1 Asian Region Mechanical Design ILC Mechanical & Electrical Review Masanobu Miyahara /KEK Atsushi Enomoto /KEK Masahito Huse /Nikken Sekkei 2012/3/21.

Slides:



Advertisements
Similar presentations
Heating, Ventilating, and Air-Conditioning
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Five star hotel in Nablus
Stem Challenge Energy management systems, CHP, Harvester tank, green roofs and underfloor heating. 1.
Components of HVAC System
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Introduction Topic: The Basic Ground Source Heat Pump Name: Matthew Stoangi Objective: To provide a clear understanding of the mechanics involved in the.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
How a Heat Pump Works By: Adam Meeker. What is a Heat Pump? A heat pump is a device which transfers heat energy from one place to another.
Drugs Addicts Rehabilitation Center
Prepared by : Abd Aljabbar Rabaya Ammar Salloum Sameh Shawahni Supervisor : Dr. Eyad Assaf 1.
N O R T H A M E R I C A C O M M E R C I A L TDP
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
HEATING AND COOLING SYSTEMS
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC Utility Design Study for Kitakami-site
Update on the PSB Cooling and Ventilation Systems
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Detector Utility/Service Cavern
Americas KlyCluster Cost Analysis Overview
Heating, Ventilating, and Air Conditioning
Detector Service Cavern for ILC
Detector hall in mountain regions
Status of Cryogenics Facilities Design
COOLING & VENTILATION INFRASTRUCTURE
Air Conditioning System − 2
Heating, Ventilating, and Air-Conditioning
Cryogenic cavern in Asian site
Detector hall in mountain regions
FBE03: Building Construction & Science
Mechanical Systems Design for Al-Bahrain Hospital
Mechanical Systems For Al-Zakah Hospital
Presentation transcript:

1 Asian Region Mechanical Design ILC Mechanical & Electrical Review Masanobu Miyahara /KEK Atsushi Enomoto /KEK Masahito Huse /Nikken Sekkei 2012/3/21

2 Content ① Cooling Water System ② HVAC System ③ Plumbing System Summary ILC Mechanical & Electrical Review2012/3/21

3 Scheme Change Image ILC Mechanical & Electrical Review Asian Region Mechanical Design Previous Scheme by DRFS Latest Scheme 2012/3/21

4 New Scheme Kamaboko Tunnel ILC Mechanical & Electrical Review Asian Region Mechanical Design Cooling Warter pipe Chw pipe Fan Coil Unit Groundwater Drainage Ditch 2012/3/21

5 Cooling Water System Heat Load Summary ILC Mechanical & Electrical Review Cooling Water Load Total 200MW Air + CHw Load 2012/3/21

6 Cooling Water System 3 Types of Cooling Tower A: Closed-circuit Type (Air-cooled) B: Closed-circuit Type (Water cooled) C: Open Type (Water cooled) ILC Mechanical & Electrical Review -IN RDR, we adopted Air-cooled type Cooling tower -Makeup water Issue in Mountainous area 2012/3/21

7 Cooling Water System 3 Types of Cooling Tower Makeup water for 200MW cooling - WE (Evaporation)=288m3/h - WC (Carry over) =47m3/h - WB (Blow down) =241m3/h Reservation of Makeup water Groundwater =1m3/km/min*30km*60min/h =1,800m3/h Total =WE+WC+WB =576m3/h ILC Mechanical & Electrical Review2012/3/21

8 Cooling Water System Comparison of Cooling Tower Type ILC Mechanical & Electrical Review RDR SchemeTDR Scheme 2012/3/21

9 Cooling Water System 2-Loop & 3-Loop System 1 st Loop To separate the 100m=1MPa water pressure to the 2 nd Loop 2nd Loop D.I. Water Stainless steel Piping 3rd Loop D.I. Water Stainless steel Piping 2nd Loop Galvanized steel Piping ILC Mechanical & Electrical Review 2-Loop System 3-Loop System 2012/3/21

