140-204 Western Ave S53X Audit  12 th March 2014  7 pm Mantra.

Slides:



Advertisements
Similar presentations
Ground source heat pump legislation in Estonia
Advertisements

The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
PROMOTING A COORDINATED GROUNDWATER MANAGEMENT FOR LAGOS STATE: WAY FORWARD By PROFESSOR E.O. LONGE, PhD FACULTY OF ENGINEERING DEPARTMENT OF CIVIL & ENVIRONMENTAL.
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
MINING ACCESS TO WATER RESOURCES – TRADITIONS AND DEVELOPING PRINCIPLES MINING ACCESS TO WATER RESOURCES – TRADITIONS AND DEVELOPING PRINCIPLES ALEX GARDNER.
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Further Site Investigation Sutton Walls Former Landfill
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
Informed consent: What if I get it wrong? Greg Hill ACLCA – 17 February 2011.
INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009.
Tullamarine Rehabilitated Landfill > 27 November 2013.
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
Quality Decisions Today’s Goal: To learn about nonpoint source pollution. To understand how decisions we make impact the environment around us.
Mapua Contaminated Site, New Zealand Kayleigh Cradock Andrew Pickup Chris Thompson.
Audit Committee in Albania Legal framework Law 9226 /2006 “On banks in Republic of Albania” Law 9901/2008 “On entrepreneurs and commercial companies” Corporate.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Environmental Permitting Regulations Tom Fowler – Environment Officer
Forest Management Certification through the Sustainable Forestry Initiative (SFI ™ ) Rev. 2/3/06 Content owned by: EMS Manager SFI Overview.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 3: The Local Authority - What’s happening? Castle Lake,
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
SAVE OUR EARTH SAVE OUR PLANTS By Ms. Joy. We cannot live without plants.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
PwC Internal Control Reports: Facts, Myths and Best Practices FIRMA National Risk Management Training Conference – San Francisco, CA Wednesday March 31,
Public Health and Protection Regulatory Business Support Rachel Taylor & Andy Broomfield.
Former Monsanto Chemical Tip Wrexham County Borough Council.
Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
APPLICATION OF ISSAI IN NATIONAL AUDIT OFFICE OF LITHUANIA Audronė Vaitkevičiūtė Head of Audit Methodology Division Audit Development Department 4 September.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
Environmental auditing
Landfill acceptance criteria: justification and background Heijo Scharff FEAD Workshop Implementation of the Landfill Directive Budapest, Hungary, 11 May.
INTERNAL AUDIT MANUAL MS. EDIT NÉMETH HEAD OF CENTRAL HARMONISATION UNIT FOR PUBLIC INTERNAL CONTROL, HUNGARY PEM-PAL IA COP IA MANUAL WORKING SESSION,
Assurance Report on Controls at Service Organizations SAE 3402
1 of 21 Introduction to the EPA 7-Step DQO Process DQO Training Course Day 1 Module 7 (30 minutes) Steps Presenter: Sebastian Tindall.
Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting.
I.Summary of technical guideline II.Reviews III.Recommendations.
The Contaminated Sites Cleanup Process (18 AAC 75)
Current state of regulation of shale gas regulation in the UK Dr Sanna 12 March
Flanders Soil Policy Current Flemish policy on soil contamination The Soildecree and VLAREBO Indicators in remediation policy Johan Ceenaeme Head of Unit.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
Pollution Earth and Beyond. What is pollution? The contamination of air, water, or soil by substances that are harmful to living organisms.
September 18, 1998 State of Illinois Rules and Regulations Tiered Approach to Corrective Action (TACO) Presented by The Great Plains/Rocky Mountain Technical.
South Australia’s Environment Protection Authority Articulating aesthetics Monday 24 August 2015 Andrew Pruszinski.
New activities Tour de Table – Lithuania Kestutis Kadunas, Geological Survey of Lithuania.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
29 March 2011 Audit Authority Audit Department Ministry of Finance 1.
Final Project Objectives: Conduct a risk assessment independently. Apply theory and methods discussed in this course in a creative fashion to (i) assess.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
Llwyneinion Acid Tar Lagoon
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Risk Assessment and Monitoring for Environmental Chemicals SURIN AREE Environmental Scientist Thailand.
Wisconsin’s New Approach to Land Use Controls Presented by Mark F. Giesfeldt Wisconsin Department of Natural Resources.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
Water Use licencing in Namibia
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Safeguarding Malta’s Groundwater
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
TSCHUDI COPPER MINE.
Public Policy Institute 2016 Haywood County Land Use Survey
Environmental Issues Mapping Field Lab
Review of guidance number 16, SE Groundwater in drinking water protected areas Lessons learnt from the 1st RBMP period Lotta Lewin Pihlblad & Jenny McCarthy.
Groundwater area protection plans in water management
9 Site Valuation Vacant land Vacant site
THANK YOU for helping make tonight possible
Presentation transcript:

Western Ave S53X Audit  12 th March 2014  7 pm Mantra

S53X Scope >Site legal address is 140 – 204 Western Ave >A private landholding & separate from the Landfill >Two independent processes (i) Rezoning is regulated under Planning Act, (ii) Contamination Assessment is regulated under the Environment Protection Act >S53X Audit is the most rigorous method under the regulations for assessing exposure risks to future users & was completed voluntarily by Transpacific >Soil, groundwater & air segments of environment at the site were assessed

Site Location 3

S53X Finding >140 – 204 Western Ave is suitable for commercial land use (subject to the relevant planning approvals). >The finding is conditioned : Groundwater boreholes must be accessible for sampling by Transpacific; Groundwater use is limited; >Any licence application for groundwater abstractions is referred to the Auditor for review by Southern Rural Water.

S53X Limitations >The Auditor’s statement is issued under the Environmental Protection Act 1970 >Auditor findings cannot be changed >The Auditor’s statement will inform the Planning process >Tonight’s meeting is to provide information and clarification

Thank you for your time