SERVICING HUMAN RESOURCES OFFICE (SHRO) TRAINING – LEVEL 1
SHRO Training Tool Objectives
TIME SENSITIVE- THE 1 ST LEVEL RISK MITIGATION PROCESS IS NOW A 60 DAY PROCESS. INTERACTIVE RISK ASSESSMENT PROCESS- THE FMO, WLFF AND SHRO NOW PARTICIPATE IN AN INTERACTIVE RISK ASSESSMENT PROCESS TO DEVELOP THE RISK MITIGATION OR WAIVER MEMO. DECISION POINT SHIFT- THE MANAGEMENT OFFICIAL (MO) NOW MAKES THE RISK MANAGEMENT DECISION (WAIVER DETERMINATION). NEW – 60 Day Risk Mitigation/Waiver Process
OLD Waiver with Restrictions New Risk Mitigation/Waiver Process 60 day fixed timeline FMO, WLFF and SHRO participate in the Interactive Risk Assessment Process to develop the Risk Mitigation/Waiver memo MO makes the risk management decision (Waiver determination) Comparison of Old and New Process Process took an average of over 200 days SHRO drafted Waiver with Restrictions Unanimous concurrence determination needed between WFSPM and DOI MSP
DOI MSP Website
Roles and Responsibilities
SHRO JOB AIDS AND TEMPLATES
SHRO Templates
1 ST LEVEL REVIEW HAS A 60 DAY LIMIT Risk Mitigation/ Waiver Process
SHRO PREPARES AND SENDS THE OPPORTUNITY MEMO WITHIN 5 CALENDAR DAYS Non-Clearance Letter
1.2 Initial Letter to WLFF
1.2b_2.2 WLFF Opt Out
THE WLFF IS GUARANTEED A MINIMUM OF 14 DAYS TO GATHER SUPPORTING DOCUMENTS Interactive Risk Assessment Process
THE FMO AND WLFF IN CONSULTATION WITH THE SHRO HAVE 30 DAYS TO REVIEW, ANALYZE AND DRAFT THE RISK MITIGATION/WAIVER MEMO Interactive Risk Assessment Process
Risk Mitigation Waives the requirement to meet a medical standard when there is sufficient evidence that the WLFF can perform the essential functions of the job safely and efficiently, without endangering the health and safety of the individual or others. Risk mitigation places specific mitigation(s) on the WLFF, eliminating or reducing the symptoms or impact of an impairment when performing arduous duties during wildland firefighting Waiver vs. Risk Mitigation Waiver
60 1.2a_2.2b WLFF Extension Request
Risk Mitigation/Waiver Template
WFSPM PROVIDES ADVICE TO THE FMO AND SHRO WITHIN FIVE CALENDAR DAYS 1.5 to WFSPM
SHRO SUBMITS REVISED DRAFT MEMO AND RESPONSE FROM THE WFSPM TO MO WITHIN FIVE DAYS 1.7 to MO for Decision
MANAGEMENT OFFICIAL MAKES THE RISK MANAGEMENT DECISION, THEN RETURNS THE MEMO WITHIN FIVE DAYS Management Official (MO) Determination
1.9b Acceptable Risk w/ or w/o Conditions
WLFF IS GIVEN THE OPPORTUNITY TO PARTICIPATE IN THE 2 ND LEVEL RISK MITIGATION/WAIVER PROCESS 1.9c Unacceptable Risk
SHRO S THE DECISION NOTIFICATION AND A PDF ATTACHMENT OF THE RISK MITIGATION/WAIVER DECISION MEMO TO DOI MSP WITHIN FIVE DAYS
DOI MSP TRACKS THE 60 DAY DEADLINE FROM THE NON- CLEARANCE NOTIFICATION TO RECEIPT OF THE DECISION MEMO. IF THE SHRO HAS NOT FORWARDED AN EXTENSION REQUEST, OPT-OUT OR DECISION MEMO FROM THE MO, THE DOI MSP WILL CONTACT WFSPM FOR FOLLOW UP. 1 st Level Process Completed
RISK MITIGATION/WAIVER AMENDMENT PROCESS
Questions? DOI MSP Contact Information Phone: