Kinetic Opportunities At PuebloPlex Can LRAs Benefit from Energy Development? September 26, 2013.

Slides:



Advertisements
Similar presentations
NAS Brunswick Story Steve Levesque, Executive Director, MRRA September 26, 2013.
Advertisements

Future Planning and Zoning of the Umatilla Army Depot
2011 ADC WINTER FORUM | PAGE 2 Army Energy - A Player in the New California Gold Rush Leveraging Private Financing for Increased Renewables Ms. Aubris.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
Templeton Gap Landfill Jesse Silverstein Executive Director Colorado Brownfields Foundation.
Reformed commercial and industrial zones for Victoria Presentation by Paul Buxton, Statutory Systems, Department of Planning and Community Development.
Mississauga, Ontario has expanded and prospered over the last 25 years. It has the enviable reputation of being one of the fastest growing cities in Canada.
On August 22, 2005 the Federal Base Realignment and Closure (BRAC) Commission voted to close Naval Air Station Brunswick (NASB) NASB is a 3,200 acre property.
2011 ADC WINTER FORUM | PAGE 1 Navy Use of § 2922 Authority CAPT Clayton Mitchell NAVFAC Energy Office.
Building Maine’s Clean Tech Corridor.  Background  Concept and Vision  Role in Maine’s Clean Tech Corridor  Summary.
1 IIFREE, NOVEMBER 16 th -18 th 2014 INTERNATIONAL INVESTMENT FORUM FOR RENEWABLES ENERGY & ENERGY EFFICIENCY FOR MENA Gianni Chianetta.
Class 5b: Population and Migration Push and pull factors Types of migration Determining destinations.
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
Dod deputy general counsel Environment, energy and installations
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
Draft Energy Policy for Nairobi City County An Initiative of UN-Habitat in Collaboration with Nairobi City County Rose Muema Chief Officer, Urban Planning.
Mayor Sheila Dixon’s BRACTION Plan for Baltimore City.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
A+ for Energy ® Energy Educator Training Conferences Sponsored by BP, Presented in Partnership with The NEED Project and NREL Texas Energy Story.
Slide 1 Patents Pending © SolFocus, Inc Solar CPV 201 September 15, 2010 Kelly Desy Manager, Government Relations and Public Policy.
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
Oktober 2011 Opportunities sustainable Aruba TNO perspective Mart J. van Bracht.
The Data Explosion – Finding What Municipalities Need Julie A. Jacobson, Auburn Town Manager May 21, 2015 Central Mass Data Day 2015.
CONFIDENTIAL AND PROPRIETARY Invenergy’s Views on Cogeneration Opportunities Presented to: April 30, 2015.
ENERGY MARKET PERSPECTIVE
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Asset Management January 15, 2013.
THE FUTURE OF THE ARVADA CENTER FOR THE ARTS AND HUMANITIES.
Peak Oil Opportunities and Challenge at the end of Cheap Petroleum Richard Heinberg Scripps College September 18, 2006 The Challenge of Peak Oil Richard.
BRAC: Using Lessons Learned to Address the Resource Challenges of Today August 7, 2012 Dr. Craig College, Deputy Assistant Chief of Staff for Installation.
Partnerships “Our Experience and the Road Ahead” Klamath Basin Community, Oregon Lt Col Lance “Axe” McCuiston 5 August 2012 Air National Guard (ANG) Installations.
28 February ADC WINTER FORUM | PAGE 2 Marine Corps Installations Command (MCICOM) G-7, Government and External Affairs Ms. Lynn Landers.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Real Property Agency Air Force BRAC Program Mr. Thomas B. Kempster Special Assistant.
Lyell McEwin Health Precinct Master Plan Presentation to LGA Mike Richards October 2014.
The Story of River’s Edge Turning a Sow’s Ear into a Silk Purse September 25, 2013.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 1 How to Determine to Pursue an EUL or PPA Mr. Brian Brown Chief – Air Force Strategic Asset Utilization.
Assistant Secretary of the Army (Installations, Energy & Environment) DRAFT DECK Current issues Potential challenges and Opportunities Hon. Katherine Hammack.
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
22ha site suited for industry & logistics GUGESTI, ROMANIA:
Nevada National Security Site (NNSS) Nevada Field Office (NFO) FY 2015 Status Report Milinka Watson-Garrett Analytical Services Manager U.S. Department.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Energy Security Air Force Civil Engineer Center Perspective Mr Billy P. Webb, P.E. AFCEC/COSC January.
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
Renewable Energy Potential at Contaminated Lands and Abandoned Mining Sites ConSoil 2008 June 5, 2008 Milan, Italy.
London Dockland Development Corporation An example of urban renewal.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
GEOGRAPHY QUIZ Impact of Industrialization and Urbanization.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
EMS and Mortars: Environmental Management at the Army’s Chemical Weapons Destruction Facilities June 5, 2007.
Bearcreek coal field, Montana, USA. This undervalued asset comprises over 389MM tons of high btu coal US COAL RESERVES AVAILABLE FOR JOINT VENTURE.
Sun City U.S.A "New Day in the Sun". Peak Electric Demand Growing.
ULI Symposium: Central City Commercial Development 1988.
Session 21 (R) Utility Scale Solar Development Land and Permitting Issues March 30, 2016.
SEC598F15 vs SEC598S16 January 11, Learning Outcomes (598F15) PV System Engineering An understanding of the solar resource An understanding of the.
MetroGreen A proposed 1,440 mile interconnected system of public and private open space, greenways and trails.
Sustainable precinct development: opportunities, challenges and enabling mechanisms SUDF Gavin Ashley Coordinator - Sustainable Design Assessment.
Utah’s Military installations
at “Progress” Miles Carden – EZ Manager
Towards a 100% Renewable Energy Supply “Renewables Working Together”
Northern Colorado Regional Airport Commission
West Midlands Combined Authority: Seizing the Opportunity
Hart’s Mill Ecovillage and Farm
Go LNG LNG Value Chain for Clean Shipping, Green Ports and Blue Growth in Baltic Sea Region.
Building the Economy with Clusters
2040 Comprehensive Plan Open House
Decarbonisation objective
Rural Population Growth Policy
The Arms and Space Race Unit 9: Cold War.
Brunswick Landing Microgrid Development
Project Directors Report to 
Surrey County Council – Development of the Asset and Place Strategy
Presentation transcript:

