Company Confidential 1 NASA Update on: NASA Audit Management Team (NAMT), JAPC Status & Counterfeit Parts Mitigation Actions Buck Crenshaw, JAPC – Deputy.

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

Company Confidential Registration Management Committee 1 AS9110 Alignment to Federal Aviation Regulations (FARs) and Original Equipment Manufacturers(OEMs)
Transition from Q1- 8th to Q1- 9th edition
Understanding the Requirements Qimpro Standards Organization
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Company Confidential Registration Management Committee 1 Bogus Certifications Tim Lee Chair IAQG OPMT The Boeing Company Date: July 16, 2014.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
IAQG 9110:2012 Revision Overview Prepared by IAQG 9110 Team Please contact Jeff Wood at with any questions or
22000 Food Safety Management Systems
The ISO 9002 Quality Assurance Management System
Prepared by: Tim Lee – Chair IAQG OPMT The Boeing Company October 10, 2013 International Aerospace Quality Group (IAQG) Other Party Management Team (OPMT)
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
ISO 9001:2008: Key changes and transition process
Company Confidential Registration Management Committee 1 Auditing the Implementation of Counterfeit Electronic Parts Control Plan Requirements Bill Zint,
4. Quality Management System (QMS)
4. Quality Management System (QMS)
IAQG International Aerospace Quality Group QMS Standards: Change Overview Quality Management Systems (QMS) For Aviation, Space and Defense April 16,
Company Confidential Registration Management Committee (RMC) 1 CB and Auditor Performance Expectations Boston, MA July 22, 2011 R. Darrell Taylor Raytheon.
Internal Auditing and Outsourcing
The OP Assessor Process
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Buck Crenshaw, Program Element Manager, NASA-Wide.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Quality Management Systems P.Suriya Prakash Final Mech Vcet
IAQG OPMT OP Assessor Training SMS, CBMC and OASIS Oversight Assessment February 2015 Module 16.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
IAQG 9120:2009 Revision Overview Prepared by IAQG 9120 Team Rev: 2 Dated: 15 July 2009.
Company Confidential Registration Management Committee (RMC) What’s Next for Oversight? 1 Other Party (OP) Assessor Workshop Palm Beach Gardens, Florida.
Visit us at E mail: Tele:
Joint Audit Planning Committee (JAPC) Update & Issues Prepared by: Buck Crenshaw Date:
Company Confidential Registration Management Committee (RMC) 1 NASA’s Joint Audit Planning Committee (JAPC) Complements Other Party Audits Atlanta, GA.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Company Confidential 1 JAPC Update Buck Crenshaw, JAPC Deputy –Chairman Tony Gutierrez, JAPC Manager 20 January 2010.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
Registration Management Committee (RMC) Aerospace Auditor Workshop July 30 – 31, 2009 Minneapolis, MN AAQG RMC 101 Industry Controlled Other Party Structure.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Company Confidential 1 NASA Update JAPC Status Buck Crenshaw Manager NASA Quality Initiatives, JPL at KSC January 18, 2012 San Diego CA January 17-18,
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
Detection to Prevention & OASIS Pilot
Company Confidential 1 IAQG 9100:2009 Revision Overview Buddy Cressionnie Lockheed Martin Americas 9100 Team Lead Prepared by IAQG 9100 Team Rev: 1 Dated:
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Company Confidential IAQG Workshop October 21, IAQG Workshop 9100 Certification Scheme Certification status – Changes implemented Tim Lee The Boeing.
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
1 Overview of SAE’s AS6500 “Manufacturing Management Program” David Karr Technical Advisor for Mfg/QA AFLCMC/EZSM
To the Greater Phoenix Chapter of ASQ January 10, 2013.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
November 6, 2013 Purchasing Controls & Supplier Quality Best Practices Beyond Compliance for the Medical Device Industry AdvaMed 2013 Bernie Liebler Technology.
External Provider Control
Industry Expectations for Distributors
UNIT V QUALITY SYSTEMS.
ISO 9000 Dr. S. Thomas Foster, Jr..
JAPC Update Salt Lake City, UT September 14, 2010
IAQG 9120:2009 Revision Overview
IAQG 9110:2012 Revision Overview
IAQG 9110:2012 Revision Overview
Presentation transcript:

Company Confidential 1 NASA Update on: NASA Audit Management Team (NAMT), JAPC Status & Counterfeit Parts Mitigation Actions Buck Crenshaw, JAPC – Deputy Chairman NAMT Facilitator Tony Gutierrez - JAPC Manager July 20, 2011 Boston, MA July 19-22, 2011

2 NAMT use of ICOP scheme If a Center is AS9100 certified by an accredited third party, there is no need for a QAAR (or even a 1 st party internal audit for that matter) to verify compliance with every single AS9100 requirement. All requirements are not equally important, and it is a poor use of NASA QA resources to be revalidating compliance with non-essential QMS requirements that registrars are already looking at versus validating compliance with important non-AS9100 Quality requirements. I would even go as far as to cite 100% duplication of registrar audits as a violation of NPD risk-base QA. Note that QAAR audits are already looking at reduced scope AS9100 attributes. Having a NASA auditor present during 3 rd party audits makes great sense.

