E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.

Slides:



Advertisements
Similar presentations
THE HUMAN RESOURCES DEPARTMENT
Advertisements

Energy Conservation Energy Management.
CONSTRUCTION DRILLING INC.
Data Structures Static and Dynamic.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
Excavation Lesson 3 M. S. Martin Sept De - Watering The removal of ground water and / or accumulated rainwater from within excavations or earthworks.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Taking off and ESTIMATING
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
Chapter 3 Measuring Excavation and Sitework
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Measuring Sitework, Excavation, and Piling
Foundations and basements
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Paulina wawryca Paweł bilski Piotr mazur. Project risk.
Pricing Excavation and Backfill
Controlling Labor Costs
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Payroll Definition Payroll is defined as a method of administrating employees’ salaries in the organizations. The process consists of calculation of salaries.
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
EM15 – Contractors COST MANAGEMENT
Standard Costing and Variance Analysis
Civil engineering branches & scopes
PLANT ASSETS, NATURAL RESOURCES, AND INTANGIBLE ASSETS
Lecture 10 Human Resources Looking after the human side of the business. It is the set of activities that must be done to acquire.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
OWNERSHIP COST OF CONSTRUCTION PLANT & EQUIPMENT Kumar Gyanendra Mohan
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Estimation 1 Lesson 4 - Excavation.
Resources in Construction / Finance Costs of Building Plant and Labour.
Lecture 2 Introduction to Earthmoving
Planning for Earthwork Construction
BUDGETING Reference – Mgmt Accounting –Reddy and Sharma.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Horticulture CD Unit C 4-4: Nursery, Landscaping, and Gardening.
General Contractor Davon Woodard February 11, 2014 Career Tech.
Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
Can you afford NOT to have a QS managing your construction budget?
Budgeting Student Version Describe budgeting, its objectives, and its impact on human behavior
Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
BUSINESS 12 AS MOTIVATION _ 2. REASONS WHY PEOPLE GO TO WORK money Achievement or job satisfaction Belonging to a group Security Self-worth.
Chapter Chapter 10-2 Chapter 10 Plant Assets, Natural Resources, and Intangible Assets Accounting Principles, Ninth Edition.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
SARDAR PATEL INSTITUTE OF TECHNOLOGY
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Roles and responsibilities PM
Estimating Project Costs
Costing and Project Evaluation
Contractor’s Post-contract Cost Management Processes
B.V.Patel Institute of Technology-Diploma studies
Awarding Criterion for late tender: the lowest bid- why?
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING Excavation
Rectangular Coordinates Level control in trenches
BUDGETING FOR PLANNING & CONTROL
Strip Foundations The foundation runs under all the loadbearing walls.
Presenter Tony Bosnich Oct 2015
Dennis Li - HKCIC Lecturer
Labour
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Capacity Planning For Products and Services
BET403 Cost Engineering Individual Assignment & Group Report
6th. Semester Schedule: 1st. Week
Advancd Measurement and Contract Administration
Presentation transcript:

E STIMATION 1 Excavation 2 lesson 5

E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation Excavate to reduced levels Excavate trenches Disposal of water Removal of excavated material

E XCAVATION 2 Battering the slope of the excavation

E XCAVATION 2 Nature of the ground Weather conditions Proximity of in ground services Trench/excavation depth Previously disturbed ground

E XCAVATION 2 Earthwork support/shoring

E XCAVATION 2 Earthwork support/shoring The cost is influenced by The nature of the ground and depth of excavation The type of excavation that needs shoring The material cost of the timber and the assessment made on how many times it can be used. Sheet pile shoring is usually used today.

E XCAVATION 2 Unit cost for earthwork support Cost The labour cost of fixing and removing the timber The material cost itself The number of times the timber can be used before it is unfit for further usage

E XCAVATION 2 Unit cost for earthwork support Cost The cost of the earthwork support is allowed by diving the initial cost of timber per m2 by the number of times it can be used Cost of timber is $220/m2 of face of excavation Can be used 10 times Allowance for earthwork support = $220/10 = $22.00/m2 of face of excavation

E XCAVATION 2 Working space

E XCAVATION 2 Working space Area for tradesmen to complete their work May or may not be required- estimator to review

E XCAVATION 2 Schedule of Quantities for excavation

E XCAVATION 2 Schedule of Quantities Consider the type of plant to use and the nature of the ground and quantities for excavation and disposal Check the amount of excavation = the amount of disposal

E XCAVATION 2 Schedule of Quantities The total excavation Topsoil 380 m2 x = 105 m3 To reduced levels 246 m3 Trenches 38m3 Total 389 m3

E XCAVATION 2 Schedule of Quantities The total disposal Topsoil 380 m2 x = 105 m3 Filling to excavation 47 m3 Disposal off site 237 m3 Total 389 m3

E XCAVATION 2 Labour and machine constants Digger (banksman the same constants) Top soil –0.15 hr/m3 To reduced levels – 0.09hr/m3 To trenches – 0.14 hr/m3 Digger and roller (labourer the same constants) Working space allowance–0. 08hr/m3 Filling excavations – 0.08hr/m3

