Improve - IV: Getting from Idea to Implementation Tactical Planning Is it Working? How Soon will You Know? Control Planning This module originated by:

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Welcome to the Skills-Based introduction to the ePARs Personal Evidence Database (PED) Keep clicking and this slideshow will take you through the system.
Internet Librarian 2007 Project management workshop 28 th October 2007 Mary Auckland Project management workshop 28 th October.
Spreadsheet Basics Computer Technology.
5.1.2 Situative Planning 1 Situative Planning - A Strategic Approach to Urban Planning UPA Package 5, Module 1.
Wynne HARLEN Susana BORDA CARULLA Fibonacci European Training Session 5, March 21 st to 23 rd, 2012.
Planning & Scheduling Systems: From Design to Fabrication.
G052 : Publishing A04 Evaluation of Publication. Evaluation of Publication (G052) Your Publication.
Programming with Alice Computing Institute for K-12 Teachers Summer 2011 Workshop.
MAE 552 Heuristic Optimization Instructor: John Eddy Lecture #16 3/1/02 Taguchi’s Orthogonal Arrays.
Example 9.1 Goal Programming | 9.3 | Background Information n The Leon Burnit Ad Agency is trying to determine a TV advertising schedule.
Project Time Management
Design Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Implementation. We we came from… Planning Analysis Design Implementation Identify Problem/Value. Feasibility Analysis. Project Management. Understand.
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
CUPSS Training Part 2 of 3 Sessions. Housekeeping Items Telephone Number for Webinar Support – To Ask a Question – Type your question in.
Project Planning Day 2 An Old Adage: Fail to Plan... and You Plan to Fail!
SystematicSystematic process that translates quality policy into measurable objectives and requirements, and lays down a sequence of steps for realizing.
What is Business Analysis Planning & Monitoring?
OSSE School Improvement Data Workshop Workshop #4 June 30, 2015 Office of the State Superintendent of Education.
Introduction to Project Management
Chapter 8: Systems analysis and design
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
SMART Recovery ® Introduction to the CBA. SMART CBA Tutorial In this tutorial, you’ll learn how to do a SMART CBA (Cost/Benefit Analysis). A CBA is a.
CORNELL NOTES Note-taking strategy that will improve your study skills and your grades!!
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
Basic Impact Evaluation Course Poverty Analysis Initiative (C102) Poverty Analysis Initiative (C102) World Bank Institute Attacking Poverty Program.
Moving into Implementation SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED.Roberta M. Roth.
Improve – V: Pitfalls -- Finding the Time to Implement Making Time Work for You! Lori Shipman NY FarmNet Consultant 415 Warren Hall Ithaca, NY
L EADERSHIP PRACTICES : M INUTE WRITING CE-ELM MSA, 18 th APRIL, 2011 SESSION 3.
Dana Nau: CMSC 722, AI Planning Licensed under the Creative Commons Attribution-NonCommercial-ShareAlike License:
SUSTAINING THE ANALYSIS Module 2 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Note-taking Strategies.  I can’t write everything down the teacher says because he/she talks TOO fast!  I can’t read my notes.  The notes I take when.
Summer Computing Workshop. Introduction  Boolean Expressions – In programming, a Boolean expression is an expression that is either true or false. In.
What is Expected in Updating Your SIP? Metro-Nashville Public School System School Improvement Plan Process September 2008.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
Chair & Minute Taking Training Isabel Costello, Student Voice Coordinator (Course Reps & Quality)
The Fundamentals of the Global Marketing Mix
Lieutenant Promotional Tactical Orientation. Overview Exam Proctor’s Role Room Layout You as the Candidate The Tactical Problem Testing Dimensions and.
Consensus Validation A Tool for Teams GALA Leadership Symposium October 11, 2013 Presenter: Mindy Taylor.
Project Control n How do I spot problems? n What do I do once I find them? n How do I stay on track? n What happened to my plan? n How do I stay flexible?
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
How to Write a Project Proposal Specialization Introductory Module Thursday, May 9, 2013 Barbados.
Unit 1. Introduction Creativity: The production of an idea, concept, creation or discovery that is new or original to its creator or a new combination.
DEBONO’S JOURNALISTIC SIX (HATS). Learning Outcomes  Apply the six thinking hats method of decision making  Evaluate effectiveness of the six thinking.
Algebra2/Trig1.  The following website has a variety of information concerning scatter plots.  While viewing the site answer the questions given to.
IB Exams May 2016 It’s GO time!. Testing Calendar.
CD FY09 Tactical Plan Review FY09 Tactical Plans for Computing Infrastructure Igor Mandrichenko 9/24/2008.
Science Notebook Guide Who needs a Science Notebook? What materials do I need to make a Science Notebook? When is it due? Where will I keep it? Why do.
Top 10 Critical Issues Lists
Iterative Risk Management Workflow Tool
CARF Canada Performance Measurement Outcomes
Strategic Prevention Framework - Evaluation
5S Numbers Game The purpose of this game is to demonstrate the impact the way our workplace is arranged impacts on how the work is done.
Paper and Tutorial Presentation Template and Information
Survival Team Exercise
Activity “We discussed how easy ideas would be to implement and how valuable they would be to public and patients. The first thing I noticed was that there.
Meeting, training & teaching in the interactive iWorld
Plan the implementation of change
Getting from Idea to Implementation Tactical Planning
Section 2.0 Project Management Overview
Project - Execution stage
Session: 6 Understanding & Using the RDQA Tool Output
Determining Eligibility
Bulloch Information Session
Basic Design Documentation
Optimist International
7. EAFM cycle overview Essential EAFM Date • Place 1.
Time Scheduling and Project management
Presentation transcript:

