1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2.1.3.2 Acoustics 2.1.3.3 Toxicity 2.1.3.4 Benthic Habitat Alteration Mark Bevelhimer.

Slides:



Advertisements
Similar presentations
Prioritized Sites for Amphipod TIE Study Identify 12 potentially toxic inter-tidal sites Sample four sites at a time to find two suitable sites for amphipod.
Advertisements

Framework for the Ecological Assessment of Impacted Sediments at Mining Sites in Region 7 By Jason Gunter (R7 Life Scientist) and.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Water-to-Wire (W2W) Project Dr. Edward C. Lovelace Free Flow Power
Environment Canada Alberta Environment and Water April 23,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Underwater Active Acoustic Monitoring (AAM) Network for Marine and Hydrokinetic.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.
CE 510 Hazardous Waste Engineering
NNMREC National Marine Renewable Energy Centers Hawaii National Marine Renewable Energy Center (HINMREC) University of Hawaii Wave, OTEC Southeast National.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced Anchoring Technology Dallas Meggitt Sound & Sea Technology, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
Lec 12: Rapid Bioassessment Protocols (RBP’s)
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Active Acoustic Deterrence of Migratory Whales Steve Kopf, Program Manager Pacific.
NNMREC November 5, 2010 Northwest National Marine Renewable Energy Center Standards and Protocols for Environmental Assessment Renewable Ocean Energy and.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review [Annex IV] Hoyt Battey Andrea Copping DOE Water Power Program
Methods for Incorporating Aquatic Plant Effects into Community Level Benchmarks EPA Development Team Regional Stakeholder Meetings January 11-22, 2010.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review River Devices to Recover Energy with Advanced Materials(River DREAM) Brent Crenshaw.
NNMREC Summary for Congressman Dave Reichart April 22, 2011 Northwest National Marine Renewable Energy Center University of Washington
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Puget Sound Pilot Tidal Energy Project (TRL 7/8) Dr. Brian Polagye (for Craig.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Tools & Methods to Measure/Predict Environmental Impacts: Effects on the Physical.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy.
ENVIRONMENTAL MANAGEMENT PLAN
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower Innovative System Testing (1.2) Department of Energy,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Wave Energy Resource Assessment and GIS Database for the U.S. Paul T. Jacobson.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN.
1 | Wind and Water Power Programeere.energy.gov Development of a wave-actuated electric power take-off device 2011 Water Power Peer Review Meeting Development.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Development of Open, Water-Lubricated Polycrystalline Diamond Thrust Bearings.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reedsport PB150 Deployment and Ocean Test Project Dr. Philip R. Hart Ocean Power.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Northwest National Marine Renewable Energy Center Belinda A. Batten Oregon State.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
Page 1 CONSULTANCY AND RESEARCH IN AQUACULTURE AND THE AQUATIC ENVIRONMENT A Company in the NIVA-group Methodology for Environmental monitoring of aquaculture.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Effects of Hydrokinetic Tidal Turbines Dr. Brian Polagye University.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK Research, Tools, and Methods Richard Jepsen Sandia National Labs
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review PB500, 500kW Utility-Scale PowerBuoy Project Dr. Philip R. Hart Ocean Power Technologies.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2.1.1: Categorizing and Evaluating the Effects of Stressors Dr. Andrea Copping.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower System and Component Development (1.1) Department.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Permitting and Planning Simon Geerlofs PNNL Simon Geerlofs
Presented by Gary Lippner & Glenn Moeller 3 - Year Storm Water Monitoring Action Plan.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Environmentally Benign and Permanent Modifications to Prevent Biofouling on Marine.
Hydroacoustics ODOT Hydroacoustic Work Group Agreement on Thresholds Specifications Effects to fish Attenuation Monitoring and Reporting Information needs.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Poncelet Kinetics RHK100 Prototype Steven Selvaggio Whitestone Power and Communications.
National Aquatic Resource Surveys Wadeable Streams Assessment Overview November, 2007.
NWQMC July 26, 2005 Developing A National Water Quality Monitoring Network Design.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review An Assessment of Lifecycle Cost in the U.S. over Time Mirko Previsic RE Vision.
Baird Claytor Hydroelectric Project Sedimentation Study.
Lead NAAQS Review: 2 nd Draft Risk Assessment NTAA/EPA Tribal Air Call August 8, 2007 Deirdre Murphy and Zachary Pekar OAQPS.
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
Comparison between ECAP indicators and what EMODnet can offer in the Mediterranean Sea Intro Oostende, Belgium, 21st September 2015 Giordano Giorgi*, in.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
DOE ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP BIOTA PROTECTION Stephen L. Domotor (202)
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reference Model Development Richard Jepsen Sandia National Labs
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of the Environmental Effects of Hydrokinetic Turbines on Fish: Desktop.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
Baseline Ecological Study of Wind Turbines at Block Island Wind Farm
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustics Toxicity Benthic Habitat Alteration Mark Bevelhimer November 3, Effects on Aquatic Organisms Effects on Aquatic Organisms: Acoustics, Toxicity, Benthic Habitat Alteration Dr. Mark Bevelhimer – Oak Ridge National Laboratory Dr. Glenn Cada – Oak Ridge National Laboratory

