MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis Premium Power for Colocation Telecom Power Infrastructure Analysis February 27,

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
The CDCE BNL HEPIX – LBL October 28, 2009 Tony Chan - BNL.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Cloud Computing Data Centers Dr. Sanjay P. Ahuja, Ph.D FIS Distinguished Professor of Computer Science School of Computing, UNF.
The Need for an Energy Grid in the Maldives
Direct Use of Natural Gas. Tampa Electric Peoples Gas.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Electricity Infrastructure: Overview and Issues (2) H. Scott Matthews February 19, 2003.
1 Northwestern University Information Technology Data Center Elements Research and Administrative Computing Committee Presented October 8, 2007.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
02/24/09 Green Data Center project Alan Crosswell.
The Smart Grid By: Pranay Randad. Lights and Power come at a steep price … Without sufficient energy, standard of living decreases. Need reliable sources.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
ENERGY INDUSTRY FUNDAMENTALS: MODULE 4, UNIT B— Transmission, Governance, Stability & Emerging Technologies.
Creating Energy-Efficient Data Centers
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Architecture for Modular Data Centers James Hamilton 2007/01/08
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
1 May 12, 2010 Federal Data Center Consolidation Initiative.
VINCE GRIFFIN VICE PRESIDENT ENVIRONMENTAL & ENERGY POLICY INDIANA CHAMBER OF COMMERCE.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
University of Michigan, CSG, May 2006 UM/MITC Data Center.
By: Amanda Torres BLACKOUTS:What causes them and how to reduce… Energy is the main source that keeps this world alive. When energy blows out it causes.
1. 1. Overview: Telecommunications Project  Planning and implementation (2007-today) 2. Discussion: Proposal to Improve Infrastructure  Upgrade horizontal.
LBNL and Government Data Center Programs SC07 November, 2007 William Tschudi
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Energy Usage in Cloud Part2 Salih Safa BACANLI. Cooling Virtualization Energy Proportional System Conclusion.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
Virginia Information Technologies Agency Green Technology Initiatives
Overview of Data Center Energy Use Bill Tschudi, LBNL
Most organization’s data centers that were designed before 2000 were we built based on technologies did not exist or were not commonplace such as: >Blade.
Thermal-aware Issues in Computers IMPACT Lab. Part A Overview of Thermal-related Technologies.
Basic law of energy policy in Japan toward to the development of CES Takao KASHIWAGI Professor, Ph. D, Graduate school of Bio-Applications and Systems.
10. DENSITY  In addition to building design, there are other elements that can impact the passive potential of a site. Density, measured in Vancouver.
Data Center Facility & Services Overview. Data Center Facility.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
FERC Staff’s Report on Demand Response and Advanced Metering.
Update on EIC project – smart cities and the environment.
BI Marketing Analyst input into report marketing Report TitleElectricity in Madagascar Report SubtitleCountry profile of power market trends and investment.
Authors: William Tschudi, Lawrence Berkeley National Lab Stephen Fok, Pacific Gas and Electric Company Stephen Fok, Pacific Gas and Electric Company Presented.
Ice Storage for Peak Load Reduction Chris Smith NYSERDA NARUC 2007 Summer Meeting.
1 The Tipping Point macro forces are converging to create a revolutionary “Tipping Point” within 5 years change will be fast –
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
Green Server Room Construction Primary concerns when building a server room is size and cooling. Size can be diminished with the use of virtual servers.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Taking your Business Technology Further. First Communications: At A Glance Technology Provider since 1998, serving thousands of Businesses throughout.
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
EDA E NERGY S TUDY Presenter Nathan Fazer, CUPPAD Team Members Jay Maldrum and Chris Green, MTU’s KRC Abhilash “Abhi” Kantamneni, MTU Grad Student.
Submitted By: Preeti 376/09 EE-7 th SEM D.A.V INSTITUTE OF ENGINEERING & TECHNOLOGY Submitted to: Mr. Parminder Singh Mr. Sushil Prashar.
Status Report on 2007–2016 Long-Term Reliability Assessment Mark Lauby August 16, 2007.
The Genome Sequencing Center's Data Center Plans Gary Stiehr
CERN Data Centre ‘Building 513 on the Meyrin Site’
The Opportunity for CHP in the United States
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Architecture for Modular Data Centers
Direct Current (DC) Data Center
Presentation transcript:

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis Premium Power for Colocation Telecom Power Infrastructure Analysis February 27, 2001 Gary Hoogeveen, Ph.D. MidAmerican Energy Holdings Company

Telecom Power Infrastructure Analysis 2 Overview U.S. Power Issues that Affect the Data Center Industry The Escalation of Power Requirements in Data Centers

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 3 Status of the U.S. Electricity Industry