E XCAVATION 2 Labour and machine rates Digger - $28.00/hr Digger + roller - $31.00/hr Banksman - $12.00/hr Labour - $12.00 hr Hardcore 1.95 t/m3 = $10.00/t

E XCAVATION 2 Topsoil – 275mm deep Digger 0.15hr/m3 x $28.00/hr = $4.20 Banksman 0.15 hr/m3 x $12.00 = $1.80 Sub total = $6.00/m3 Top soil 1 m2 x.0275 = 6 x = $1.66/m2

E XCAVATION 2 Excavate to reduced levels Digger 0.09hr/m3 x $28.00 = $2.52 Banksman 0.09hr/m3 x $12.00 = $1.08 Total $3.60/m3

E XCAVATION 2 Excavate trenches Digger 0.14hr/m3 x $28.00 = $3.92 Banksman 0.14hr/m3 x $12.00 = $1.68 Labourer 0.14/m3 x $12.00 = $1.68 Total $7.28/m3

E XCAVATION 2 Working space allowance Excavation as for trenches$7.28/m3 Assume 75% filling and 25% disposal Digger + roller (75% x 0.08hr/m3) = 0.06 hr/m hr/m3 x $31.00 = $1.86

E XCAVATION 2 Working space allowance Labourers (2no) =(2 x 0.08) x $12.00 = $1.44/ m3 Additional earthwork support – not priced Additional disposal (25% x 1 m3) =.25 x $15.80 = $3.95 Total cost of working space/m3 = $ = $14.53/m3

E XCAVATION 2 Working space allowance Working space is measured in m2 ( standard allowance is 250mm wide) Total cost of working space/m2 1 x.25 x $14.53/m3 = $3.63/m2

E XCAVATION 2 Filling with excavated material Assumed that transport over short distances can be provided by a site dumper and an allowance for this has been included in the preliminaries Digger +roller 0.08 hr x $31.00 = $2.48 Labourer (2 no) (2 x.08 x $12.00 = $1.92 TOTAL $4.40/m3

E XCAVATION 2 Hardcore filling Hardcore materials 1.9t x $10.00 = $19.50 Waste 10% 0.19t x $10.00 = $1.90 Digger + roller.05 x $31/hr = $1.55 Labourer (2 no) (2 x 0.05 x $12.00) = $1.20 TOTAL $24.15/m3

E XCAVATION 2 Operational estimating This is form of estimating where all the resources needed for part of the construction are considered together Examples Drain runs including excavation, earthwork support, bedding, pipework and backfill

E XCAVATION 2 What labour and plant is required ??

E XCAVATION 2 Operational estimating Forecasting anticipated durations of activities Resourcing Advise from construction managers and subcontractors Estimator to provide a method statement so construction staff can understand assumptions made when preparing the estimate

E XCAVATION 2 Operational estimating Estimator collates a list of resources for each operation to calculate the cost Estimator to provide a method statement so construction staff can understand assumptions made when preparing the estimate

E XCAVATION 2 Advantages Construction methods are selected which are practical Programme of works included holidays, time of year, facilities available which give a more realistic guide to the time needed for plant and labour Alterations and repair works are priced globally not against each individual item which causes overpricing The sequencing of works can be looked at before the project commences which make for more efficient resources.

E XCAVATION 2 Disadvantages If pricing a schedule of quantites it is difficult to split the costs accurately against each items. Initial discussion with other team members is necessary to provide the correct method statement and then implementing it once the works commence re Housing New Zealand rollouts

E XCAVATION 2 Comparison of pricing a schedule of quantities with an operational estimate (looking just at plant and labour) Weighbridge foundation is priced based on the schedule The site Foreman knows that a similar project took 2 weeks for 4 labourer, a return visit for 2 men to complete. A backactor and roller was needed for 3 days to complete the project

E XCAVATION 2

Labour 4 no x 2 weeks x 45 hrs x $15.00 = $ no x 2 days x 9 hrs x $15.00 =$ TOTAL LABOUR $5, Plant 1 no x 3 days x 8 hrs = $ TOTAL = $6,780.00

E XCAVATION 2 Review the difference in the total costs and ask the question why?? Good check for labour constants

E XCAVATION 2 Hourly labour rates Standard code of practice to calculate the labour rate Hourly rate = annual cost of employing an operative/actual hours worked

E XCAVATION 2 Considerations Rate includes public and annual holidays Overtime working No of hours worked each week Trade supervision Skilled operatives in the area/resources Travelling time/ subsistence allowance _ Hamiliton Bonus payments Insurances

E XCAVATION 2 Plant rates Identify specific items of plant Purchase for the contract Company owned plant Hire from an external source Price sourcing Calculate from first principles Internal plant department rates Hirer’s quotations Published schedules

E XCAVATION 2 References Estimating and tendering for construction work – Martin Brook