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Knowledge gap: Poor understanding of effects of MHK noise on health and behavior of aquatic organisms. Regulatory agencies require assurance that noise from construction and operation will not adversely affect aquatic animals. Programmatic goal: Reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems. Project objectives: Determine levels of acoustic output from MHK devices relative to other noise sources and response thresholds of aquatic animals Develop assessment methods for studying effects of acoustics on a variety of freshwater organisms Subtask integration: The results of this task will be incorporated into the risk assessments of ANL and PNNL ACOUSTICS

3 | Wind and Water Power Programeere.energy.gov Technical Approach Approach: Develop sampling and analysis protocol for measuring and evaluating underwater sounds. Characterize a variety of natural and anthropogenic sounds in freshwater and tidal ecosystems as a baseline for comparison. Record sounds emitted from operating MHK devices. Analyze recorded sounds and compare to known hearing thresholds of fish and other aquatic organisms. Conduct controlled sound exposure studies with freshwater fish. Key Issues: How much noise is acceptable? Which frequencies? How big an area could be impacted by single or array of devices? Unique aspects: Development of protocol with affordable and easily used instruments and analytical software. Use of near field-like conditions in controlled experiments. ACOUSTICS

4 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule Initiation date: Oct 1, 2009 Planned completion date: Sept 30, 2012 FY10 milestones: Q4 - Annual report describing results of literature review and study plan, Sept 30, 2010 FY11 milestones: Q2 - Provide list of selected study sites and noise creating targets for ambient noise characterization. Milestone ID = /31/2011 Q4 - Provide annual report on field characterization of non-MHK big river sounds. Milestone ID = /30/2011 Budget: No variances in proposed budget $142K carryover from FY11 Budget History FY2009FY2010FY2011 DOECost-shareDOECost-shareDOECost-share $0-$320K-$321K- ACOUSTICS

5 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Completed literature review of effects of noise on freshwater fish. Recorded and analyzed underwater noises for variety of natural and anthropogenic sources. Compared recorded noises to fish hearing thresholds. Produced annual report on field characterization of big river sounds. (Q4 milestone - 9/30/2011) ACOUSTICS Sound recorded from passing boat.

6 | Wind and Water Power Programeere.energy.gov Accomplishments and Results ACOUSTICS Comparison to fish hearing thresholds Various sources and distances Different sources

7 | Wind and Water Power Programeere.energy.gov Challenges to Date Measurement in flowing water is challenging. Flow shields will be used. Drift sampling employed. Very few MHK devices in the field for measurement. Plans to sample at FreeFlow Power site as soon as operational again. Controlled experiments of fish behavioral response require very large tanks or netpens. Not impossible to overcome but has caused delays in starting studies. ACOUSTICS

8 | Wind and Water Power Programeere.energy.gov Next Steps FY12 Milestones: Q1 - Record sounds at operating MHK device including device and ambient noise. Q2 - Controlled exposure studies will be commenced to evaluate the behavioral response of various freshwater fish species to reproduced MHK noises. Q3 - Analysis of recordings collected at MHK sites will be completed. Q4 – Submit article for journal publication that describes noise created by an MHK device and provides comparison to other ambient noises and fish hearing thresholds. Next steps (beyond this project): Measurements at arrays of devices Controlled exposure studies could easily be expanded to more species and Fish behavior monitoring at sites in conjunction with noise measurement ACOUSTICS

9 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Knowledge gap: Critical to the success of MHK devices are materials and coatings that are resistant to corrosion, biofouling, and fatigue, while remaining affordable, easy to manufacture, and exhibiting low toxicity to the environment. There is poor understanding of the effects of possible toxic emissions from MHK devices on health of aquatic organisms. Regulatory agencies are concerned about toxic emissions from MHK devices and will likely require assurance that chemicals that are released or eroded from anti-fouling coatings will not adversely affect aquatic animals. Programmatic goal: Reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems. Project objectives: Evaluate the environmental toxicity of contaminants released from antifouling compounds likely to be used on MHK devices. Test new types of anti-fouling compounds (e.g., silicone-based and nano-based) for environmental toxicity. Subtask integration: The results of this task will be incorporated into the risk assessments of ANL and PNNL TOXICITY

