Campus signage – Internal

Slides:



Advertisements
Similar presentations
Severe Weather. MLC Severe Weather WATCH: This announcement means that conditions in the area are favorable for a inclement weather. –Once a watch has.
Advertisements

Crescent Academy International
TREN Tern Abroad in Thailand Tao-Thong Campus Hotel Burapha University Bang Saen, Chonburi Thailand.
Drydock Inside Lobby. Hallway into Party Room Lobby Chandelier.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
September 21 Update. Future Main Entrance (looking south)
MONSON TOWN HALL / MONSON POLICE BUILDING UPDATE 5/21/2014.
Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.
Crisis Action Plan Troy University Police Department Dothan Campus.
Community Update James Simons School – October 2,
University of Oregon Lewis Integrative Science Building Schematic Design October 21, 2009.
Identifying Information: Common Areas - 1 none LEVEL 2.
What is Hill Street Station?  Joint effort of The Cornerstone Project (Town Square) and Downtown Green Lake Renewal Project  Focus is to create a MAJOR.
N Shelter Area Scharbauer Hall2855 Main Drive In case of fire or evacuation please exit the building and go to your gathering point west of the Frog Fountain.
Cleveland State University, Division of Capital Planning Connecting Cleveland October 2010.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
Building Plans.
Schematic design presentation School of Business South Hall Renovation.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Welcome to the Vermont Nuclear Decommissioning Citizens Advisory Panel Meeting May 28, 2015 Brattleboro Union High School, Brattleboro, VT Multi-Purpose.
Design Development Review
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Elevations McMillan Villas May 30th 2015.
Grady Emergency Room Visit -Janani Venugopalan -PhD Student Biomedical Engg.
POV Renovations November 14,2014. Repairing the East Wall.
North Augusta High School Design Development Presentation.
Learning, Health, and Safety Capital Project Alternates and Change Order
Our Home in Panama Progress as of 2/19/2009. Our Island! Our House.
TRIbeca Turn Over Units. Tower 1 Chelsea Place Elevator Hallway.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
COZYEON Residence Main facilities gallery. Corridor of each floor.
SIZE - Top SERVER ROOM Designed by – openbox |
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
Tainan trainstation Hotel Tainan Da syue Rd. Linsen Rd. Sec. 2, Beimen Rd. Chenggong Rd. La Plaza Hotel Department of Aeronautics and Astronautics Shangri-La’s.
DC Office of Cable Television, Film, Music & Entertainment Angie Gates, Director Proposed Transition Marquee Branding.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Welcome Revised Evacuation/Seek Shelter Team (ESS)  To review procedures at least twice a year with our group.  To work in conjunction with.
Campus Kiosk Project Fall, 2009 University Technology Fee Advisory Board & College IT Administrators.
Special Mention: Copley International Conference Center Upper Level Southeast: Inaccessible Element.
Make Best Purchasing of Home Lifts from Vertical Access in North Carolina
肝臓移植
Hinjewadi New Project Gera Adara.
Traditional English houses
Signage Upgrade Project 2016
Special Mention: Main Gymnasium Second Floor East: Technically Inaccessible Entrance Problems
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
FRESNO COUNTY WEST ANNEX JAIL
Penn Medicine Chester County Hospital
Columbus State Community College
AARNA Progress Report-June 2017
High Museum of Art, Atlanta
Thatch House (Plan) Fig.4.
Steam Plant Rehabilitation Building and Smokestack
South 6th Street 6th Avenue 5th Avenue
Mathematics Unit 45: Twisted Building
Around the room Orders of operations.
Omnilore at Beach Cities Health District
North Augusta High School – Phase 2A and 2B
BUILDING LIGHTING PLAN PHASE II
1.
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

Campus signage – Internal

Lobby North Entry – Hallway to Main Tower First Floor Hallway – North Entry to Main Tower

Emergency Room Signage – Main Tower to East Pavilion

Internal Emergency Room Signage I Main Tower

Internal Emergency Room Signage – East Pavilion Signage intersection of Main Tower Hallway and East Pavilion Entrance

Internal Emergency Room Signage – East Pavilion East Pavilion Hallway

Internal Emergency Room Signage – East Pavilion First Floor East Pavilion

Internal Emergency Room Signage – East Pavilion Signage outside emergency room and by East Pavilion elevators

Internal Emergency Room Signage – East Pavilion Signage by first floor elevators East Pavilion