Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.

Slides:



Advertisements
Similar presentations
Remembering When A comprehensive program developed by the National Fire Protection Association, NFPA, and the Centers for Disease Control and Prevention.
Advertisements

Smoke Detectors Save Lives Install smoke alarms in every sleeping room, outside of each sleeping area and on every level of your home Test your smoke detectors.
HJ S Properties 717 West Main Street, Ashland, WI Apartment Inspection Report - January 2012 Complete by Richards Management – Donald Richards CEO.
Biology Mrs. Teater 1st Block Fall Semester 2013.
Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009.
Berwickshire High School Presentation compiled 15 th October 2009.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
STI Test Facility: Photos Taken in Test Area and Two Labs: 18 May 2006.
Boren School Preparing an existing wall to receive structural improvements.
The Metamorphosis of Sierra Hall 180 Tenant Improvements by Tenacity Summer 2003.
Quarterly Report September 9, I Lafayette Elementary - New flooring.
State of Wyoming Capitol Upgrades and Renovation projects Photos of the skylight and lighting project will be shown in chronological order, followed by.
2013 FINANCIAL REPORT. Balance Sheet Summary As of December 31, 2013.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Disabled Platform Access There are two designated parking bays immediately outside the front of the main college building. Disabled access both into the.
6 th Grade Lunch Procedures. Lunch Bell Students with a 5 th period class upstairs should drop their things in their 5th period room, and line up for.
Re-introduce yourselves to the new members of your form Revise the day to day school procedures Task 1 – Icebreaker activity Click here to choose an icebreaker.
Ion trap system RETRAP 1. the journey 2. the pictures 3. the platform 4. the plans Danyal Winters.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
Remembering When A comprehensive program developed by the National Fire Protection Association, NFPA, and the Centers for Disease Control and Prevention.
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
As you walk into the front door: view into dining area and kitchen. This apartment has vinyl plank flooring in the living and dining areas and the kitchen.
Classroom Safety. Staff Responsibility  Supervise the children at all times.  Maintain at least the minimum adult-child ratio.  Develop safety limits.
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report Security Lockers / locks CPTED Requirements Labor needs Yard Sale 30/30 Executive.
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
ACU LIBRARY Click to view the slides ….. B Level – Ground floor Circulation Reference Information Commons Library Staff Toilets.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
An Architect works to make designs for new buildings and the spaces around them. Working closely with users, clients and officials to make sure that projected.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Visit on Friday 15 th March Still a building site – due to open in August.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Title The Future of Fire Risk Management Practical Fire Risk Assessment & the Future.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
MOORE HIGH SCHOOL.  Drills are a first and important step in keeping schools safe and secure. They are filled with teachable moments!
Work Progress Photos From 1 ST To 15 TH NOV 2015.
Let’s learn to prevent disaster
Our Home in Panama Progress as of 2/19/2009. Our Island! Our House.
Hogan Residence Basement Bath Addition Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition Upstairs Bathroom Remodel.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Lock change and lock box photo requirements All rights to this document are reserved by North Georgia Services. Following this procedure will ensure that.
By Arsh Sodha, and Maxim Skorodinsky A TEENAGE GIRL IS BABYSITTING TWO CHILDREN AT NIGHT TIME WHEN THE PARENTS ARE OFF AT A PARTY.
By Amy Hansen. Stage Seating Stage Dressing Room Prop Room Area for relaxing and last minute practicing.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
I am going to The Spa Bridlington with. This is what The Spa looks like.
University of Houston Passage measurements and ½ inch width 79 and ½ inch height Elevator cabin measures 56 ½ x 79 ½ inches.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
A HOUSE.
Turner Sims - stage layout WITHOUT ORGAN
IFM Hazard Hunt Fahud 13th March 2017
Lounge Closely Seated Permitted Persons 80
Remembering When A comprehensive program developed by the National Fire Protection Association, NFPA, and the Centers for Disease Control and Prevention.
,
Visit on Friday 15th March 2013
SCALING & REPLICATING AN IMAGE INTO A DRAWING.
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Commonly Know as Board of Health
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Post Construction Cleaning services are in huge demand these days. Most of the people living in major cities are finding it hard to hire a Post construction Cleaning service .Moreover, if you are selecting a Post Construction Cleaner from reputed cleaning
Fire Emergency Respond
Presentation transcript:

Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009

The Auditorium is a finished product on the left. Below: Middleton's preparing the carpet. They definitely got their exercise going up and down the stairs.

The preparation of the light wall and hallway carpeted

The completed light wall. Providing the light to the learning spaces for students.

Installation of the lift and Adam from Connelly Construction was more then happy to be our test dummy and have the first go.

The completed lift. Left, upstairs and ground level on the right.

Front streetscape works. Seats, lights and boulders installed.

Cleaning up after completing the streetscape works.

Harry from Connelly Construction inspecting the plaster work

Maintenance Man Graham, cleaning up the downstairs hallway and classrooms ready for a busy Term 3.

Harry from Connelly Construction fitting in the door handles and locks.

Completed toilets. We must admit, the ladies has the best view in the house (left)

The stairway to heaven is now complete

The emergency exit stairs arrive and are installed. After a few complications of unloading onto the wet ground and the weight of the stairs they were up and ready for an emergency.

End The next and last group of photos will be the champagne, party hats and streamers at the Official Opening – Yippee.