3 NAMT use of ICOP scheme Background Several NASA requirements documents have been published for the purpose of providing NASA Headquarters insight into NASA Field Centers, NASA Major Primes, and NASA’s Sub-Tier Suppliers. The process for oversight in the Sub-Tier Supplier is additionally clarified in a Memorandum of Agreement (MOA) that implements the NASA Joint Audit Planning Committee. This MOA establishes an integrated schedule and addresses team membership and methods of operation for the conduct of the audits of these Sub-Tier Suppliers. The purpose of the NASA Audit Management Team is to accomplish the same functions as the JAPC does for Sub-Tier Suppliers for the NASA Field Centers and NASA Primes.

4 NAMT use of ICOP scheme NAMT is a Government Team to provide NASA Management and NASA Field Centers insight into the compliance to appropriate Safety and Mission Assurance (SMA) Requirements at the NASA Field Centers and compliance to contractually imposed SMA Requirements at NASA Primes.

5 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS QUALITY MANAGEMENT SYSTEM4.1 Control of outsourced processes Configuration Management

6 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS PRODUCT REALIZATION7. Identification and Inspection of Key Characteristics Supplier Quality Management (Purchasing) Process control Documentation of processes Control of key characteristics In process verification points Criteria for workmanship Validation, Monitoring, and Measurement of Special Processes Identification of Monitoring/Measurement Status Traceability of Product to Records of Objective Quality Evidence Preservation of Product / Work Environment Electrostatic Discharge Foreign Object Debris/Damage Cleanliness

7 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS MEASUREMENT, ANALYSIS AND IMPROVEMENT8. Internal Audit Monitoring, Measurement, and Control of Key Characteristics Control of Nonconforming Product Corrective Action

8 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Customer Focus/Satisfaction(5.2 & 8.2.1) Information to be monitored and used for the evaluation of customer satisfaction shall include, but is not limited to: »product conformity »on-time delivery performance »customer complaints »corrective action requests. Organizations shall develop and implement plans for customer satisfaction improvement that address deficiencies identified by these evaluations, and assess the effectiveness of the results. (8.2.1)

9 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C QMS General requirements(4.1) The organization’s QMS shall address customer and applicable statutory and regulatory QMS requirements Customer Focus/Satisfaction(5.2) Top management shall ensure that product conformity and on-time delivery performance are measured and that appropriate action is taken if planned results are not, or will not be, achieved.

10 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Project Management(7.1.1) Addition: New requirement for planning and managing product realization in a structured and controlled way to meet requirements at acceptable risk, within resource and schedule constraints. Implementation/Audit Considerations: Does the organization have a process to manage product realization planning to ensure quality and schedule are not compromised? –How are project plans used to manage the successful completion of projects?

11 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Risk Management (7.1.2) Addition: New requirement to implement a risk management process applicable to the product and organization covering: responsibility, criteria, mitigation and acceptance. Implementation/Audit Considerations: Does the organization have a risk management process that addresses all of the applicable requirements? –Is the definition of risk appropriately understood and applied in that process? –Are risks successfully managed in the organization?

12 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Configuration Management(7.1.3) Focuses configuration management on the product and how it is sustained throughout product realization

13 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Approval status for suppliers(7.4.1) Revision: Added and provided examples of “approval status” (e.g. approved, conditional, disapproved) and examples of “scope of approval” (e.g. product type, process family).

14 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Approval status for suppliers(7.4.1) Revision: Added and provided examples of “approval status” (e.g. approved, conditional, disapproved) and examples of “scope of approval” (e.g. product type, process family). The organization must define the process for suppliers approval status decisions or changes. Recognition that the industry trend is to use externally provided supplier performance data (e.g. Online Aerospace Supplier Information System –OASIS, Nadcap)

15 JAPC JAPC HIGH RISK QUALITY SYSTEM ELEMENTS FROM AS9100C Production Process Verification( ) Requirement to verify the production processes, documentation and tooling are capable of producing parts and assemblies that meet requirements. This process shall be repeated when changes occur that invalidate the original results(e.g. engineering or manufacturing processes changes, tooling changes).

16 Joint Audit Planning Committee (JAPC) status As a consequence of any CB exceeding triggers and being asked for a corrective action plan to the RMC the JAPC will conduct a supplemental oversight audit in conjunction with any JAPC 2 nd party audit scheduled during the following year. Several JAPC audits currently in coordination phase. Significant activity as NASA transitions from the Shuttle and Station assemble to commercial space services. Significant issues as it relates to our NASA developed Heavy Lift launcher. AAQG Space Forum has invited all of the Commercial Space companies issued contracts to our next AAQG Space Forum meeting in Long Beach in September.

17 Joint Audit Planning Committee (JAPC) status A goal has been established to have most NASA auditors complete the AATT course. To date AATT has been conducted at GSFC, GRC and JSC. A course has been scheduled for KSC including DCMA personnel in September. If funding is available we intend to make AATT available to JAPC members. The JAPC and NMAT is considering using some of the standardized forms in AS9101D. The intention of both the NAMT and JAPC is to input audit data into OASIS.