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis Percent Over/Under Target Reserve Margins (high demand/low supply projection) NWPA 0 ERCOT 14.3 RMPA 20.9 AZNMA/CANVA -5.2 MAPP -2.3 SPP 2.5 ECAR/MAIN 3.4 SERC -2.0 FRCC -4.7 NEPOOL 18.0 MAAC -4.7 NYPP 4.4 New York City -5.0 Undersupply Oversupply

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis Percent Over/Under Target Reserve Margins (high demand/low supply projection) NWPA -3.2 RMPA 4.5 ERCOT 2.5 AZNMA/CANVA MAPP SPP -6.8 ECAR/MAIN -7.5 SERC FRCC MAAC NYPP -2.6 NEPOOL 9.3 New York City Undersupply Oversupply

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 6 Transmission Congestion Problem Areas New York City

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 7 Low Price $1.046 on January 24, 1992 High Price $9.978 on December 27, 2000

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 8 Low Price $1.046 on January 24, 1992 High Price $9.978 on December 27, 2000 Low Price $1.046 on January 24, 1992 High Price $9.978 on December 27, 2000

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 9 Power Quality Issues Data centers have power quality issues. What’s the solution? 1.Treat the symptoms at each individual data center, even though the disease exists within the grid. OR 2.Cure the problem by designing your own grid and removing power quality viruses like aluminum smelters, steel plants, and so on from your system.

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 10

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 11

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 12 Summary of US Power Issues Power availability may become limiting factor in data center development. Higher natural gas prices will result in higher electricity costs. The grid is 99.9% (at best) reliable and not getting better. The California crisis has increased regulatory uncertainty nation wide. –Uncertainty is death to new power infrastructure investments.

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 13 Data Center Demand Escalation

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 14 Data Center Demand Analysis Current and projected Data Center (including Colo, Gateways, Network facilities, etc.) demand exceed current and planned supply Current Data Centers do not support all of the following: –Some current and nearly all projected computing power densities –Upgrading beyond 150 watts/sq ft of raised floor Power and cooling limitations because of physical plant –99.99% uptime (tier 3 and 4 Data Centers) * –Unlimited bandwidth (not on backbones)  New, high-capability, long-life Data Centers will be built –Dispersed – individually built –Concentrated – in Parks * Uptime Institute

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 15 Two Significant Impacts on Infrastructure 1.Quality of Data Center –Increased quality increases physical plant support equipment (N+1, System+System) which increases non-productive (cooling, UPS losses, etc.) power requirements 2.Power Density (watts/sq ft) –Increased power density increases physical plant support space as a percentage of raised floor space

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 16 Quality of Data Center Power required to cool a watt of heat created by computers is approximately a watt Facilities requiring significant power at data center Chillers UPSs (due to power conversion losses) Computer Room Air Conditioner (CRACs) – Note, since CRACs are traditionally on the raised floor, they actually contribute heat as they cool Higher quality data centers require System+System redundancy, increasing the power draw by physical plant

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 17 Power Density Trends Current data centers built to watts / sf New installations averaging 125 watts / sf demand Dense rack-mounted servers can theoretically push demand to 600 watts / sf, or close to 20,000 watts per cabinet Computing power density will continue to go up New generations of CPU are hotter Itanium Sparc III More CPUs are being put into smaller servers

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 18 Power Density Trends

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 19 How Did This Come on So Fast? Server density (illustrated in previous slide) Movement of disk off the server Each generation of CPU is hotter than the last More CPUs are being put into small rack-mounted servers Rack mounted server form factor has shrunk in size dramatically Under-utilized server capacity Movement from larger multi-purpose computing work loads on servers running at > 70% utilization to many small single- purpose servers running at 15-25% utilization Installation of redundant servers, further decreasing utilization Under-utilized servers still draw full power Consolidating distributed computing back to data centers Lack of skills to run distributed systems Emergence of servers as critical to business

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 20 What To Do? Continue to build small data centers distributed throughout the power / telecom networks Emerging inhibitors to building new facilities (mostly power related) No economies of scale Build larger data centers with on-site power, cooling and telecom Economies of scale Concentration of telecom points of presence

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 21 Implications to the Telecom Industry Power Densities are increasing: Requiring more HVAC and Power per square foot Alternative site deployments (either centralized or decentralized) Heightened awareness of power problems affects: Growth of data centers Growth of power generation facilities Power stresses may impact costs for Service providers and consumers Telecom providers may be charged a premium for power which eventually would impact consumers Poor power quality require service provider to over engineer at the edge which increases costs

MidAmerican Energy Holdings Company Telecom Power Infrastructure Analysis 22 Call to Action NRIC V Chair proposes that, subject to available funding, the appropriate FG initiate a “Study on Potential Power Issues in the US and their impact on the Nation’s Communications Networks” This study should include: Region by region assessment of potential power shortages Region by region view of Data Center concentration Assessment of Power Plant construction currently underway in the US Identification of potential gap in power supply and demand project for 5 years This Study should result in a Paper and presentation to NRIC V