Federal Transit Administration Federal Highway Administration City of Vancouver City of Portland SW Washington Regional Transportation Council Metro C-TRAN.

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Louisiana Safe Routes To School Program
Alternative Transportation in Parks & Public Lands SAFETEA-LU Section 5320 administered by FTA in consultation with DOI and DOA. TEA-21 Section 3039 Study.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
New I-65 Interchange at Worthsville Road Welcome!.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Los Angeles County Metropolitan Transportation Authority Metro Green Line Eastern Extension Summary of January 1993 Final Environmental Impact Report.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Longmeadow Parkway Fox River Bridge Corridor
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Safe Routes to School: An update on programs, practice and how public health is playing a role Nancy Pullen, MPH, Program Manager September 14, 2006.
Application of SHRP2 Decision Support Tool to SR 509 Corridor Planning The 14th TRB National Transportation Planning Applications Conference May 8, 2013.
Transportation Planning Board: Background, Constrained Long- Range Plan, and Ongoing Work Presentation to the Board of Directors Metropolitan Washington.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
What are Intelligent Transportation Systems? Intelligent Transportation Systems (ITS) are existing and new technologies, including information processing,
Plan and TIP Prioritization Process September 2015.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
MOBILITY 2030: THE METROPOLITAN TRANSPORTATION PLAN FOR THE DALLAS-FORT WORTH METROPOLITAN AREA North Central Texas Council of Governments Transportation.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
POS Regional Transportation Investments Viaduct/Seawall Discussion September 15, 2004.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Transportation Investment Act of 2010 AASHTO/MTAP Conference December 6-9, 2010 Savannah, Georgia Steve Kish, Transit Program Manager Georgia Department.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
Steve Heminger Executive Director, MTC AMPO Annual Conference Washington, D.C. – October 23, 2003 Playing in Traffic: A New Look at Management and Operations.
Lakes Region Transportation Workshop November 15, 2013.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 37) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Industry Briefing 25 May 2016.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Unit 1 THE TRANSPORTATION PLANNING PROCESS AND THE ROLE OF THE MPO LCTCC Educational Program.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 31) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
Railroad Quiet Zone (RRQZ) And Crossing Safety Improvement Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Transportation Management Plan Modernization Project
Construction Management & Inspection
I-81 Corridor Improvement Plan
Transportation Management Plan Modernization Project
MPO Board Presentation
Presentation transcript:

Federal Transit Administration Federal Highway Administration City of Vancouver City of Portland SW Washington Regional Transportation Council Metro C-TRAN TriMet A long-term, comprehensive solution 2011 Road Design Conference November 2, 2011 Casey Liles CRC Highway Engineering Manager

A corridor of the future 2 Critical link between Canada and Mexico Estimated $40 billion in freight crosses the bridge annually One-of-a-kind project

CRC project area 3

4

Seven closely spaced interchanges Standard Spacing:Desirable = 2 Miles Minimum = 1 Mile mi 0.5 mi 0.9 mi 0.6 mi 0.5 mi 0.8 mi

75% of southbound traffic to/from 7 interchanges 6 Source: CRC Traffic Technical Report, 2011

Vertical constraints 7

Number of crashes between High crash locations - Vancouver Crashes 3 to 4 times more likely when bridge lift occurs 400 crashes/year; expected to increase to 750 by 2030 Source: CRC Traffic Technical Report, 2011

High crash locations - Portland Number of crashes between Crash rates for 5-mile I-5 Bridge Influence Area twice as high as comparable inner-urban freeways Crash frequency highest in locations with non- standard features Source: CRC Traffic Technical Report, 2011

$40 billion in freight crosses bridge; $71 billion by % of traffic was freight in 2005 (11,000 trucks); 11% by % of freight trucks crossing bridge uses an interchange in project area Trucks traveling in project area are more likely to be involved in a crash Freight impaired by congestion 10

Existing bus service is subject to congestion Local bus service requires a transfer Bike and pedestrian path across bridge is substandard –Path is only 4 feet wide, next to freeway traffic –Discourages use Limited travel options 11

Aging bridges built in 1917 and 1958 Existing bridges do not meet current seismic safety standards Current wooden pilings do not reach solid rock Earthquake risk 12

Public process to develop solutions 2001 – 2002 I-5 Transportation and Trade Partnership 2005 – member CRC Task Force 2008 – today Project Sponsors Council and citizen advisory groups More than 29,000 people engaged at over 950 events 13

Replacement I-5 bridge Improvements to closely-spaced highway interchanges Light rail extension to Vancouver Pedestrian and bicycle facility improvements Long-term, comprehensive solution to improve safety and reduce congestion 14

Increased safety and reduced congestion by replacing the I-5 bridge 15

16 Interchange improvements - WA

17 Interchange improvements-OR

Roadway improvements

Get people out of traffic Connection to more than 52 miles of rail network in the region Encourage up to 6 million transit boardings per year Increased safety and reduced congestion by extending light rail 19

Federal Transit Administration Federal Highway Administration City of Vancouver City of Portland SW Washington Regional Transportation Council Metro C-TRAN TriMet Project Status Update

Researched in-water pile installation and noise reduction techniques Objectives: –Evaluated construction noise –Assessed techniques to reduce effects to fish and wildlife –Evaluated pile installation methods Results: –Affirmed noise and vibration modeling –Bubble curtains effective –Fewer pile strikes needed Test pile installation 21

National Marine Fisheries Service –Received January 2011 –Not likely to adversely effect:  salmon  steelhead  sturgeon  eulachon  sea lion  killer whale Biological Opinion 22

Result of IRP findings 16-members of national and international bridge expertise Panel recommended: –Discontinue work on previous bridge type –Suggest three bridge types for further consideration  All less costly and less risky Governors’ direct project to move forward with deck truss bridge type Bridge Review Panel 23

Review by Oregon State Treasurer Recommendations: –Bond yields should be based on low end of toll revenue range –Bond yields should not assume annual toll rate increases –Finance plan should employ:  Pre-completion tolls  USDOT TIFIA assistance Treasurer recommendations have been incorporated into FEIS State treasurer review 24

Review period, Sept. 23 – Oct. 24 –Issued on behalf of:  Federal Transit Administration, Federal Highway Administration –Signed by local project partners:  Metro, Southwest Washington Regional Transportation Commission, C-TRAN, Tri-Met –Record of Decision expected in December Final Environmental Impact Statement 25 Record of Decision allows the project to: –Complete design –Begin property acquisition in 2012 –Break ground in 2013

Project to start in 2012 Purpose: –Verify load carrying capacity of soil –Evaluate constructability 2 locations –1 in WA, 1 in OR Noise and vibration monitoring Drilled Shaft and Driven Pile program 26

Responsible for: –Advising CRC project director and staff –Representing stakeholder organizations –Communicating routinely with constituencies Composed of approximately 30 members –12-15 from each state –Terms of 1-2 years Meet as large group 1-2 times a year –Vancouver and Portland subcommittees will meet times a year Bi-State Citizen Advisory Committee 27

Project development schedule 28

Federal Transit Administration Federal Highway Administration City of Vancouver City of Portland SW Washington Regional Transportation Council Metro C-TRAN TriMet 700 Washington Street, Suite 300 Vancouver WA, Washington Oregon Toll-Free