18 Counterfeit Parts Issue 111TH Congress - 2D Session - S AN ACT to authorize the programs of the National Aeronautics and Space Administration for fiscal years 2011 through 2013, and for other purposes S.3729 Congressional Authorization Bill for FY2011 through 2013 requires that counterfeit part identification training be established for all employees that procure, process, distribute, and install electronic parts that will: –(A) teach employees how to identify counterfeit parts; –(B) educate employees on procedures to follow if they suspect a part is counterfeit; –(C) regularly update employees on new threats, identification techniques, and reporting requirements; and integrate industry associations, manufacturers, suppliers, and other Federal agencies, as appropriate…

19 111TH Congress - 2D Session - S (cont.) REQUIREMENTS.—In carrying out the program, the Administrator shall establish: –counterfeit part identification training for all employees that procure, process, distribute, and install electronic parts … –an internal database to track all suspected and confirmed counterfeit electronic parts … –a mechanism to report all information on suspected and confirmed counterfeit electronic parts to law enforcement agencies, industry associations, and other databases, and to issue bulletins to industry … REPORT TO CONGRESS.—Within one year after the date of enactment of this Act, the Administrator shall report on the progress of implementing this section to the appropriate committees of Congress.

20 NPD C, NASA Parts Policy ATTACHMENT B: Counterfeit Parts Control Plan Contents –Assess potential sources of supply to determine the risk of receiving non-authentic parts... –Mitigate risks of procuring counterfeit parts from sources other than OCMs or authorized suppliers. –Include applicable contract/purchase order quality requirements related to counterfeit parts prevention. Examples of quality requirements are provided in AS5553, including: … –Specify contractor flow down of applicable counterfeit parts prevention requirements to their subcontractors.

21 NPD C, NASA Parts Policy (Cont.) Product Assurance Process: Assess potential sources of supply to determine the risk of receiving non-authentic parts... Also, ensure Material control and disposition. Report nonconforming, defective, and/or suspected counterfeit for all cases involving counterfeit parts or other potential fraud, to the NASA Office of Inspector General and the NASA Director. Counterfeit Parts Training provided to-date: FY11 NASA Center CF Parts Control Plans –October GSFCDrafted –DecemberGRCReleased –FebruaryDFRC Pre-Draft –MarchKSC –AprilSSC –MayGSFC –JuneJSC

22 SAE G-19 Members from Government, Defense and Industry Sectors Establishment Creative Electron Crestwood Technology Group DA-Tech Derf Electronics Det Nortske Veritas (DNV) DPA Components International Electronic Supply Chain Solutions Eltek Semiconductors General Dynamics General Dynamics UK GE Aviation Glenbrook Technologies Goodrich Control Systems Greenberg & Bass Harris Hi-Reliability Microelectronics Hi-Rel Laboratories Honeywell Aerospace Electronic Systems Honeywell Int'l Honeywell Technology Solutions Infineon Technologies AG Integra Technologies Jabil Circuits Jacobs Engineering Jet Propulsion Laboratory L-3 Communications - CSW Left Coast Technical Solutions Lockheed Martin Aeronautics Lockheed Martin Missiles & Fire Control 3M Microram Electronics Motronics Circuits International Mouser Electronics Nisene Technology Group Northrop Grumman Electronic Systems N.F. Smith & Associates NQA Northrop Grumman Orbital Sciences Plexus Premier Semiconductor Services Process Sciences Raytheon Rochester Electronics Sandia National Laboratories Schlumberger HPS Selex Galileo Silicon Cert Laboratories SMT Corp SolTec Electronics Sonix Sonoscan SRI International Sarnoff Star Associates International Trace Laboratories TTI Aero Engine Controls American Electronic Resource Analytical Alternatives Analytical Solutions Applied DNA Sciences Arcadia Components Ares Corp Arrow Electronics Astute Electronics BAE Systems (Operations) BAE Systems Ball Aerospace & Technologies Boeing Boeing Advanced Systems Business Quality Process Management Bechtel Plant Machinery CALCE University Of Maryland Celestica Corp. Technology & Engineering China Aero-Polytechnology Establishment Creative Electron Crestwood Technology Group DA-Tech Derf Electronics Det Nortske Veritas (DNV) DPA Components International Celestica Corp. Technology & Engineering China Aero-Polytechnology

G-19 Subcommittees 23 G-19 Committee G-19 CI Continuous Improvement Subcommittee (AS5553A: Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition) G-19 D Distributor Subcommittee (AS6081: Counterfeit Electronic Parts; Avoidance Protocol, Distributors) G-19 DR Distributor Risk Characterization Subcommittee (ARP6178: Counterfeit Electronic Parts; Tool for Risk Assessment of Distributors) G-19 C Standards Compliance Verification Subcommittee G-19 A Test Laboratory Standards Development Subcommittee (AS6171: Test Methods Standard; Counterfeit Electronic Parts)

24 Document Roadmap since AS5553

25 Questions?