top-Board and Copper cooling block which should be an open-circuit. The resistance from the SiC to the Heater bars should be open. STEP 5: Secure TOP board to Cu block Silicon-Carbide Top-Board 2x Belleville spring washers Copper cooling block Top-board Bus clamp Top-board Bus clamp screw Polyimide washers PTFE shrink tubing CVD Diamond spacer 0.5-mm Top-Board heater Copper bus UHV CLEANESD SENSITIVE

6 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP 6:STEP 7: Install fCRIC and C&B board FastenersInstall RTD sensors and Frame-Store shield 1.Install fasteners that are used to secure the fCRIC Digitizer and C&B boards to the Cu block. 2.Install spacers, washers, and button head screws to all 8 mounting locations before securely tightening the boards to the Cu block 3.Tighten securely after all fasteners are in place, NOTE: A spacer block is required between boards for the fCRIC Digitizer that mounts in parallel to the back face of the C&B board.. UHV CLEAN Frame Store Shield 1.Set Frame Store Shield Assembly into the imaging widow area on the top of the Camera Head assembly. 2.Lightly secure using 2-56 x ½ inch button head screws 3.Attach Kapton PT100 RTD (Minco #...) to the TOP board as noted. Bend the leads over the edge of the camera head and secure with a small piece of ½ inch wide Kapton tape. 4.Secure Heater wires in the same way. RTD Location ESD SENSITIVE Spacer 2x

7 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE:

8 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: Mount housing base Mount housing sleeve Mount housing cap and filter slide Insert filter Insert filter cover STEP N: Application Specific, Light Housing Installation

9 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP N+1: Immersion Probe Installation Information Immersion chiller probe Copper cooling block Lubricate probe and camera bore with a very thin film (~0.0005”) of Apiezon “N” cryogenic vacuum grease. O-Ring, 2-027, Silicone Immersion probe, Polyurethane retaining spring. Install onto camera after installing Immersion chiller probe and before making CF flange connection. Fill this void to limit the build-up of ice. Immersion probe installation. Install a lubricated (Apiezon “N”) Immersion probe into the camera bore to a point where the o-ring engages the probe body. Attached a hand operated vacuum pump to this port and apply vacuum until the probe is seated. No additional load should be applied to the probe for installation. To remove probe apply a minor gas pressure to this port. To remove a probe which has become jammed in the camera; fill the volume of this tube and the space between the probe and the copper cooling block with water, attach a hydraulic pump and apply pressure (if hydraulic fluid is used in the pump, a double acting hydraulic cylinder can be inserted between the pump and the camera to isolate the two fluids).

10 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: