Bus rapid transit (BRT) – the basics Presentation originally by Dennis Hinebaugh, Director National Bus Rapid Transit Institute (NBRTI), University of.

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

Development of Bus Rapid Transit (BRT) in Africa Experience from Lagos, Accra and Kampala.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
East Bay Bus Rapid Transit Project Description August 11, 2011.
9/7/2012 MBS UU.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
MAXIMIZING THE AIR QUALITY BENEFITS OF BUS RAPID TRANSIT Walter Hook, BAQ Conference Agra, India, December, 2004 Funded by the US Agency for International.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
Briefing on Cape Town’s Integrated Rapid Transit System 2009.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
Civil & Environmental Engineering Lessons About Sustainable Transportation Peter Furth, Northeastern University Prof. of Civil & Environmental Engineering.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
2 $ Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash CTA Station.
Lec 31, Handout: Public passenger transport (objectives) Be familiar with mass transit classifications and characteristics Know how urban transport demands.
BUS RAPID TRANSIT (AS PART OF ENHANCED SERVICE PROVISION) Workshop 2 1.
Electronic Fare Collection CEE582. Vehicle-Based Systems (Fixed-Route) Exterior Route and Destination Announcements Electronic Destination Sign Vehicle.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
Goal: 10,000 interactions in 2015 –Extensive civic engagement Goal: To develop a great regional transit system –Update every five years –All options considered.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
BRT as a Precursor of LRT? Lyndon Henry Data Analyst Capital Metro Austin, Texas TRB/APTA Joint Light Rail Transit Conference Los Angeles 20 April 2009.
Freedom to work Freedom to text Freedom to read.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
CIVITAS ELAN Open Academy Ljubljana 16 April 2010 Eric N. SchrefflerTom Rye, PhD Transport ConsultantNapier Edinburgh San Diego, California, USAUniversity.
Alasdair Cain & Jennifer Flynn National Bus Rapid Transit Institute Center for Urban Transportation Research University of South Florida Mark McCourt &
Rapid Transit System Steering Committee Meeting December 4, 2012.
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
Strategic session: Challenges for Sustainable Mobility in Cities 21 st April 2008 New solutions for collective transport in cities: fuelling Bus Rapid.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
South American Scanning Tour Bill Vincent Breakthrough Technologies Institute.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
: Research Question: Would ridership needs in the area of the Mid-Coast Corridor Transit Project be better Served by the implementation of a Bus Rapid.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
1/30/03 Page 1 Rescue Muni’s Recommendations for Geary Rapid Transit For PAR 1/30/2003.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
© 2007 Noblis, Inc. BUS RAPID TRANSIT AS A CATALYST FOR LAND USE CHANGE: THE ROUTE 1 CORRIDOR CASE STUDY 11th TRB National Transportation Planning Applications.
1 Development of a Regional BRT System Proposal Presented to the TPB Access for All Committee April 23, 2009 Michael Eichler and Monica Bansal Transportation.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
7 May 2014 Sustainable transport vision for Greater Cairo.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
City of Alexandria, Virginia Crystal City Potomac Yard Transitway Montgomery County Rapid Transit Steering Committee April 30,
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
TRB/APTA 2004 Bus Rapid Transit Conference The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
MODULE 3: PLANNING & DESIGN Lesson 2: Modal Characteristics and Impacts.
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Tapping Transit to Transform a Thoroughfare
Bus Rapid Transit Study
D Line Project Overview
Recommendations to improve the performance of Bus Rapid Transit projects Oscar FARINA (Argentina) – Mathieu LUZERNE (France)
Presentation transcript:

Bus rapid transit (BRT) – the basics Presentation originally by Dennis Hinebaugh, Director National Bus Rapid Transit Institute (NBRTI), University of South Florida Presented today by Tom Rye, Edinburgh Napier University

What’s wrong with normal buses? Slow Unreliable Not always frequent Take the long way around Uncomfortable Untrendy, not technologically appealing Make you feel like a loser if you take one? BRT – tries to solve these problems Slow Unreliable Not always frequent Take the long way around Uncomfortable Untrendy, not technologically appealing Make you feel like a loser if you take one? BRT – tries to solve these problems

Well! Badly! How we treat BRT customers! How we treat local bus customers!

BRT Systems United States: Alameda, CA Alameda, CA Albany, NY Albany, NY Boston, MA Boston, MA Charlotte, NC Charlotte, NC Cleveland, OH Cleveland, OH Chicago, IL Chicago, IL Dulles Corridor, VA Dulles Corridor, VA Eugene, OR Eugene, OR Hartford, CT Hartford, CT World: World: Curitiba, Brazil Curitiba, Brazil Brisbane, Australia Brisbane, Australia Adelaide, Australia Adelaide, Australia Ottawa, Canada Ottawa, Canada Leeds, England Leeds, England Amsterdam Amsterdam Utrecht Utrecht Kent, England Kent, England Ipswich, EnglandIpswich, England Rouen, France Rouen, France Jonkoping, SwedenJonkoping, Sweden

It’s no single trait, but the combination of traits that make BRT systems successful! [ ]

6 Speed of BRTs in km/h

Infrastructure Needs to give priority to bus Does not all have to be the same – one BRT can combine different types of priority Key: ensure speed and reliability – bus protected from other traffic Needs to give priority to bus Does not all have to be the same – one BRT can combine different types of priority Key: ensure speed and reliability – bus protected from other traffic

