WASTEWATER FACILITIES PLANNING 2014 Public Information Session August 26, 2014 Town of Clinton, CT Water Pollution Control Commission.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Land Use Program Septic System Overview Scott Weldon
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Eliot Route 236 TIF District Sewer Extension Economic Impact Analysis April 11, 2012.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Paradise Preserved: Springs Protection In Wakulla County.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
DEP’s Position on Pressure Washing as of Tue 10/5/ :13 AM Ted, Below is DEP's position regarding vessel pressure washing discharges to the ground.
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
Wekiwa Springs Septic Tank Retrofit – Project Update Utilities Department March 10,
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
Lake Auburn, Maine New residential development ordinances (From the City of Auburn Comprehensive Plan) Lake Auburn Watershed Neighborhood Association
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
Connecticut Department of Energy and Environmental Protection.
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
Decentralized Sewage System (DSS) Management Robert W. Scully, PE Department of Public Health.
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
Failing Septic Systems: Problems and Solutions Protect Our Waters 2003 Legislative Session Minnesota Center for Environmental Advocacy Minnesota Environmental.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
We are a coastal community. We have beaches and marinas. We have salt marshes and tidal inlets. We have parks with fantastic water views. “ Where the.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
HARTFORD | STAMFORD | WASHINGTON, DC | GREENWICH | LAKEVILLE Connecticut Association of Water Pollution Control Authorities, Inc.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
Planning for Groundwater in Lafayette County August 2, 2006.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
Problem Statement: On-site Sewage Disposal Systems (OSS) are routinely implicated as the primary contributor of non-point sources of pollution that threaten.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
+ Onsite Sewage Systems Wastewater Management VACO Community Development and Planning Steering Committee November 13, 2011.
Jefferson County Agricultural Preservation and Land Use Plan Jefferson County’s Comprehensive Plan: Process and Strategies Presented to: Dane County Officials.
ENVIRONMENTAL PUBLIC HEALTH Onsite Wastewater Treatment Jim Gaughan, P.E., Environmental Engineer Bureau of Environmental Health Services.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Missoula County Commissioners and City Council formed the Missoula Valley Water Quality District (MVWQD) Missoula County Commissioners.
76. The central U.S. law regulating water quality is the Clean Water Act (CWA), adopted in The Act initially focused on point sources, which it.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Slide 1 California Implementation Water Board Policies.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Septic System Overview
Homeowner Responsibility
Springbrook Estates Sewer Improvement Area Informational Meeting
Sacramento County Stormwater Quality Program
Mulberry Watershed Management Plan
Georgetown county water and sewer district
Private/Domestic Wells
Water Quality Improvement Projects and Engineering Planning Grant
Article 41 Wastewater Planning Capacity Study
Water & Wastewater Equipment Manufacturers Association March 22, 2017
Homeowner Responsibility
BAT Work Group.
Know Your Septic Systems Check it, Fix it, Maintain it
Sacramento County Stormwater Quality Program
Presentation transcript:

WASTEWATER FACILITIES PLANNING 2014 Public Information Session August 26, 2014 Town of Clinton, CT Water Pollution Control Commission

Introductions and WPCC Mission Introductions of Town and Project Personnel – First Selectman William W. Fritz Jr, and the Board of Selectmen – Water Pollution Control Commission – CT River Area Health District – Jim Monopoli – CT Department of Energy and Environmental Protection – Carlos Esguerra and Dennis Greci – Consulting Engineer CDM Smith – Kristie Wagner N.L. Jacobson & Associates – Wade Thomas – Consultant – Mary Jane Engle Mission of the WPCC

Agenda Overview of CRAHD Responsibilities and Activities Ongoing WPCC Activities: – Pumpout Ordinance Facilities Planning Project Background and Necessity per DEEP Ongoing Facilities Planning Work: – Refining Areas of Concern – Evaluating Treatment Alternatives – Analyzing Sites for Groundwater Discharge

CRAHD – We are your local health department Regulate On-Site Systems < 2000 gallons per day – Including site evaluations, plan review, permits to install, inspections, permits to discharge On-Site Sewage Disposal Program Activities – Regulate repairs and system malfunctions/failures, property improvement projects under Reg b100a – Provide education and training – Approve well construction and determine potability – In fiscal year 2013: 72 repairs, in FY2014: 67 repairs CRAHD and the WPCC – Helped facilitate regional POB: Cedar Is. Marina – Will work cooperatively to blend responsibilities as this project moves forward

What is being reported about Clinton NRDC: “The beaches with the highest percent exceedance rates of the BAV in 2013 were Town Beach (Clinton) in Middlesex County (27%)” 2014 Testing the Waters report CT Department of Agriculture, Bureau of Aquaculture: There can be no recreational shellfishing program in Clinton until the water quality improves and a plan is in place to address and eliminate sub-standard sewage disposal systems along Clinton’s shoreline. Paraphrase of DA/BA to shellfish commission CT DEEP: “The Clinton Estuary includes one segment impaired for commercial shellfish harvesting and four segments impaired for direct shellfish harvesting due to elevated bacteria levels.” 2013 TMDL report

