[[Click on topic to view page]]

Slides:



Advertisements
Similar presentations
Dr. Ruth Collins TrinityHaus
Advertisements

Structural Steel Construction
CONSTRUCTION AND STRUCTURES – II MAJOR PROJECT
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
Timber Portal Frame Construction
Portal Framed Construction
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder
Erection of steel portal frame for warehouse Construction
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
Timber Framed Structures
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
S R T C O N S T R U C T I O N & S T R U C T U R E S M A J O R A S S I G N M E N T M A T T H E W S Q U I R E
Walls Ron Gatepain constructionsite.
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
PCI 6 th Edition Handbook History. Presentation Outline PCI history Notable modifications to the 6 th Edition General chapter by chapter overview.
Advanced Construction Technology
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Concrete Pre Cast Panel By Peter Spence ID:
WALL FRAMING Section 6 of AS 1684 relates to the regulations governing timber wall construction.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Class Day Seventeen.
 Project Delivery  Design Considerations  Lessons Learned.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Chapter 7 Metals.
Reinforced Concrete VS Steel
Rectangular framed structures
QuickWalls® strong. fast. simple.
STEEL FRAMED STRUCTURES Steel is a material which has excellent structural properties. It has high strength in tension and compression. It is the strongest.
Case Study – St Clair Park Village, Auckland, NZ
CONSTRUCTION AND DETAILING 1
Topic C1 Superstructures - walls
Major Assignment Construction & Structures SRT251 Lecturer: J.J. Ham Kylie Dalton
Building Types.
Prefabricated Timber Frame Construction
The ground must push up as hard as the building pushes down
PRECAST CONCRETE CONSTRUCTION
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
Wall and Ceiling Construction
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
1 HVACR116 – Trade Skills Structural Drawings. 2.
Roof and Ceiling Framing
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Chapter 43 Common Commercial Construction Materials.
Lecture 15 - Timber Wall Framing Example
Topic Today’s Objective
Name ________________ Unit 6/P7 – Environmental Implications (what do developers need to take into account when building) Noise Nearby Residents Hours.
Chapter 23: Structural Drafting
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Sprinkler Loads on Trusses
Sprinkler Loads on Trusses Educational Presentation.
Learning Outcome Lesson Objective
Learning Outcome Lesson Objective
Framed Buildings Plane Frames Space Frames Skeleton Frames.
Learning Outcome Lesson Objective
Prefabricated Timber Frame Construction
BUILDING TECHNOLOGY IN CONSTRUCTION
BUILDING CONSTRUCTION 1
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Wood structures Topic 3 Floor Framing
MATERIALS AND CONSTRUCTION I
Wood Structures Topic 6 Roof Framing Trusses
STRUCTURAL TIMBER FRAMING
THE CONCEPT OF LIGHT GAUGE STEEL CONSTRUCTION
Introduction The Gamma Bracing System
Masonry Bearing Walls.
ROOFS.
THE CONCEPT OF LIGHT GAUGE STEEL CONSTRUCTION
Introduction The Gamma Bracing System
Presentation transcript:

[[Click on topic to view page]]

BACK to main page next >> > environmental and Physical considerations > accommodations and security on-site > construction space and storage of materials on the site > special requirements based on the design plans and site environment > documentations and specifications e.g. building permit > plan drawings of Foundation system, Structural system, external envelope e.g. portal frame design - a clients engages an architect and consulting engineer who prepare structural design drawings of the portal frame and submit the project to the tender - the builder sub-contracts the structural steelwork to steel fabricator on the basis of the consulting engineer drawing - steel fabrication is started by following the detail shop drawings drawn by draftsmen > site set out, excavation, foundations, structural frame set up, external envelope system, internal finish next >>

Pre-fabrication considerations of off-site production BACK to main page Pre-fabrication considerations of off-site production > logistic - storage - transport - site - management > procurement - contract form - manufacture > motivation - costs - skills - project management > site assembly - site environment - labour - management > Design - rationalisation - standardisation - co-ordination - decisions next >>

Pre-fabricated metal ideal for roofing and walling BACK to main page Pre-fabricated metal ideal for roofing and walling STEEL Advantages - no waster material - capacity for long clear span - quick construction times Disadvantage - some reduction in thermal insulation - low thermal mass ( high temperature variation) - sound transmission may be problem is not detailed well next >>

[[Click on topic to view page]]

BACK to main page [[Click on image to start video]] next >>

Pre construction process BACK to main page Pre construction process architect engineer builder tender off-site fabrication fabricator Shop drawings Under construction process on-site construction steelworker Concrete panel labour Finish building next >>