Arterial Bus Lanes Boston: Silver Line London Quality Bus Corridor

Arterial Median Transitway Vancouver: 98B

E-5 CEVİZLİBAĞ MEVKİİ ESKİ HALİE-5 CEVİZLİBAĞ MEVKİİ YENİ HALİ The Balkan BRT – before and after

Running Ways Arterial Median Busway Rouen, France: TEOR

LEEDS/BRADFORD Guided Busways

Elevated Sections Elevated Sections Runcorn, UK

Running Way Color, Markings Paris Sao Paulo Auckland

Route Structures More direct than local service More direct than local service “Off-line” stations “Off-line” stations Anchored by major activity centers Anchored by major activity centers Major corridors Major corridors Feeder routes Feeder routes Can operate in low-density residential Can operate in low-density residential Flexible Flexible High frequency, turn up and goHigh frequency, turn up and go Effect on Land use Effect on Land use No map No map

ADELAIDE CBD Adelaide, Australia

Stations: Potential Characteristics Differentiated from regular bus stops Differentiated from regular bus stops Enhanced shelters and/or station design Enhanced shelters and/or station design Designated passenger “platform,” possibly raised Designated passenger “platform,” possibly raised Enclosed Enclosed Can be multi-modal Can be multi-modal Other facilities (taxi stands, parking, etc.) Other facilities (taxi stands, parking, etc.) Customer information (real-time) Customer information (real-time) Joint-development/multi-use Joint-development/multi-use Facilitates quick boarding and exit Facilitates quick boarding and exit Docking Docking Disabled accessible Disabled accessible

Vehicles Unique/distinct aesthetic design/look Unique/distinct aesthetic design/look Environmentally friendly Environmentally friendly Variable propulsion systems Variable propulsion systems High capacity (articulated, bi-articulated) High capacity (articulated, bi-articulated) Wide aisles, increased passenger comfort Wide aisles, increased passenger comfort Low-floor Low-floor Large window design Large window design Increased amenities (laptop connections) Increased amenities (laptop connections) Multiple double-wide doors Multiple double-wide doors Dual-sided entry/exit Dual-sided entry/exit LRT like LRT like

Range of BRT Vehicle Options: Conventional Buses Range of BRT Vehicle Options: Conventional Buses Van Hool 300AG ZuidtangentAmsterdam; York Rapid Transit Toronto New Flyer 60LF Vancouver 98, 99B Ottawa Transitways

Specialized BRT Vehicles Specialized BRT Vehicles Irisbus Civis Las Vegas MAX ATS Phileus Eindhoven, Netherlands

Well- Lit, Open, Quiet Interior

Los Angeles, CA Signal Preemption and low floor vehicles aided in a: 28 to 33% decrease in travel time 28 to 33% decrease in travel time 30% increase in ridership, 14% net new 30% increase in ridership, 14% net new No appreciable impact on cross–street traffic No appreciable impact on cross–street traffic

Faster Fare Collection Fast, efficient so as to speed boarding Fast, efficient so as to speed boarding Simple to understand Simple to understand Minimal on-vehicle transactions Minimal on-vehicle transactions Cashless Cashless smart cards (multi-use) smart cards (multi-use) pre-purchased tickets pre-purchased tickets passes passes Proof of payment Proof of payment enter station enter station

Off–Board Fare Collection Options Proof-of Payment: TVM York, On. Rapid Transit Smart Card Fare Gates TransMillenio, Bogota

Cost Effective Vehicles Vehicles can be off-the-shelf can be off-the-shelf No track or overhead wires No track or overhead wires “Travel Ways” “Travel Ways” construction and maintenance construction and maintenance incrementally built (phases, flexible) incrementally built (phases, flexible) existing roadway network (mixed traffic) existing roadway network (mixed traffic) Uses existing vehicle storage facilities Uses existing vehicle storage facilities Uses existing and simple signal systems Uses existing and simple signal systems Workforce composition Workforce composition using existing vs. acquiring new staff using existing vs. acquiring new staff wage differential for BRT vs. LRT wage differential for BRT vs. LRT

Rapid Transit Mode Comparisons Source: SpeedLink- A Rapid Transit Option for Greater Detroit. June 2001.

Rail-Like Vehicles $5-30 m

Another take on costs

Impacts on ridership, car use Survey of 14 BRT systems around world Typically 15-35% increase in system ridership 10-25% of these people transferred from car Istanbul system carries 500,000 people/day of whom about 10% came from car. 400% increase in total PT riders See s%20CBRT%202009%20Update.pdf Survey of 14 BRT systems around world Typically 15-35% increase in system ridership 10-25% of these people transferred from car Istanbul system carries 500,000 people/day of whom about 10% came from car. 400% increase in total PT riders See s%20CBRT%202009%20Update.pdf

BRT quick to implement – politically attractiveBRT quick to implement – politically attractive Does not always have to be heavily engineered – can combine a range of infrastructureDoes not always have to be heavily engineered – can combine a range of infrastructure Can be implemented incrementallyCan be implemented incrementally Ultimately it’s about reliability, directness, convenience, premium service, good imageUltimately it’s about reliability, directness, convenience, premium service, good image Low cost, high capacity alternative to railLow cost, high capacity alternative to rail Keep It Simple StupidKeep It Simple Stupid Conclusions