GEOPAK Bridge. Instructors Steve Atkinson Bill Politte Kevin Vollet (573) 751-5651 (573) 526-4447 (573) 526-5176.

Slides:



Advertisements
Similar presentations
Child Care Case Management System. Welcome to CCMS Training.
Advertisements

Roadway Intersection Design In GEOPAK Site
GEOPAK Road For Bridge Chapter 5.7 COGO Bridge Deck Elevation Commands.
WELCOME BACK TO CROSBY And welcome to U. S. History.
GEOPAK Road For Final Bridge Design. Instructors Paul Boenisch Alexa Mitchell.
PARCC Testing 2015 INFORMATION NEEDED TO ADMINISTER THE PARCC EXAMS.
Greater Atlanta Job Fair A Volunteer’s Guide to the Job Fair.
WHATIFCOURSE INTRODUCTION. Schedule Begin 9:30 am, end around 6 pm Lunch around 12:30 pm every 2 hour break short lectures end of course Thursday evening.
Wednesday 12 th.October 2005 ‘IT and Computing - skills needs and training opportunities in South Yorkshire’ Hillsborough Barracks was completed in 1854.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
My Trip To The. We will drive to the Curious Kids’ Museum.
Clinical Orientation. Scrubs and Appearance Scrubs should be: ●clean ●free of wrinkles ●matching ●fit properly ●Hair back (bangs too) Shoes should be:
GEOPAK Corridor Modeling
My Trip To The. We will drive to the Center for Children and Families.
Welcome Future Dental Assistants!. About Maumee Valley Dental Assisting School State Board Approved : Reg. # T State of the art facility Classes.
Math TLC Tutor Lab Overview: All sections of Math 010 and 110 are taught in a single, dedicated, technology-enhanced classroom that is adjacent to a.
TAKE EXIT 38 FROM I-84 Westbound TAKE EXIT 39 FROM I-84 Eastbound.
ELECTRONIC DESIGN DATA MANAGEMENT. Directory Structure (GEOPAK Road Manual Chapters 1 & 2) MicroStation/GEOPAK files are stored in the t drive under t:\de-proj\county_designation\jobnumber.
Morning Arrival 9:00-9:15 BREAKFAST Children who eat breakfast at school may enter the building at 8:50. Please drop them off at 8:50 so they can go to.
Services ComputersUpstairs mezzanine Please see registration desk for access information Copy/print & fax assistance Front desk Pay phoneFront desk Courtesy.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Start Job. Purpose Creates File Directory Structure for the Project Copies MicroStation Default Files and Sets their Global Origin Copies and Renames.
An Architect works to make designs for new buildings and the spaces around them. Working closely with users, clients and officials to make sure that projected.
© Roke Manor Research Limited 2004 Version 3 NSIS Interim Meeting: Welcome!
My Trip To The. We will drive to the Center for Children and Families.
My Trip To The. We will drive to the Center for Children and Families.
February2014 Seattle February2014 February º.
ROADWAY GEOMETRIC DESIGN Instructors: Alexa Mitchell Kevin Vollet
S – 443 Infrared Interpreter for Incident Management.
Superelevation. Shaping Shaping is the process of placing complex shapes into a design file to represent an area of pavement slope. Shapes can be either.
S. V. Benson, FLS 2012 March 5, 2012 Stephen Benson Some Logistics.
GEOPAK Road For Preliminary Bridge Design. Instructors Steve Atkinson Bill Politte Kevin Vollet Chris Schwandtner (573) (573) (573)
GEOPAK Corridor Modeling Roadway Designer. File Names dtm - This is the Digital Terrain Model in the InRoads format, a DTM includes stringlines representing.
1 SharePoint 2013 Advanced Training Accelebrate Except as noted, all content copyright © by Accelebrate.
2014 OpenSpecimen Meeting Washington University School of Medicine St. Louis, MO.
GEOPAK for Construction. Instructors Kevin Vollet (573) Bill Politte (573) Alexa Mitchell(573)
Geopak for MoDOT Right of Way & Location Survey Plans.
Map Types. Globe vs. Map Depending on the information you are attempting to gain insight on you would need to decide on which picture representation you.
UPMC Mercy Hospital address: 1400 Locust Street, Pittsburgh Link to google directions:
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Effective HIV & SRH Responses among Key Populations in Myanmar October 2014 Summit Parkview Hotel, Yangon.
make send do make take make/take But now I have to learn how to use a camera. have to can’t has to have to can’t can don’t have to.
Department of Energy and Environment Green Zone Environmental Program (GZEP)
A Volunteer’s Guide to the Job Fair. Morning Shift  Report at 7:30 a.m.  Park in the staff lot  Meeting with Volunteer supervisor at 7:45 a.m.  Mid-morning.
Quarknet Vanderbilt University July 2016
Welcome to DAU 6175 Guardian Gateway
Greater Atlanta Job Fair
AGENDA SCHEDULE Day/date of visit here: Thursday, September 7, 2017
ANNUAL JSC SPACE SETTLEMENT DESIGN COMPETITION
Career Resource Center
SharePoint Foundation 2010
Example’s Venturing Training Conference
Fans & Heaters Technical Seminar
Chapter 1: Introduction
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Chapter 1: Foundations of Geometry
Digital Security & Privacy
NEW MEDICAL FACILITY BUILDING
KUMC Core Area Map 2016.
Agenda Registration 8.30 am Welcome and Introductions 9.00 am
Introduction to Bridges.
To log into CareerLink.
[Your name] [Your company]
1. Coach and car park spaces available in the car park opposite the entrance to the Castle. Toilet facilities are available here cost 20p coin .
Project Management Tools and Techniques
Face-to-Face on campus training sessions have been scheduled for Canvas. Training will be conducted by Wendy Bass, the DE Coordinator at Pierce. This 8-hour.
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Digital Security & Privacy
Course Schedule Day 1 Day 2 8:00 AM - 9:30 AM 9:30 AM - 9:45 AM
Presentation transcript:

GEOPAK Bridge

Instructors Steve Atkinson Bill Politte Kevin Vollet (573) (573) (573)

Instructors Steve Atkinson Bill Politte Kevin Vollet (573) (573) (573)

Facilities Restrooms at either end of hallway Break room at “upper” end of hallway Coffee & refrigerator through the door to left Parking – Parking out front – Adjacent lots – MoDOT cars can use Garage

Schedule Begin at 8:00 a.m. Go until 3:30 p.m. +/- 1 hour lunch – 11:30 a.m. +/- Finish Wednesday mid-afternoon or around 3:30

Class Overview Intro to ProjectWise Setting up a new GEOPAK Job – Start Job (Chapter 1 & 2) Introduction to GEOPAK (Introduction) – Starting GEOPAK – Setting Up cadduser Preferences Accessing an Existing Project – Project Manager (Chapter 3)

Class Overview Coordinate Geometry (COGO) & Plan Design - Classic Coordinate Geometry Dialog (Chapter 4) - Graphical Coordinate Geometry Dialog (Chapter 5) Existing Conditions – Digital Terrain Modeling (Chapter 6) Plan Design – Existing Ground Profiles (Chapter 7) – Proposed Vertical Alignments (Chapter 8) – Superelevation (Chapter 9)

Directory Structure PW > MoDOT > Classroom – District XX > Bridge > – # - cadduser number on the base of monitor cadduser01 cadduser02 cadduser03 cadduser04 cadduser05 cadduser06 cadduser07 cadduser08 cadduser09 cadduser10 cadduser11 cadduser12 cadduser13 cadduser14 cadduser15

GEOPAK Road 1