Preparation of Pad Footing BACK to main page Preparation of Pad Footing Floating the bolts (Fig. C003) > hole excavated ready for concrete foundation > holding down bolts are then inserted and fixed to a timber base plate, which is same size as the steel base plate and holes are in the same position. > timber base plate fixed to a temporary timber frame > temporary timber frame fixed to correct level by pegged into the surrounding ground and held at the correct position > concrete can be poured around the bolts after level checked (Fig.C003) next >>

BACK to main page next >> Section Drawings of Pad Footing drawn by architect and engineer next >>

[[Click on topic to view page]]

Steel Portal Frame BACK to main page next >> > economic alternative to warehouse structure > To be effective a pitched roof portal frame should have as low a pitch as practical to minimize spread at the knee joint. > the connection to the column haunched at the knee joint to make the connection deeper and stiffer > the haunching can be fabricated by welding a I-section to the rafter, which is the most economic in steel fabrication. - Design by architect - Liasion with structural engineer - Tender documents - Quotes from steel fabricator - Shop drawings—accurate details by draftsperson - Fabrication—off site - erection of steelwork next >>

Base Plate of Steel Column BACK to main page Base Plate of Steel Column > steel base plae welded or fixed with bolted connection with angle cleats Column attached to Pad Footing > Large washer fixed to bolt to prevent pull out > holding down bolts set into the concrete foundation > non shrinkable grout filled void left below steel base plate > steel packing shims fixed under base plate at correct level > Base plate welded to bottom of column next >>

BACK to main page Stages of setting up stanchion next >>

BACK to main page [[Click on topic to view page]]

Apex Joint BACK to main page Stiffening at ridge of steel portal frame at apex joint > the junction of the rafter at the ridge is often stiffened by welding I-section haunching to the underside of the rafter > end plates welded to rafter and hauncing and bolted together << back next >>

Knee Joint BACK to main page Haunch to the steel portal frame at knee joint > The haunched connection of the rafter to the column can be fabricated by welding a I-cut section haunching to the underside of the rafter > the haunch length is usually of the order of 10%-15% of the span of the rafter > with the depth of the section at the haunch is about twice of rafter depth > web stiffener welded to top of column bolt connection from column to haunching << back next >>

Cross Bracing BACK to main page next >> secure the structural elements from wind loads avoid bending of the structural elements - resist lateral forces bracing between stanchion to stanchion Roof bracing next >>

[[Click on topic to view page]]

Precast Concrete Panel Advantage BACK to main page Precast Concrete Panel Advantage - good sound reduction - good fire resistance - loadbearing capacity - high thermal mass (less variation of temperture) Disadvantage - large amount of work required on-site - negerates waste on-site (drilling holes for services - units are heavy - high degree of finishing required on-site   next >>

Precast Concrete Panel - bolted to stanchion BACK to main page Precast Concrete Panel - bolted to stanchion -Typical shop drawing of panel details required   next >>

Lifting up Concrete Panel BACK to main page Lifting up Concrete Panel Standard concrete panels and units are stored ready for delivery Panel can be assembled around a frame or can from self supporting structure Mobile crane may be required next >>

BACK to main page Connection between stanchion and concrete panel

Steel Sheet Cladding BACK to main page next >> - Roof/wall sheeting: approx. 0.4mm thick - Made from zincalume (Zinc & aluminium coated steel) - Available in a variety of profiles, including traditional corrugated and concealed fixed products - Sheeting is usually ‘custom cut’ by the manufacturer to suit the requirements for a particular job - Spanning capabilities: roof: 1200mm – corrugated sheeting; 2700mm –stronger, deeper profiles walls: can be 25 – 50% greater than roof spans   Advantages - Cost effective - Lightweight - High structural capacity - Low maintenance - Consistency of quality - Zincalume steel: high solar reflectance qualities; rapid heat dissipation Disadvantages - Limitation to heights that can be reached by sheeting next >>

BACK to main page Steel Sheet Cladding next >>

[[Click on topic to view page]]

BACK to main page [ RETURN home] The construction of buildings. Volume 4, Foundations and sub-structures, steel frames, concrete, concrete frames, external walls of framed buildings, R. Barry , BSP Professional Books, 1992, c1986 Construction and Structures 2 Reading, Deakin university 2006 Roofing, Walling, Rainwater & Structural Products, Stramit Corporation Pty Ltd, may 2004 Barry Advanced Construction of Buildings, Stepen E & Christopher G, Blackwell, 2006 http://www.roger-bullivant.co.uk/web/products_services.htm, accessed 24.05.2006 [ RETURN home]