10 | Wind and Water Power Programeere.energy.gov Technical Approach Approach: Develop information on nature of coatings to be used Assess potential amounts that may be released via leaching Evaluate possible toxicity to receptor organisms Perform standard toxicity test with leachate from anti-fouling compounds Key issues: There are no standard protocol for collecting leachate from coated coupons, so we are trying several approaches with varying times of leaching before testing. Also considering sand abrasion. TOXICITY

11 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule Initiation date: Oct 1, 2009 Planned completion date: Sept 30, 2012 FY10 milestones: Annual report, Sept 30, 2010 FY11 milestones: Q2 - Commence toxicity testing of newly developed anti-fouling coatings. Milestone ID = /31/2011 Q4 - Annual report on toxicity testing of anti-fouling coatings. Milestone ID = /30/2011 Budget: No variances in proposed budget $92K carryover to FY12 for Toxicity Budget History FY2010FY2011FY2012 (expected) DOECost-shareDOECost-shareDOECost-share $125K0 0 0 TOXICITY

12 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Completed several rounds of toxicity tests with Ceriodaphnia (zooplankton) and fathead minnows with different leaching and aging periods. Only toxic effects observed to date are with blank discs and primer coating. Continued discussions with manufactures and study collaborators (Sandia Nat. Lab, North Dakota St. U.) on additional sampling materials. Made arrangements for North Dakota State scientists to provide coupons with coatings they have been testing. Made arrangements with ORNL material scientist to provide coupons with nano-scale superhydrophobic coatings. TOXICITY

13 | Wind and Water Power Programeere.energy.gov Accomplishments and Results TOXICITY Table 1. Results of chronic Ceriodaphnia toxicity tests of freshwater leachates from International Paints antifouling coatings at the end of a 7-d curing period SampleConcentration (%)Survival (%) Mean (± S.D.) offspring/female Control (4.2) Uncoated discs (4.6) Primered discs a (4.0) Intersleek (2.4) Intersleek (3.4) Table 2. Results of chronic Ceriodaphnia toxicity tests of 7-d freshwater leachates from International Paints antifouling coatings after an initial 7-d curing period. SampleConcentration (%) Survival (%) Mean (± S.D.) offspring/female Control (3.7) Uncoated discs (3.9) Primered discs a (4.6) Intersleek (4.3) Intersleek (4.6)

14 | Wind and Water Power Programeere.energy.gov TOXICITY Table 3. Results of chronic Ceriodaphnia toxicity tests of 7-d freshwater leachates from International Paints antifouling coatings after a 4-mo aging period. SampleConcentration(%)Survival(%)offspring/female Control (5.5) Uncoated discs (6.4) Primered discs a (6.5) Intersleek (8.4) Intersleek (4.9) Table 4. Results of acute fathead minnow toxicity tests of freshwater leachates from International Paints antifouling coatings SampleConcentration (%)Survival (%) 7- day leachate after curing Control100 Uncoated discs100 Primered discs a 100 Intersleek Intersleek day leachate after aging Control100 Uncoated discs10056* Primered discs a 10067* Intersleek Intersleek Accomplishments and Results

15 | Wind and Water Power Programeere.energy.gov Challenges to Date Period and mechanisms of leaching for laboratory tests need to be relevant to actual leaching from devices in the field. As results of anti-fouling coating studies on MHK devices are analyzed we hope to gain better data on how much is lost to the environment. Other modifications to FY 11 methods: Marine grade aluminum to be used for coupons Larger coupons for more surface area Stirring during leaching to better simulate field conditions TOXICITY

16 | Wind and Water Power Programeere.energy.gov Next Steps FY12 Milestones: Q1 - Begin toxicity tests on marine (i.e., saltwater) organisms so that potential impacts of antifouling coatings can be evaluated for marine systems as well as freshwater systems. Q2 - Complete data synthesis for freshwater toxicity tests to date and assess need for supplemental tests in Q3 - Complete laboratory toxicity tests with freshwater organisms. Q4 - Complete laboratory toxicity tests with marine organisms. Complete data analysis and summarize study results in a final report. TOXICITY