Ongoing WPCC Activities – Pumpout Ordinance Requires septic pump-out and inspection by a Licensed Septic Tank Cleaner at least every five years Cleaner must be registered with WPCC and submit report to WPCC electronically (Carmody) Administered by WPCC Clerk, Shirley Mickens Approximately 5,559 septic systems in town – Every owner has been notified of pump-out requirement at least once (some on 2 nd and 3 rd notice) – Currently approximately 470 non-compliant

Clinton has conducted numerous wastewater studies since the 1970s which recommended town- wide or regional solutions Focus of current study has evolved to looking at more localized solutions DEEP providing grants covering 55% of cost of current study CT DEEP - Project History and Background

Ongoing Activities – Completion of Wastewater Facilities Plan Wastewater Facilities Plan Goals: – Develop a comprehensive plan for wastewater management in Clinton – Refine Areas of Concern and need for off-site treatment – Find sites for groundwater discharge of treated wastewater (River not preferred by Town) – Evaluate treatment alternatives – Balance Need with available capacity of subsurface disposal sites – Monitor and improve individual on-site systems where appropriate Find the most economical and effective solutions for each area of Town

Ongoing Activities – Refining Areas of Concern Areas of Concern total approximately 600,000 gallons per day of wastewater (based on existing use), but nature and degree of problems vary Manual File Search – Reviewing historical paper files at Town Hall and CRAHD – Looking for information on soil testing, depth to groundwater, septic failures, and anecdotal information from past site activities – Goal is to reach educated, substantiated conclusions regarding off-site solutions or on-site improvements

Ongoing Activities – Refining Areas of Concern Rocky Ledge area – unique, potential public water extension Long Hill – majority off-site Coastal – mix of on- and off-site; refining boundaries Manufactured Mobile Home Communities – responsibility of community owner Downtown, Route 1 Corridor, Boulder Lake – – Final phases of evaluation and prioritization – likely a mixture of solutions Prioritization is an iterative, comparative process

Rocky Ledge Needs Area- water sampling and file search project Historical concern regarding small lots, presence of ledge and groundwater making septic system functioning difficult, and dependency of wells for drinking water Historical water testing info also showed water quality issues 48 of 122 (39%) properties had wells sampled by WPCC and CRAHD since 2011 All property files searched for available info on water/septic All properties studied for potential to upgrade septic on site to current health code standards if wells were not present. – 99% of the properties can meet this criteria

Rocky Ledge Needs Area-Results by Street Street and # of properties # (%) sampled Of sample set, # (%) contaminated (Coliform or nitrates only) Of all parcels, # (%) known health code exceedance Total # (%) contamination and/or exceedance Happy Acres (23)10 (43%)4 (40%)8 (35%)12 (52%) Killingworth Tpke. (19) 7 (37%)3 (43%)11 (58%) Margo La. (8)1 (13%)0 (0%)3 (38%) Oakwood La. (15) 8 (53%)4 (50%)7 (47%)10 (67%) Rocky Ledge Dr. (35) 16 (46%)14 (88%)7 (20%)19 (54%) Woodland Dr. (20) 6 (30%)2 (33%)7 (35%)9 (45%) Total (122)48 (39%)27 (56%)43 (35%)64 (52%)

Ongoing Activities – Evaluating Treatment Alternatives Community Treatment and Disposal Facilities, and Individual On-Site Improvements

Ongoing Activities – Finding Sites for Groundwater Discharge of Treated Wastewater Looking for favorable geology Desktop screening, site walks, subsurface exploration, hydraulic load testing

Ongoing Activities – Finding Sites for Groundwater Discharge of Treated Wastewater Working with property owners since 2010 – Walked or tested dozens of parcels – : completed study phase testing “Top Four” Parcels: – Carter Hill Rd – 50-60,000 GPD – Ninety Rod Rd – 75-90,000 GPD – Pleasant Valley Rd – ,000 GPD – Old Post Rd – ,000 GPD Total 375,000 to 570,000 GPD, assuming all can be acquired and utilized

“Pulling It All Together” – Range of Solutions for Different Areas Sewers to community treatment facilities and disposal sites – Refining areas most in need of off-site solutions and balancing with off-site disposal capacity – Treatment facilities will provide high level of treatment including disinfection and nutrient removal Enhancement of on-site systems Inspection and monitoring of on-site systems Rocky Ledge – possible public water extension Continuation of Pumpout Ordinance

Schedule for Facilities Planning Subsurface Disposal sites – study phase testing complete Refinement of Areas of Concern– through end of 2014 Facilities Plan – Draft end of 2014, Finalize in 2015 Public Outreach and Approvals – through 2015 – *Town Residents* – WPCC – CT DEEP Commence Conceptual Design – 2016, focusing on highest-priority areas first – Board of Selectmen – Board of Finance – CRAHD

Thank you all for your interest and for attending! QUESTIONS AND ANSWERS