Boren School Preparing an existing wall to receive structural improvements.

Slides:



Advertisements
Similar presentations
Hallmark w/Onsite Built Garage.
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
FLOOR COLLAPSE PROP. COMPLETE FLOOR COLLAPSE PROP DIMENSIONS: 48” W, 48” H, AND 8’ L. CONSTRUCTED OF PALLETS, 2X4s, AND PLYWOOD WE ARE GOING TO MAKE ANOTHER.
September 21 Update. Future Main Entrance (looking south)
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Here is an office or den.. You see a desk with computer on top and a big chair.
It costs no more to build a house with a good plan, than one with a poor plan…….in fact, it may cost less.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Elevations.
Mobile Dental Clinic Pictures of Example Units Prepared by: Bruce Sites.
By: Robbie Newman. Total Square Feet: 1474 sqft Front Rear.
Understanding Floor Plans
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
It costs no more to build a house with a good plan, than one with a poor plan…….in fact, it may cost less.
Pre-Proposal Meeting for Architectural Services
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
12/14/2011AEG Associates for the LTC Discussion Group  Presentation by Albert E. Graf, AIA AEG Associates, Annapolis, MD Building a Home Considering Universal.
Objective 1.03: Explain ways to adapt housing to meet special needs.
Construction of Buildings to Prepare for Earthquakes What structures are needed to prevent serious damage ?
Elevations McMillan Villas May 30th 2015.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
POV Renovations November 14,2014. Repairing the East Wall.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Objective 1.03: Explain ways to adapt housing to meet special needs.
Space Planning Objective Grouping by FUNCTION 0 When designing the layout of a house, rooms with similar functions are usually grouped together.
DRAUGHON COMMUNITY ROOM Welcome to the
TRIbeca Turn Over Units. Tower 1 Chelsea Place Elevator Hallway.
Photo Tour of Building an Earthship 11 Sep 1999 – 2 Nov 2011 Section 1.2 by Ron and Joy Oliver.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Smrha-Monroe Family Pictures of the House August 2005.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Facilities for a Quality Child Development Program Child Services II.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
CHAPTER 1-HOMES & INTERIORS UNIVERSAL DESIGN. WHAT IS UNIVERSAL DESIGN? Universal Design Def.- A philosophy of designing interiors and products to accommodate.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Kitchen and Bathroom Design
Wilson Addition. Wilson Addition.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Assembly And Installation Of Ikea Kitchen Cabinets
ECONOMICS OF BUILDING DESIGN
Single Family Homes Townhouses Condominiums Mobile Homes Rentals
How To Modernize Your Kitchen? Is your kitchen out of date and ready for an interior design makeover? Getting the most out of the most used space in your.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
1 Building 178 – Aug Rosecrans St. Truxtun Rd.
Paging Lecture November 2018.
Both D bathrooms and e kitchen What makes you special!
Kitchen and Bathroom Design
RISER PROJECT L, m, l/m kitchen.
G kitchen What makes you special!
J bathroom/ hi bedroom/ I kitchen
Multifamily Trends in new construction
C bathroom/AB and B Kitchens
Minuteman Vocational Technical Regional High School Progress

Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Objective: Develop plans for kitchen cabinets.
Minuteman Vocational Technical Regional High School Progress

Avera St. Luke’s Therapy Addition January 2012 Update
Presentation transcript:

Boren School Preparing an existing wall to receive structural improvements

Boren School Plywood applied to existing wall for structural improvement

Boren School Beginning to frame kitchen area of the Child Care space

Boren School Kitchen area of the Child Care space framed and sheet-rocked

Boren School Cabinets ready for installation in kitchen area of the Child Care space

Boren School New ADA ramp under construction at north building entry

Boren School Landing and walkway poured at new ADA ramp at north building entry

Boren School New ADA ramp near completion at north building entry

Boren School Ceiling lowered in hallway to conceal structural improvements

Boren School Near completion of lowered ceiling in hallway