Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.

Slides:



Advertisements
Similar presentations
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Advertisements

The Steiner Hall Renovation is proudly brought to you by: UWSP Residential Living Staff & Students, UWSP Facilities Services, University of Wisconsin System,
Welcome to the Grafton Village Town Hall Meeting! March 14, :30-7:30 pm.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
Campus signage – Internal
EClassroom Standards The University of West Florida.
Greening Existing Homes 5. What You Need to Know? Clients: Buyers need guidance on upgrade possibilities and valuing of green features. Sellers need green.
Civil Engineering & Architecture 2.3 Residential Design.
ACCESSIBILITY: A CODE COMPLIANCE AND EXISTING CONDITIONS ASSESSMENT AND SURVEY OF THE LIMERICK TOWN HALL MAIN STREET LIMERICK, ME ttl-Architects LLC 28.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
MICHIGAN STATE UNIVERSITY OWEN HALL REFURBISHMENT RE-ENERGIZING OWEN HALL.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Housing Options for Engineering Students. State of the art facilities State of the art facilities LEED (Leadership in Energy and Environmental Design)
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Building Plans.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
Campus Board Meeting July 21, STUDENT HOUSING – PHASE I HIGHLIGHTS July 21, 2004.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Does Your Building Need an Upgrade?. The common signs that your building would benefit from a mechanical/control upgrade.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
OVERVIEW  Review of completed projects  Update on large construction projects  Update on remaining projects.
OVERVIEW  Review of completed projects  Update on large construction projects  Update on other miscellaneous projects.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Olson Hall Classroom Renovations Rooms 101, 105, 118, 125, 141, 163, 227.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Willard and DiLoreto Hall Renovation and Addition
OVERVIEW  Review of completed projects  Update on large construction projects  Update on other miscellaneous projects.
OVERVIEW  Review of completed projects  Update on large construction projects  Update on other miscellaneous projects.
OVERVIEW  Review of completed projects  Update on large construction projects  Update on other miscellaneous projects.
Prepared by: Joe Trause, Director of Facilities.  Projects Completed:  VHS Mechanical System Replacement – Phase 1  General Construction – Vestibules.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
OVERVIEW  Review of completed projects  Update on large construction projects  Update on miscellaneous projects.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
Preparing For A REAC Inspection Presented by: Patrick Ortiz Lead Housing Programs Analyst New Mexico Mortgage Finance Authority (505)
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
A HOUSE.
Effective Building Planning & Design
MACDONALD HOUSE CITY COMMISSION WORKSHOP / FEBRUARY 21, 2017
Capital Projects Requests
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Central Park West #5A.
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
The summer of 2018 and all the work that has taken place
Troy School District Bond Program – Series 1 Construction Update
Building Property Committee Meeting
Projects in the Pipeline
KOMPLEX Investors Report – Q
HUD 203(k) Renovation Loan Program
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series Construction Update
WES Renovation Update Photo Gallery
Troy School District Bond Program – Series 1 Construction Update
Stoughton Public Library
FARR’S BUILDING APARTMENTS
Authorizing ED to Reject Bid for Contract P01005C10
Presentation transcript:

Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.

General Construction & Renovation Work 1.Hazardous Materials Abatement 2.Entrance, Main Lobby & Elevator Lobby Renovations 3.Laundry Room & Student Lounge Renovations 4.Updates to Student Suites & Bathrooms 5.Resident Director Apartment Updates 6.Door Hardware & Access Control Scope of Work

Energy Efficiency & Infrastructure Improvements 1.Window Replacement 2.Mechanical (HVAC) System Upgrades 3.Electrical System & Lighting Upgrades 4.Improved Technology Access 5.Sprinkler System Installation Scope of Work

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Schedule Tower 4 Residence Hall Hazardous Materials Abatement DesignFall 2009 Abatement (Ph I & II)Summer 2010/2011 Building Renovations Design InitiatedMarch 2011 Design CompleteOctober 2011 Advertise for BidsNovember 2011 Bid OpeningDecember 16, 2011 Construction StartMay 2012 Construction CompleteJuly 2013 BUILDING OCCUPANCYFALL 2013

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour FIRST FLOOR LOBBY

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour FIRST FLOOR LOBBY

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour FIRST FLOOR LOBBY

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour FIRST FLOOR LOBBY

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour BASEMENT LOUNGE & LAUNDRY

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour BASEMENT LOUNGE & LAUNDRY

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour RESIDENT SUITES

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour RESIDENT SUITES

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour RESIDENT SUITES

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour RESIDENT SUITES

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour 10 th FLOOR LOUNGE

Tower 4 Residence Hall Building Renovations & Asbestos Abatement Tour 10 th FLOOR LOUNGE