10 Cooling Water System Comparison of 2-Loop and 3-Loop 2-Loop System3-Loop System Cost (AH-3) 3,423M\2,943M\ Water leakage If there would be some troubleat the thin pipe around accelerator, 5km(total 650m3) de ionized cooling water would be run over. Evaluation △ ○ ILC Mechanical & Electrical Review2012/3/21

11 Cooling Water System 3-Loop LCW System (AH-3) From ground level to access hall L ≒ 1000m ⊿ H ≒ 100m De-ionize filter De-aerator Stand-by (back-up) ILC Mechanical & Electrical Review2012/3/21

12 Cooling Water System 3-Loop Chw System ILC Mechanical & Electrical Review Turbo Refrigerator 2+1(standby) 2 nd -Loop 3 rd -Loop In case of AH-3(5km) 2012/3/21

13 COP (Coefficiency Of Performance ) the rating point =7.0 Cooling Water System Inverter turbo refrigerator COP at the midterm =up to 20.0 ILC Mechanical & Electrical Review2012/3/21

14 HVAC System Tunnel Ventilation System in RDR It’s difficult to make Chevron We need to change the scheme ILC Mechanical & Electrical Review 2012/3/21

15 HVAC System Tunnel Ventilation System D ≒ 2m ILC Mechanical & Electrical Review Exhaust FanAir Handling Unit Sloped tunnel About 1,000m 2012/3/21

16 HVAC System Tunnel Ventilation System Outside air Heated or Cooled by Air-handling Unit Exhaust Exhaust FanAir Handling Unit 2012/3/21 ILC Mechanical & Electrical Review

17 HVAC System Tunnel Ventilation System Smoke exhaust Quench exhaust Exhaust FanAir Handling Unit Fire !! Fire !! Helium Quench !! Helium Quench !! 2012/3/21 ILC Mechanical & Electrical Review

18 HVAC System Tunnel Ventilation Rate 0.5m/s×16m2×3600 =28,800m3/h 28,800m3/h÷(16m2×5000m) = 0.36N/h 0.5m/s×12m2×3600 =21,600m3/h Beam Tunnel High velocity (>1.0m/s) cause vibration ! ILC Mechanical & Electrical Review Velocity < 0.5 m/s Service Tunnel 2012/3/21

19 HVAC System Typical Tunnel Section Plan Mesh grounding LCW PIPE R4000 R7000 Maintenance space Chw PIPE Fan Coil Unit 3 rd Loop Cooling Water Skid 2012/3/21 ILC Mechanical & Electrical Review

20 Plumbing System Drainage System ILC Mechanical & Electrical Review Cooling water leakage : to the DP tank for RI monitoring Ground water : Amount of Springwater 1t/km.Min. → 30t/min. 43,000t/day 2012/3/21

21 Plumbing System Water Supply and Drainage System Drainage System Ground water is running through the ditch Leaked cooling water is pumped up to access hall ILC Mechanical & Electrical Review 2012/3/21

22 Plumbing System Water Supply and Drainage System Water Supply System Source of potable water is city water Source of Makeup water is ground water ILC Mechanical & Electrical Review 2012/3/21

23 Cooling Water System - Use the open type Cooling Tower System - Use 3-Loop System ( ⊿ t=11 ℃ ) - Inverter Turbo Refrigerator is used to make CHW HVAC System - Air Ventilation is through the Duct in Access tunnel - Ventilation in ML tunnel is “Duct-less”, 0.5m/s Velocity - Fire Smoke is extracted to the surface through AH,AT. Summary (1) ILC Mechanical & Electrical Review Asian Region Mechanical Design 2012/3/21

24 Plumbing System (water supply) - City water is used for the potable water. - Groundwater is used for the makeup water of CT. Drainage System - Groundwater is flow down to the Access Hall through the Drainage ditch under the Service Tunnel. - Leaked Cooling Water to the DP tank for RI Monitoring We need more detailed study by the time next meeting in Korea Summary (2) ILC Mechanical & Electrical Review Asian Region Mechanical Design 2012/3/21