Improve - IV: Getting from Idea to Implementation Tactical Planning Is it Working? How Soon will You Know? Control Planning This module originated by: John Conway – PRO-DAIRY 123 Lake St. Cooperstown, NY

Learning Objectives:  Develop a robust implementation plan. Co-create a plan to find discretionary time needed to make it happen through priority setting/time management.  Match the implementation plan with a control plan that answers the “is it working” question early on Approximate Time Needed:  30 minutes AV Equipment Needed:  LCD Projector and screen  Laptop Computer running MS PowerPoint  Flip chart and pens  Overhead projector and pens Tactical Planning Module

Prelude This module may be a stand alone or at a point designated (slide 8), switch over to Time Management. Then come back and re-start with slide 10. It just depends on how you structure the sessions in the overall workshop.

Presenter: Title Slide Quickly introduce yourself This module helps you evaluate your goals and put them into action

Improve - IV: Getting from Idea to Implementation Tactical Planning Is it Working? How Soon will You Know? Control Planning John Conway – PRO-DAIRY

Presenter: Implementation Plan  The Implementation Plan worksheet is in a booklet format. The cover allows you to identify the plan based on a project name, date and who is involved.

Implementation Plan for ____________________Project Date Formulated: ________________ Achieving the goals of a planned project requires a sequence of actions (tactics). Assuring the actions taken are actually leading to the goal requires proof (control points) along the way. This project plan lays side-by-side tactical and control components to help meet your SMART* goal. While most control points may pertain to the goal that has been set, you may find important tactics also demanding control. Additions to the initial plan are commonplace, leading to a growing document that seconds as a communications tool to keep everyone on track. *Specific, Measurable, Attainable, Realistic and Timed People Involved: _________________ _________________

Presenter: Implementation Plan  Inside left is the tactical plan. The grid is set up to help evolve all aspects of getting a project going. Using it helps trigger sub sequential steps which are overlooked when working from the “seat of the pants”.  Like most modern businesses dairies tend to consume all of everyone’s workday with activities. We added the “What’s Got to Give to Make this Happen” column so worthy projects get traction. Unless some time is prioritized, the project may be “on paper only”.  You can either switch from this presentation to the “Priority Setting/Time Management” module at this point (fits the context) or continue with this.*  If you have been working the full group by using flipchart and/or acetate worksheets and an overhead projector, using a clean tactical plan sheet should work well. Take the group generated “winning” idea and run through as many tactics as you can collectively think of to give the project wheels. Asterisk the ones that probably only came up after writing down a prior tactic.

Implementation Plan for _______________________ Project Tactical Plan What task or activity is to be done? Who is Responsible? How and/or where should the task be done? When to perform task or activity (deadline, frequency, under what conditions?) when done What’s“got to give”for this to happen?

Presenter: Is it Working  Title page to introduce control plan worksheet.

Is it Working? Measured Impacts Control Planning

Presenter: Control Plan Inside right is the control plan. It is complementary to the tactical plan and is best viewed like this on an apposed page. Again, grid elements are designed to be thorough and to help beg the next line. Since timing can be a critical factor, an early indicator which is not definitive proof the plan is working may be in there. For example, you may monitor 1st test butterfat percent as a proxy for sub-clinical ketosis when the plan is to help minimize fresh cow problems. Later you may have more definitive data, but in the short run the trend may be positive. If you have been working the full group by using flipchart and/or acetate worksheets and an overhead projector, using a clean control plan sheet should work well. Take the group generated tactical plan and marry a control plan to it. Again, note the line items which emerged from seeing other line items on paper.

Implementation Plan for _______________________ Project Control Plan What Critical Control Points* will be monitored? Monitoring procedure including who’s responsible? Monitoring time interval? Standard to meet with upper/lower limits? If standards not met, who’s responsible to reformulate plan? *What are the earliest measurable indicators that either individualdual tactics or the goal itself will be realized?

Presenter: Case Farm  Alternative exercise for sub- groups

…Back to Your Farm or Case Farm one last time Using your “winning” improvement in the decision grid, take it for a spin through the tactical and control plan template. Naturally you are making most of this up. But stick with it for a few lines so you can see how one tactic leads to another, and that it’s definitely worth getting on paper! Likewise with control… it’s not always as easy as it would seem to answer “is it working at least as well as expected” early on.

Implementation Plan for _______________________ Project Tactical Plan What task or activity is to be done? Who is Responsible? How and/or where should the task be done? When to perform task or activity (deadline, frequency, under what conditions?) when done What’s“got to give”for this to happen?

Implementation Plan for _______________________ Project Control Plan What Critical Control Points* will be monitored? Monitoring procedure including who’s responsible? Monitoring time interval? Standard to meet with upper/lower limits? If standards not met, who’s responsible to reformulate plan? * What are the earliest measurable indicators that either individual tactics or the goal itself will be realized?

Presenter: Tactical Plan Example  A filled out tactical plan for building and installing swivel-up isolation boxes (“winner” from decision grid). Can be used as an example if time is short.

Presenter: Control Plan Example  A filled out control plan to complement the “isolation box” tactical plan. Can be used as an example if time is short.