Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.

Slides:



Advertisements
Similar presentations
Parliamentary Portfolio Committee Presentation Annual Report 2012.
Advertisements

Pollutant Valuation Cost Containment Calculation of Damaged Assets Eddie Leung Secured Environment.
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Application of cavitation jet technique to operating nuclear power plant September,12.
Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
Japanese Nuclear Accident And U.S. Response May 17, 2011.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
IT’S NOT OVER YET! THE FUKUSHIMA FACILITY IS STILL LEAKING RADIATION INTO THE AIR DAY 14 MARCH 25, 2011 Walter Hays, Global Alliance for Disaster Reduction,
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Facts and Tasks at Fukushima Daiichi August 2012 Skilled Veterans Corps for Fukushima.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
【機密性2、機構内限り 】 Phase to start waste management Main RN OriginWaste typeWaste quantity Site/Operator/ Intention to carry out waste management Temporary Storage.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
INPRO Assessment of Safety of Innovative Nuclear Reactors and Fuel Cycles INPRO Assessment of Safety of Innovative Nuclear Reactors and Fuel Cycles Y.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Fukushima Power Plant – Japan Post March 11, 2011
Agenda Background Update on Fukushima Daini Update on Fukushima Dai-ichi – Summary of Events at Fukushima Dai-ichi Summary of Radiation and Reports.
adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
The Curious Absence of New Nuclear Michael Hoeger Presented 02/06/2012.
Nuclear Power Plant How A Nuclear Reactor Works.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Fukushima I nuclear accident, March 11, 2011 What happened, why and a better design.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
AJ Blotcky Research Reactor Pre-Bid Meeting 3 September 2014.
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
INTRODUCTION TO NUCLEAR TECHNOLOGY MEHB513 SEM 2,2014/2015 GROUP PROJECT : EVALUATE THE IMPACTS OF THE FUKUSHIMA NUCLEAR ACCIDENT ON THE TECHNOLOGY DEVELOPMENT.
Nuclear decommissioning: Turning waste into Wealth
Radiation Safety Management
Vermont Yankee Decommissioning Update
Nuclear Power Public safety concerns and the costs of addressing them have constrained the development and spread of nuclear power in the United States,
Experts for experts Using the T&T international Projects to strengthen the professional development of NRA and TSO technical staff T&T second coordination.
Offerings for design safety from harmonization
Regulatory Control Training Workshop
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
Research and Test Reactor Decommissioning Inspections
Japanese Nuclear Accident And U.S. Response
2019/7/9 Application of cavitation jet technique to operating nuclear power plant MITSUBISHI HEAVY INDUSTRIES, LTD.  Hironori Onitsuka KORYO ENGINEERING.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal Robert Kury Vice President, Nuclear Liabilities D&D Program Management 1 March 2013 Presented to Colorado State University Health Physics Graduates

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal BWR Mark I Containment

Copyright by CH2M HILL Company Confidential Phases of Mid-to-Long Term Roadmap 5 5 Step 1, 2 -Condition equivalent to cold shutdown -Significant suppression of emissions Phase 1Phase 2 Phase 3 Period to the start of fuel removal from spent fuel pool (Within 2 years) Period to the start of fuel debris removal (Within 10 years) -Commence the removal of fuels from the spent fuel pools (Unit 4 in 2 years) -Reduce the radiation impact due to additional emissions from the whole site and radioactive waste generated after the accident (secondary waste materials via water processing and debris etc.). Thus maintain an effective radiation dose of less than 1 mSv/yr at the site boundaries caused by the aforementioned. -Maintain stable reactor cooling and accumulated water processing and improve their credibility. -Commence R&D and decontamination towards the removal of fuel debris -Commence R&D of radioactive waste processing and disposal -Complete the fuel removal from the spent fuel pools at all units -Complete preparations for the removal of fuel debris such as decontaminating the insides of the buildings, restoring the PCVs and filling the PCVs with water. Then commence the removal of fuel debris (Target: within 10 years) -Continue stable reactor cooling -Complete the processing of accumulated water -Continue R&D on radioactive waste processing and disposal, and commence R&D on the reactor facilities decommission -Complete the fuel debris removal (in years) -Complete the decommissioning (in years) -Implement radioactive waste processing and disposal Period to the end of decommissioning (After30-40 years) Actions towards systematic staff training and allocation, improving motivation, and securing worker safety will be continuously implemented Present (completion of step 2) Within 2 years Within 10 years After years

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Summary of Pathways Evaluated Dose Rates in mSv/hr 12

Copyright by CH2M HILL Company Confidential Keys to Success – Elimination and Shielding of High Radiation Sources 13

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Fukushima Core Debris Removal

Copyright by CH2M HILL Company Confidential Summary of Pathways Evaluated Dose Rates in mSv/hr 18

Copyright by CH2M HILL Company Confidential Factors Considered for the Pathways 19

Copyright by CH2M HILL Company Confidential Qualitative Comparison Results 20

Copyright by CH2M HILL Company Confidential Keys to Success Confirmation of Existing Conditions Elimination of High Rad Sources Debris Cleanup and Removal Decontamination Methods –Techniques can be performed remotely, semi-remotely, or manually, depending on habitability 21

Copyright by CH2M HILL Company Confidential Keys to Success – Decontamination Methods Note: Initial survey data show moderate levels of removable Cs-137 contamination, which is not a major contributor to the general area dose rates. Therefore, general decontamination activities should be performed after installation of shielding to reduce dose rate to a target of < 5 mSv/hr. 22