Kinetic Opportunities At PuebloPlex Can LRAs Benefit from Energy Development? September 26, 2013

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 3 3 PuebloPlex Background  Established as the Pueblo Army Depot in 1942  Originally for the storage and supply of ammunition  Employment fluctuated between 1,400 and 1,800 during WWII  At the end of WWII, the facilities were expanded to intake war materiel  Mission Change in 1951 – Mission Migration  Regional storage facility for strategic and critical materials  Calibration and maintenance of multiple platforms  Peak employment on April 3, 1953 with 7,791 people on payroll  15% of Pueblo’s population worked at the Pueblo Army Depot  Nearly 2 of 5 workers in Pueblo, worked at the Pueblo Army Depot; so this location has a history and a LORE

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 4 4 PuebloPlex Background  Chemical weapons arrive in 1952  Pershing Missile Destruction  Intermediate-Range Nuclear Forces Treaty (INF)  War Memorabilia  Nazi art and relics held for repatriation to (West) Germany into the late- 1990’s  Base Re-Alignment and Closure (BRAC) 1988 Round  Mission consolidation of 1951 reversed; mission dispersed  Chemical Weapons Destruction  Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction  Sole remaining mission: Safely Store Chemical Weapons Awaiting Final Destruction Miami Vice – c. 1988

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 5 5 PuebloPlex Facts  Assets to be developed:  22,847.5 acres of land – 7,000.5 acres reserved for chemical destruction (2021); 15,847 acres for immediate development  1,136 structures – 6.5m sf; 3.1m sf under current master lease  160 miles of paved road  48 miles of rail  Master lease terminates February 29, 2016; negotiating extension presently  Largest economic development by land size in the BRAC process – equivalent to Cheyenne; 1/3 larger than Longmont, CO; 10% larger than Boulder, CO; 68% larger than Portland, ME’s land area of sq mi.

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 6 6 PuebloPlex – Site Re-Use Plan (Subject to reconfiguration in 2014) UseSpace (Acres)Percent Usage Recreational % Industrial8, % Residential % Wildlife Management Area 14, % Total22, %

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 7 7 Opportunity Continuum Urban LRARural LRA Renewable Energy Conventional Energy PuebloPlex seeks to attract utility-scale projects that fully utilize the space available, contribute to energy independence and attract high-paying, skilled positions.

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 8 8 PuebloPlex Preparedness  Impediments  Master Lease through 2/19/2016  Staggered conveyances anticipated  60 SWMUs on site – working on curtailing land-use restrictions  Re-doing re-use plan in 2014  Highly sensitive mission on site until 2021  Toxic mission may cause trepidation

2013 ADC BASE REDEVELOPMENT FORUM | PAGE 9 9 PuebloPlex Preparedness  Positives  Wide O P E N spaces; ~ 23,000 acres  Suitable for utility scale (solar) projects  NREL studied – January 2012  Utility infrastructure surrounding PuebloPlex  Renewable content legislation in Colorado  Politically supported; statutorially supported  Large tracts of undeveloped land

2013 ADC BASE REDEVELOPMENT FORUM | PAGE PuebloPlex Map

2013 ADC BASE REDEVELOPMENT FORUM | PAGE NREL Study – January 2012 LocationGlobal Insolation (kWh/m 2 /Day) Resource Classification Pueblo Chemical Depot 5.97 to 6.01Excellent 30 MW PV30 MW CPV100 MW CSP Land Use (acres/MW) 767 Total Land Required (acres)

2013 ADC BASE REDEVELOPMENT FORUM | PAGE Colorado Renewable Energy Requirements

2013 ADC BASE REDEVELOPMENT FORUM | PAGE PuebloPlex Projects  No active projects  Legal restrictions – predicated on modified (updated) land use plan (2014)  Utility size projects only  Potential off-takers: Xcel, Black Hills, Tri-State  Part of a privatization of electrical infrastructure  Seeking projects creating net-value  Not seeking to throw money away  Positive return and long term growth

2013 ADC BASE REDEVELOPMENT FORUM | PAGE  Michael Clarkson  Analyst & Project Manager PO Box Pueblo, CO  