Centerville Elem. School Beverly, MA Front entrance
New wing
Back of new wing with clerestory and photovoltaics
Clerestory in new wing halls
Audicafeterium
Facing stage
Stage
Old wing
Hallway in old wing Old wing gutted to frame Cinder block walls in old/new Tile pattern matched in both wings
Gymnasium
Library w/ reading nook on left and computer room in rear
End of new wing – wind turbine on left
Retention pond captures rain runoff from roof
Hallway of old wing Library on left, entrance on right
Reading center
Classroom
Cubbies for kids – storage for teacher
Kindergarten
First grade
Centerville E-School Add/reno of 1964 school Town didn’t want cost of new school Capacity: 300 K- Grade 5 Enrollment: 300 kids Construction cost: $9 million New wing, gutted restored old wing Done in one year kids moved to another school
Green innovations Automatic room lights Ambient light compensating lights Clerestory Double-glazed windows Photovoltaics Wind turbine
Green innovations, cont. Photovoltaics – supply part of power (enough for lights) Wind turbine – in wrong location; doesn’t supply power MTC funding SBA refund – 85% of construction cost