17 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Knowledge gap: There is little knowledge of the possible effects on bottom sediments and benthic habitat as a result of construction and operation of MHK devices in large rivers. Regulatory agencies are concerned about habitat alteration from MHK devices and will likely require assurance that such changes will be small and inconsequential. Programmatic goal: Reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems. Project objectives: Categorize the type and amount of benthic habitat that could be affected during the installation and operation of MHK projects in freshwater environments. Identify the sensitivity of aquatic biota in various habitat types to MHK-caused alterations in their habitats. Develop habitat- and biota-specific monitoring protocols for identifying the onset of potentially unacceptable ecological impacts during the siting, construction, and operation of MHK projects. Subtask integration: The results of this task will be used to calibrate SNL’s hydrodynamic / sediment transport modeling and also incorporated into the risk assessments of ANL and PNNL. HABITAT

18 | Wind and Water Power Programeere.energy.gov Technical Approach Approach: Develop field techniques and protocols for characterizing the distribution of different sediment types in large rivers using hydroacoustics (i.e., sonar). While waiting for MHK devices to be installed, characterize the effect on river sediment distribution of other in-river structures such as bridge pilings. Characterize sediments at a soon-to-be developed MHK site so that the effects of devices in place can be measured in future sampling. Estimate possible effects of MHK devices on benthic habitat and benthic organisms based on predictions of sediment redistribution, what types of benthic organisms are present, and their dependence on particular types of benthic habitat. Key Issues: How will benthic habitat be altered? How much and which types will be gained or loss? How would distribution and abundance of benthic organisms change? Unique aspects: Sonar techniques are more rapid and more easily conducted than direct sediment sampling techniques HABITAT

19 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule Initiation date: Oct 1, 2009 Planned completion date: Sept 30, 2012 FY10 milestones: Q4 - Annual report, Sept 30, 2010 FY11 milestones: Q3 – Submit field sampling plan for MHK site benthic substrate characterization; to include mobile sonar surveys and sediment grab samples for ground-truthing of automated characterization. 06/15/2011 Q4 - Annual report on Benthic Habitat Alteration studies. 09/30/2011 Budget: No variances in proposed budget $44K carryover to FY12 for Habitat Alteration Budget History FY2010FY2011FY2012 (expected) DOECost-shareDOECost-shareDOECost-share $150K0 0 0 HABITAT

20 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Received and trained on use of hydroacoustics system (split-beam boat mounted sonar) and analytical software. Developed field sampling plan. (3Q milestone) Conducted several sampling trips to surrogate bridge piling sites to collect bathymetric and sediment data and to refine sampling techniques at a manageable and nearby site. Analyzed data to identify effects of in-river structureson scouring and habitat type. Submitted FY11 annual report describing progress to date to DOE (Q4 milestone) HABITAT

21 | Wind and Water Power Programeere.energy.gov Accomplishments and Results HABITAT Multiple geo-located transects around 2 bridge pilings Single transect behind 3 bridge pilings identifies sediment deposition areas Depth (m) Interstate bridge over Tennessee River

22 | Wind and Water Power Programeere.energy.gov Accomplishments and Results HABITAT Multiple geo-located transects converted to bottom bathymetry around piling (indicated by dashed line). Multiple geo-located transects used to characterize different bottom types shown by different colors.

23 | Wind and Water Power Programeere.energy.gov Challenges to Date Bigger boat will be needed on lower Mississippi. Plan to hire boat and captain. Have designed mounting mechanism for transducer to be easily fit to another boat. Since so few devices have been installed (not just on test platforms) we are only able to sample pre-deployment conditions at this point. HABITAT

24 | Wind and Water Power Programeere.energy.gov Next Steps FY12 Milestones Q1: Characterize sediment distribution at at least one MHK site. Sediment data from this study will be supplied to SNL for sediment transport modeling efforts Q2: Create a catalogue of potential biotic receptors of benthic habitat alteration in big river systems. This catalogue would identify those organisms that should be considered as possibly being affected by MHK development and operation in large rivers where MHK permits have been issued. Q3: Complete analysis of impacts on benthic organisms based on expected changes in sediment distribution as a result of MHK operations. Q4: Develop a cost-effective protocol for benthic habitat evaluation that can be used by project developers to address environmental concerns. The protocol will include methods for sediment characterization, predicting sediment changes, identifying potentially affected biota and analyzing likely impacts. Next steps (beyond this project): Pre and post-deployment characterization of sediment and benthic organisms at active MHK sites. Enhanced collaborative effort with sediment transport modelers to improve model predictions. HABITAT